HomeMy WebLinkAboutNC0031046_CEI_Letter_20230601ROY COOPER
Governor
ELIZABETH S. BISER
Secretary
RICHARD E. ROGERS, JR.
Director
NORTH CAROLINA
Environmental Quality
June 1, 2023
Colonial Pipeline Company
Attn: John M. Wyatt, Vice President of Operations
5251 Hwy 153, Ste C #365
Hixson, TN 37343
SUBJECT: Compliance Evaluation Inspection
Colonial Pipeline — Greensboro Junction WWTF
NPDES Permit #: NCO031046
Guilford County
On May 17th, 2023, Division of Water Resources staff Ron Boone conducted a routine
compliance inspection at Colonial's Greensboro Junction WWTF. Gary Simcox, Operator in
Responsible Charge, Kyle Boyan, Operations Manager, and David Reedy, II, Environmental
Specialist, were present during the inspection. A review of records, data, treatment components,
and structures was completed. This inspection reflected compliance with the subject permit.
Items of concern:
The facility has experienced intermittent exceedances of the MTBE permit limit for
outfall 004. The presence of MTBE at this outfall is assumed to be due to a groundwater
contamination site that Colonial has been remediating. Colonial personnel have requested
elimination of outfall 004 based on their contention that outfall 004 does not discharge
offsite. The Division does not agree with this contention and concludes that the
monitoring of outfall 004 must continue as specified in the permit as the outfall does
discharge to waters of the State. It is noted that Colonial is employing surface aerators in
the pond upstream of outfall 004 to volatilize the MTBE before it reaches outfall 004, as
well as using a carbon filtration system to remove any remaining MTBE before the
outfall 004 sampling point.
Other observations:
1. Flow is calculated using the rational method specified in Part I, Paragraph A.(7.) of the
permit.
2. January and April 2023 discharge monitoring reports and laboratory reports were
reviewed and no discrepancies were noted.
No other items of concern were noted.
DffNorth Carolina Department of Environmental Quality I Division of Water Resources
oan caaouNn
Winston-Salem Regional Office 1 450 W. Hanes Mill Rd, Suite 300 I Winston-Salem, North Carolina 27105
M336.776.9800
oep.m.m or em�nmen� Qualm
Please be aware that pursuant to North Carolina general statute (NCGS) 143-215.6A, the
Division may assess civil penalties not to exceed $25,000 per day against any person who fails to
fully comply with the requirements of a permit issued pursuant to NC General Statute (NCGS)
143-215.1., as is NC0088552.
If you have any questions or concerns, please feel free to contact Mr. Boone at any time by
phone at 336-776-9690, or by email at ron.boonekdeq.nc.gov. Thank you for your time and
attention to this matter.
Sincerely,
DocuSigned by:
OD2D3CE3F 1 B1456...
Jennifer F. Graznak, Assistant Regional Supervisor
Water Quality Regional Operations Section
Winston-Salem Regional Office
Division of Water Resources, NCDEQ
Attachments:
Water Compliance Inspection Report
REQ� North Carolina Department ofEnvironmental Quality I Division ofWater Resources
Winston-Salem Regional Office 1 450 W. Hanes Mill Rd, Suite 300 1 Winston-Salem, North Carolina 27105
NORTH CAROLINA 336.776.9800
eaparMeM of EmironmanW 9uallly
United States Environmental Protection Agency
Form Approved.
EPA Washington, D.C. 20460
OMB No. 2040-0057
Water Compliance Inspection Report
Approval expires 8-31-98
Section A: National Data System Coding (i.e., PCS)
Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type
1 IN 1 2 u 3 I NC0031046 111 121 23/05/17 I17 18 LC] I 19 I s I 20L]
21111I I I I I I I II I I I I I I I I I I I I I I I I I I I I I I I II I I I I I r6
Inspection
Work Days Facility Self -Monitoring Evaluation Rating B1 QA ---------------------- Reserved -------------------
67
I 72 I ni I 71 I 74 79 I I I I I I I80
701 I 71 I LL -1 I I
LJ
Section B: Facility Data
Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include
Entry Time/Date
Permit Effective Date
POTW name and NPDES Dermit Number)
02:OOPM 23/05/17
22/06/01
Colonial Pipeline - Greensboro Junction WWTF
Exit Time/Date
Permit Expiration Date
03:30PM 23/05/17
26/08/31
Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s)
Other Facility Data
Gary W Simcox/ORC/336-288-7180/
Name, Address of Responsible Official/Title/Phone and Fax Number
Contacted
Michael Cutting, //336-931-6020/
No
Section C: Areas Evaluated During Inspection (Check only those areas evaluated)
Permit 0 Flow Measurement Operations & Maintenar Records/Reports
Self -Monitoring Progran 0 Facility Site Review Effluent/Receiving Wate Laboratory
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers Date
Ron Boone DWR/WSRO WQ/336-776-9690/
by: 6/1/202 3
LODocuSigned
*%,Z x. YpJOO11vel
F9BB6
Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date
DocuSigned by:
MAC' , '-4. � DWR/WSRo 336-776-9695 6/1/2023
`UULU6CE3FI b14bb.-
EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete.
Page#
NPDES yr/mo/day Inspection Type
NCO031046 I11 12I 23/05/17 117 18 i c i
(Cont.)
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
On May 17th, 2023, Division of Water Resources staff Ron Boone conducted a routine compliance
inspection at Colonial's Greensboro Junction WWTF. Gary Simcox, Operator in Responsible Charge,
Kyle Boyan, Operations Manager, and David Reedy, II, Environmental Specialist, were present during
the inspection. A review of records, data, treatment components, and structures was completed. This
inspection reflected compliance with the subject permit.
Items of concern:
1. The facility has experienced intermittent exceedances of the MTBE permit limit for outfall 004. The
presence of MTBE at this outfall is assumed to be due to a groundwater contamination site that
Colonial has been remediating. Colonial personnel have requested elimination of outfall 004 based
on their contention that outfall 004 does not discharge offsite. The Division does not agree with this
contention and concludes that the monitoring of outfall 004 must continue as specified in the permit
as the outfall does discharge to waters of the State. It is noted that Colonial is employing surface
aerators in the pond upstream of outfall 004 to volatilize the MTBE before it reaches outfall 004, as
well as using a carbon filtration system to remove any remaining MTBE before the outfall 004
sampling point.
Other observations:
1. Flow is calculated using the rational method specified in Part I, Paragraph A.(7.) of the permit.
2. January and April 2023 discharge monitoring reports and laboratory reports were reviewed and
no discrepancies were noted.
No other items of concern were noted.
Page#
Permit: NCO031046 Owner -Facility: Colonial Pipeline -Greensboro Junction V
Inspection Date: 05/17/2023 Inspection Type: Compliance Evaluation
Permit
Yes
No
NA NE
(If the present permit expires in 6 months or less). Has the permittee submitted a new
❑
❑
■
❑
application?
Is the facility as described in the permit?
■
❑
❑
❑
# Are there any special conditions for the permit?
❑
■
❑
❑
Is access to the plant site restricted to the general public?
■
❑
❑
❑
Is the inspector granted access to all areas for inspection?
■
❑
❑
❑
Comment: None
Record Keeping
Yes
No
NA
NE
Are records kept and maintained as required by the permit?
■
❑
❑
❑
Is all required information readily available, complete and current?
■
❑
❑
❑
Are all records maintained for 3 years (lab. reg. required 5 years)?
■
❑
❑
❑
Are analytical results consistent with data reported on DMRs?
■
❑
❑
❑
Is the chain -of -custody complete?
■
❑
❑
❑
Dates, times and location of sampling
■
Name of individual performing the sampling
■
Results of analysis and calibration
■
Dates of analysis
■
Name of person performing analyses
■
Transported COCs
■
Are DMRs complete: do they include all permit parameters?
■
❑
❑
❑
Has the facility submitted its annual compliance report to users and DWQ?
❑
❑
■
❑
(If the facility is = or > 5 MGD permitted flow) Do they operate 24/7 with a certified
❑
■
❑
❑
operator on each shift?
Is the ORC visitation log available and current?
■
❑
❑
❑
Is the ORC certified at grade equal to or higher than the facility classification?
■
❑
❑
❑
Is the backup operator certified at one grade less or greater than the facility
■
❑
❑
❑
classification?
Is a copy of the current NPDES permit available on site?
■
❑
❑
❑
Facility has copy of previous year's Annual Report on file for review?
❑
❑
■
❑
Comment: Annual report not required.
Laboratory Yes No NA NE
Are field parameters performed by certified personnel or laboratory? ■ ❑ ❑ ❑
Page# 3
Permit: NCO031046
Inspection Date: 05/17/2023
Laboratory
Owner -Facility: Colonial Pipeline -Greensboro Junction V
Inspection Type: Compliance Evaluation
Are all other parameters(excluding field parameters) performed by a certified lab?
# Is the facility using a contract lab?
# Is proper temperature set for sample storage (kept at less than or equal to 6.0
degrees Celsius)?
Incubator (Fecal Coliform) set to 44.5 degrees Celsius+/- 0.2 degrees?
Incubator (BOD) set to 20.0 degrees Celsius +/- 1.0 degrees?
Comment: None
Effluent Sampling
Is composite sampling flow proportional?
Is sample collected below all treatment units?
Is proper volume collected?
Is the tubing clean?
# Is proper temperature set for sample storage (kept at less than or equal to 6.0
degrees Celsius)?
Is the facility sampling performed as required by the permit (frequency, sampling type
representative)?
Comment: No composite sampling is required.
Upstream / Downstream Sampling
Is the facility sampling performed as required by the permit (frequency, sampling type,
and sampling location)?
Comment: None
Lagoons
Type of lagoons?
# Number of lagoons in operation at time of visit?
Are lagoons operated in?
# Is a re -circulation line present?
Is lagoon free of excessive floating materials?
# Are baffles between ponds or effluent baffles adjustable?
Are dike slopes clear of woody vegetation?
Are weeds controlled around the edge of the lagoon?
Are dikes free of seepage?
Yes No NA NE
• ❑ ❑ ❑
• ❑ ❑ ❑
❑ ❑ ❑ ■
❑ ❑ ■ ❑
❑ ❑ ■ ❑
Yes No NA NE
❑ ❑ ■ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
❑ ❑ ■ ❑
❑ ❑ ❑ ■
■ ❑ ❑ ❑
Yes No NA NE
■ ❑ ❑ ❑
Yes No NA NE
6
Series
❑ ■ ❑ ❑
■ ❑ ❑ ❑
❑ ❑ ■ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
Page# 4
Permit: NCO031046
Inspection Date: 05/17/2023
Lagoons
Are dikes free of erosion?
Owner -Facility: Colonial Pipeline -Greensboro Junction V
Inspection Type: Compliance Evaluation
Are dikes free of burrowing animals?
# Has the sludge blanket in the lagoon (s) been measured periodically in multiple
locations?
# If excessive algae is present, has barley straw been used to help control the growth?
Is the lagoon surface free of weeds?
Is the lagoon free of short circuiting?
Comment: These are wet detention ponds.
Flow Measurement - Effluent
# Is flow meter used for reporting?
Is flow meter calibrated annually?
Is the flow meter operational?
(If units are separated) Does the chart recorder match the flow meter?
Yes
No
NA
NE
•
❑
❑
❑
•
❑
❑
❑
❑
❑
■
❑
❑
❑
■
❑
■
❑
❑
❑
❑
❑
■
❑
Yes No NA NE
❑ ❑ ■ ❑
❑ ❑ ■ ❑
❑ ❑ ■ ❑
❑ ❑ ■ ❑
Comment: Flow is calculated using the rational method specified in Part I, Paraqraph AV.) of the
permit.
Effluent Pipe
Yes
No
NA
NE
Is right of way to the outfall properly maintained?
0
❑
❑
❑
Are the receiving water free of foam other than trace amounts and other debris?
❑
❑
❑
❑
If effluent (diffuser pipes are required) are they operating properly?
❑
❑
■
❑
Comment: None
Operations & Maintenance Yes No NA NE
Is the plant generally clean with acceptable housekeeping? 0 ❑ ❑ ❑
Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable ❑ ❑ ❑
Solids, pH, DO, Sludge Judge, and other that are applicable?
Comment: None
Page# 5