HomeMy WebLinkAbout_External_ Re_ DWR20230626 additional information requested for dredging at 20521 Lagoona Drive Cornelius (2)Baker, Caroline D
From: Sherry <chappellsh@yahoo.com>
Sent: Saturday, June 17, 2023 4:14 PM
To: Hoy, Amie
Subject: [External] Re: DWR20230626 additional information requested for dredging at 20521
Lagoona Drive Cornelius
Follow Up Flag: Follow up
Flag Status: Flagged
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message
button located on your Outlook menu bar on the Home tab.
7.
�]
9.
Will work be conducted from land? [] From water?
Total amount of impacts bokm the normal pool Iake level / Normal Water Level
Permanent impacts (including all excavation,
impacts ... ,.miare feet:
backfill, rip rap, retaining walls, etc.) in square feet:
Total amount of impacts abowe the normal pool lake level / Normal Water level and 5+0 feet
land -ward
nent impacts (including back fill, excavation, rip rap, retaining walls, etc.) In square feet:
impacts (temporary clearing, construction corridor) in square feet.
10, Please describe the vegetation alowye the normal pool lake level/ 9rmal Water Level and 50
feet landward to be impacted (number of trees,, for ',
11. mature
By signing below, t, as the project proponent, certify to the mellowing:
The project proponent hereby certifies that all information contained herein is true,
accurate, and complete to the best of my knowledge and belief
• The project proponent hereby requests that the certifying authority review and take action
on this CWA 401 certification request within the applicable reasomdAe period of time
Agents Signature• [15A NCAC 02H_ .05 I f�� Date
`Agent's signature is valid only if an authorization letter from the owner is provided.
12. Please approximately sketch the following information on this plan and provide dfrnenslom for
each item:
a. All proposed vegetation clearing
b. Location of rip rap or fill to be placed above the Full Pond/ Normal water level elevation
c. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation
d. Location of any proposed structures such as buildings, retaining wails, docks, etc.
e. location of any excavation or dredging below the Full Pond/ Normal Water level
elevation
Please let me know if you need anything else.
Sherry
On Jun 16, 2023, at 8:45 PM, Sherry <chappellsh@yahoo.com> wrote:
Can you please let me know what name is on this permit please? I'll get it back to you asap. Thanks
Sent from my iPhone
On Jun 16, 2023, at 3:09 PM, Hoy, Amie <amie.hoy@deq.nc.gov> wrote:
Good afternoon,
I will need to know the permanent impacts from the excavation in square feet for
number 8. If all work will be done by water then 8 needs to be completed. If any work or
removal is to be done by land, number 9 will also need to be filled out. Please see
below. You may complete this page of the form and email it back to me.
<image001.png>
Best,
Amie Hoy
Environmental Specialist II
Division of Water Resources
Office: 704-235-2200 1 Cell: 984-789-0173