Loading...
HomeMy WebLinkAboutMoores Fork Stream Mitigation ProjectFrom: Polizzi, Maria To: Menefee -Dunn, Barbara A Subject: Fw: [External] RE: DMS Proposal for IRT Project Closeout: Moores Fork (DMS#94709) - (SAW-2011-02257) (DWR#2012-0396) - Yadkin 03040101 - Surry County Date: Monday, June 26, 2023 4:35:43 PM Attachments: image001.ona Outlook-dtgxhcu3. pnna Hi Barbara, No rush on these, I know I've sent you a few at this point, but here is another email to be filed in LF. Details are below: Project #: 2012-0396 Project Type: NCDMS Date: 6/21/23 Thanks! Maria Polizzi Stream and Wetland Mitigation Coordinator 401 & Buffer Permitting Branch Division of Water Resources, NCDEQ Office: (919)-707-9083 Cell: (919)-815-4586 Email: maria.polizzi(@deq.nc.gov Address: 512 N. Salisbury St., Archdale Building 942-H, Raleigh, NC US Mail: 1617 Mail Service Center, Raleigh, NC 27699-1617 d GiXf�� From: Isenhour, Kimberly T CIV USARMY CESAW (USA) <Kimberly.T.Isenhour@usace.army.mil> Sent: Wednesday, June 21, 2023 11:18 AM To: Wiesner, Paul <paul.wiesner@deq.nc.gov> Cc: Reid, Matthew <matthew.reid@deq.nc.gov>; Allen, Melonie <melonie.allen@deq.nc.gov>; Phillips, Kelly D <Kelly.Phil Iips@deq.nc.gov>; Tugwell, Todd J CIV USARMY CESAW (US) <Todd.J.Tugwell@usace.army.mil>; Steve Kichefski <Steven.I.kichefski@usace.army.mil>; Haywood, Casey M CIV USARMY CESAW (USA) <Casey.M.Haywood@usace.army.mil>; Davis, Erin B CIV USARMY CESAW (USA) <Erin.B.Davis@usace.army.mil>; Haupt, Mac <mac.haupt@deq.nc.gov>; Polizzi, Maria <maria.polizzi@deq.nc.gov>; Bowers, Todd <bowers.todd@epa.gov>; Wilson, Travis W. <travis.wilson@ncwildlife.org>; Leslie, Andrea J <andrea.leslie@ncwildlife.org>; McHenry, David G <david.mchenry@ncwildlife.org> Subject: [External] RE: DMS Proposal for IRT Project Closeout: Moores Fork (DMS#94709) - (SAW- 2011-02257) (DWR#2012-0396) - Yadkin 03040101 - Surry County CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Hi Paul, The IRT had a chance to review the proposed repairs for Moores Fork. I would offer the following comments: 1. Overall, the IRT is comfortable moving forward with the proposed repairs considering the site constraints and landowner issues. 2. The IRT concurs with the reduced credit ratios. 3. Considering the number of repair areas, it would have been helpful to include the areas of concern in a tabular format since the map notes several areas that are not planned for planting or repairs. Are these the areas that have remained unchanged? Or the areas that are not being repaired due to access issues? 4. It would have been beneficial to include photos of the areas of concern. 5. We are fine with the request to suspend traditional monitoring given that all vegetation plots met success criteria. 6. We'd like to see a cross-section on repair area 2 where there was an existing XS (M4). 7. During our recent site visit, we had a concern about a gully on Cow Trib 2, potentially affecting the integrity of the fence. Has this been resolved? 8. Recommend photo documentation of the repair work, Cow Trib 2 gully, Barn R1 gullies, and the previous gully stabilization repair on UT1. 9. Please coordinate with Casey on the Nationwide Permit for repairs. If this is a trout county, we'll need to coordinate with WRC. If the repairs are completed early enough, we should have enough time to observe the stability of the repairs prior to closeout. Please reach out with questions. Regards, Kim Kim Isenhour Mitigation Project Manager US Army Corps of Engineers I Wilmington District I Regulatory Division 3331 Heritage Trade Dr., Suite 105 1 Wake Forest, NC 27587 1 919.946.5107 From: Wiesner, Paul <paul.wiesner@ncdenr.gov> Sent: Wednesday, May 24, 2023 3:49 PM To: Haywood, Casey M CIV USARMY CESAW (USA) <Casey.M.Haywood@usace.army.mil>; Davis, Erin B CIV USARMY CESAW (USA) <Erin.B.Davis@usace.army.mil>; Isenhour, Kimberly T CIV USARMY CESAW (USA) <Kimberly.T.lsenhour@usace.army.mil>; Kichefski, Steven L CIV USARMY CESAW (USA) <Steven.L.Kichefski@usace.army.mil>; Tugwell, Todd J CIV USARMY CESAW (USA) <Todd.J.TugwelI@usace.army.miI> Cc: Reid, Matthew <matthew.reid@ncdenr.gov>; Allen, Melonie <melonie.aIlen@ncdenr.gov>; Phillips, Kelly D <Kelly.Phil Iips@ncdenr.gov> Subject: [Non-DoD Source] DMS Proposal for IRT Project Closeout: Moores Fork (DMS#94709) - (SAW-2011-02257) (DWR#2012-0396) - Yadkin 03040101 - Surry County Importance: High Good afternoon Casey, Erin, Kim, Steve and Todd, DMS met with the IRT at the Moores Fork stream mitigation project on March 15, 2023. This site was scheduled for regulatory closeout; however, it was withdrawn due to several areas of concern. The IRT site visit focused on developing a path toward regulatory closure. At the conclusion of the meeting, the IRT requested that DIMS propose a repair plan and a path for project closure. The attached proposal outlines the DMS multi -faceted approach utilizing a combination of repairs, planting, credit reduction and ongoing invasive treatment and beaver maintenance to address the issues identified at the March 15th meeting. DMS is proposing to implement the repairs in January 2024 and seeks to close the site in November/December 2024. DMS requests that the IRT review the attached proposal and inform DMS if this proposal is acceptable. DMS is constrained by State contracting time frames, so any urgency surrounding the IRT review time would be greatly appreciated. Project Information: Moores Fork DMS Project # 94709 Institution Date: 10/18/2010—Design; Bid; Build (DBB) SAW-2011-02257 DWR# 2012-0396 Yadkin River Basin Cataloging Unit 03040101 Surry County, North Carolina Mitigation Plan Project Credits: 11,609.866 SMUs (cool) Project Credits with Proposed Reductions: 10,864.498 SMUs (cool) Thanks Paul Wiesner Western Regional Supervisor North Carolina Department of Environmental Quality Division of Mitigation Services Cell: (828) 273-1673