Loading...
HomeMy WebLinkAbout_External_ Re_ DWR20230626 additional information requested for dredging at 20521 Lagoona Drive Cornelius (2)Baker, Caroline D From: Sherry <chappellsh@yahoo.com> Sent: Saturday, June 17, 2023 4:14 PM To: Hoy, Amie Subject: [External] Re: DWR20230626 additional information requested for dredging at 20521 Lagoona Drive Cornelius Follow Up Flag: Follow up Flag Status: Flagged CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. 7. �] 9. Will work be conducted from land? [] From water? Total amount of impacts bokm the normal pool Iake level / Normal Water Level Permanent impacts (including all excavation, impacts ... ,.miare feet: backfill, rip rap, retaining walls, etc.) in square feet: Total amount of impacts abowe the normal pool lake level / Normal Water level and 5+0 feet land -ward nent impacts (including back fill, excavation, rip rap, retaining walls, etc.) In square feet: impacts (temporary clearing, construction corridor) in square feet. 10, Please describe the vegetation alowye the normal pool lake level/ 9rmal Water Level and 50 feet landward to be impacted (number of trees,, for ', 11. mature By signing below, t, as the project proponent, certify to the mellowing: The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief • The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasomdAe period of time Agents Signature• [15A NCAC 02H_ .05 I f�� Date `Agent's signature is valid only if an authorization letter from the owner is provided. 12. Please approximately sketch the following information on this plan and provide dfrnenslom for each item: a. All proposed vegetation clearing b. Location of rip rap or fill to be placed above the Full Pond/ Normal water level elevation c. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation d. Location of any proposed structures such as buildings, retaining wails, docks, etc. e. location of any excavation or dredging below the Full Pond/ Normal Water level elevation Please let me know if you need anything else. Sherry On Jun 16, 2023, at 8:45 PM, Sherry <chappellsh@yahoo.com> wrote: Can you please let me know what name is on this permit please? I'll get it back to you asap. Thanks Sent from my iPhone On Jun 16, 2023, at 3:09 PM, Hoy, Amie <amie.hoy@deq.nc.gov> wrote: Good afternoon, I will need to know the permanent impacts from the excavation in square feet for number 8. If all work will be done by water then 8 needs to be completed. If any work or removal is to be done by land, number 9 will also need to be filled out. Please see below. You may complete this page of the form and email it back to me. <image001.png> Best, Amie Hoy Environmental Specialist II Division of Water Resources Office: 704-235-2200 1 Cell: 984-789-0173 DWR website: http://www.ncwater.org <image002.png> Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized state official.