Loading...
HomeMy WebLinkAboutSW3221003_Email_20230420 Peck, Kaitlin From:Farkas, Jim J Sent:Thursday, April 20, 2023 3:37 PM To:Zach Gardner Cc:rowanabcto@charlotte.twcbc.com; Christian Vestal; Mack Summey Subject:RE: \[External\] RE: SW3221003 Rockwell ABC Change Line 18 for the Entire Site Column back to 64%. Line 18 for the entire site column should reflect the %BUA for the entire project area (64%) and Line 18 for the SCM drainage area column should reflect the %BUA for the drainage area to the SCM (89%). Jim Farkas State Stormwater Engineer North Carolina Department of Environmental Quality Office: (919) 707-3646 Jim.farkas@ncdenr.gov From: Zach Gardner <zach@summeyengineering.com> Sent: Thursday, April 20, 2023 3:32 PM To: Farkas, Jim J <Jim.Farkas@ncdenr.gov> Cc: rowanabcto@charlotte.twcbc.com; Christian Vestal <christian@summeyengineering.com>; Mack Summey <mack@summeyengineering.com> Subject: RE: \[External\] RE: SW3221003 Rockwell ABC CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Jim, Please see the attached PDF’s. We are mailing out the hard copies of this submittal this afternoon. Thank you, Zach Gardner, PE Summey Engineering Associates, PLLC P.O. Box 968 | Asheboro, NC 27204 Office: 336.328.0902 | Fax: 336.328.0922 Email: zach@summeyengineering.com 1 SEA, PLLC COMPUTER FILE DISCLAIMER Any computer files included with this transmittal are for informational purposes only. Their content can be considered accurate at the time of delivery, but is subject to change, in the future, without notice. These files are not to be interpreted as final engineering drawings and are not to be used for property acquisition or project construction. Due to constant updates and revisions to computers and software packages, SEA, PLLC does not guarantee that these files can be opened or read by the recipient. Furthermore, SEA, PLLC policy does not permit the internal conversion of files to alternate software packages or operating systems. These activities, if necessary, shall be the responsibility of the recipient. By opening this file, the recipient understands that SEA, PLLC does not authorize in any way that drawing is accurate for construction material quantity takeoffs or for survey staking. From: Farkas, Jim J <Jim.Farkas@ncdenr.gov> Sent: Wednesday, April 19, 2023 1:50 PM To: Zach Gardner <zach@summeyengineering.com> Cc: rowanabcto@charlotte.twcbc.com; Christian Vestal <christian@summeyengineering.com> Subject: RE: \[External\] RE: SW3221003 Rockwell ABC Zach, I was looking over the additional information you provided on 1/19/23. Everything looks good except for a few small issues: Please correct the following: - Please revise Section IV, 10 of the Application (The Application was not revised to remove the off-site components of the drainage area to the SCM). - Please revise Line 18 of Column 1 on the Drainage Areas Page of the Supplement-EZ Form. This value should correspond to the %BUA of the drainage area to the SCM (89%) not the % BUA of the project area (64%). - Please include the riprap apron downstream of the SCM outlet pipe on plan sheets C-3 & C-7. Please provide the following: - 1x hard copy & 1x electronic copy of the revised page of the Application. - 1x hard copy & 1x electronic copy of the revised page of the Supplement-EZ Form. - 2x hard copies & 1x electronic copy of the revised plan sheets. Hard copies should be mailed to me at the following address: For FedEx/UPS: Jim Farkas 512 N. Salisbury Street, Office 640M Raleigh, NC 27604 For USPS: Jim Farkas 1612 Mail Service Center Raleigh, NC 27699-1612 Hand Delivery: Please reach out to me prior to hand delivering a submission to make sure that I (or someone else in my group) will be able to receive the submission. Do not leave the package in the foyer with the security guard. NOTE: Hard copies should not be sent to a Regional Office. Doing so will delay the review process and the submission package may be lost while being sent from the Regional Office to me in the Central Office. Electronic copies should be uploaded at the following location: https://edocs.deq.nc.gov/Forms/SW-Supplemental-Upload 2 Since these are really minor things, once I get the hard copies, anything else that may have changed from addressing these issues, and the documents are uploaded to Laserfiche (Provided everything is still in order), we can issue the permit without doing another formal review. Let me know if you have any questions. Jim Farkas State Stormwater Engineer North Carolina Department of Environmental Quality Office: (919) 707-3646 Jim.farkas@ncdenr.gov From: Farkas, Jim J Sent: Thursday, January 5, 2023 4:13 PM To: Zach Gardner <zach@summeyengineering.com> Cc: Khan, Zahid <zahid.khan@ncdenr.gov>; rowanabcto@charlotte.twcbc.com; Christian Vestal <christian@summeyengineering.com> Subject: RE: \[External\] RE: SW3221003 Rockwell ABC Good Afternoon, The Division of Energy, Mineral and Land Resources (DEMLR), received a Stormwater Management Permit Application th for the subject project on October 10, 2022. A review of that information has determined that the application is not complete. Attached is a letter describing the items that need to be submitted. If you have any questions, please feel free to contact me. My contact information is listed below. Thank you Jim Farkas State Stormwater Engineer North Carolina Department of Environmental Quality Office: (919) 707-3646 Jim.farkas@ncdenr.gov 3 From: DeBerry, Margie <Margie.DeBerry@ncdenr.gov> Sent: Monday, December 12, 2022 3:08 PM To: Zach Gardner <zach@summeyengineering.com>; Farkas, Jim J <Jim.Farkas@ncdenr.gov> Cc: Khan, Zahid <zahid.khan@ncdenr.gov>; rowanabcto@charlotte.twcbc.com; Christian Vestal <christian@summeyengineering.com> Subject: RE: \[External\] RE: SW3221003 Rockwell ABC Good afternoon Zach, Rockwell ABC is due to be reviewed on or before January 8, 2023. Please let us know if you have additional questions. Thank you, Margie DeBerry Environmental Specialist, Division of Energy, Mineral, and Land Resources North Carolina Department of Environmental Quality Office: (919) 707-9209 margie.deberry@ncdenr.gov From: Zach Gardner <zach@summeyengineering.com> Sent: Monday, December 12, 2022 2:05 PM To: Farkas, Jim J <Jim.Farkas@ncdenr.gov> Cc: Khan, Zahid <zahid.khan@ncdenr.gov>; DeBerry, Margie <Margie.DeBerry@ncdenr.gov>; rowanabcto@charlotte.twcbc.com; Christian Vestal <christian@summeyengineering.com> Subject: \[External\] RE: SW3221003 Rockwell ABC CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Jim, I wanted to reach out to see where the Rockwell ABC Store is on your review list. 4 Thank You! Zach Gardner, PE Summey Engineering Associates, PLLC P.O. Box 968 | Asheboro, NC 27204 Office: 336.328.0902 | Fax: 336.328.0922 Email: zach@summeyengineering.com SEA, PLLC COMPUTER FILE DISCLAIMER Any computer files included with this transmittal are for informational purposes only. Their content can be considered accurate at the time of delivery, but is subject to change, in the future, without notice. These files are not to be interpreted as final engineering drawings and are not to be used for property acquisition or project construction. Due to constant updates and revisions to computers and software packages, SEA, PLLC does not guarantee that these files can be opened or read by the recipient. Furthermore, SEA, PLLC policy does not permit the internal conversion of files to alternate software packages or operating systems. These activities, if necessary, shall be the responsibility of the recipient. By opening this file, the recipient understands that SEA, PLLC does not authorize in any way that drawing is accurate for construction material quantity takeoffs or for survey staking. From: DeBerry, Margie <Margie.DeBerry@ncdenr.gov> Sent: Tuesday, October 11, 2022 9:36 AM To: rowanabcto@charlotte.twcbc.com; Zach Gardner <zach@summeyengineering.com> Cc: Khan, Zahid <zahid.khan@ncdenr.gov>; Farkas, Jim J <Jim.Farkas@ncdenr.gov> Subject: SW3221003 Rockwell ABC Good morning, We received your post-construction stormwater permit application for the above mentioned project on 10/10/2022. Reviews under the standard permitting process generally take 75 calendar days, but can take up to 90 calendar days per statute (our other reviewer, Corey Anen, no longer works for the State, so this review may exceed 75 days). Please upload all documents that you mailed into our office through the link provided below. Be sure to choose the Central Office as the Primary Contact office. https://edocs.deq.nc.gov/Forms/SW-Supplemental-Upload IMPORTANT NOTE: Please ensure that each file is uploaded under its appropriate file type. Additional file types can be entered into the electronic form by clicking on the “Add Another Post-Construction File Upload” link directly below the “State Stormwater Information Uploads” section of the form. Please do not upload entire plan sets through this form, but rather upload the relevant individual sheets under the appropriate file type. Selecting the correct file type ensures that the files are properly named in the electronic repository and it helps expedite the review process. Please type in permit #: SW3221003 If you have any questions, please contact Jim Farkas Jim.Farkas@ncdenr.gov 919-707-3646. Thank you, Margie DeBerry Environmental Specialist, Division of Energy, Mineral, and Land Resources North Carolina Department of Environmental Quality Office: (919) 707-9209 margie.deberry@ncdenr.gov 5 6