Loading...
HomeMy WebLinkAboutNCC213836_NOT Closeout Documents_20230621 Sedimentation/Construction Stormwater Inspection Report North Carolina Department of Environmental Quality Land Resources: 127 Cardinal Drive Extension,Wilmington,NC 28405 (910) 796-7215 County: Duplin Project: Lee Sub-Wallace 115kV Replace Cap River basin: Cape Fear Person financially responsible:Duke Energy Progress,LLC-Randy Veltri, Project#: DUPLI-2021-011 Director of Transmission Permitting Address: 550 S.Tryon St.,Suite 4500,Charlotte,NC 1. Project Location: Fonvielle Road,Wolfscrape Pictures: No 2. Weather and soil conditions: 90 clear dry Initial inspection: Yes 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply) Degree of damage: 8. Contact made with(name): Title: Inspection report: Sent Report Date given/sent: August 23,2022 9. Corrective action needed: 10. Comments: Permanent ground cover sufficient to restrain erosion has been established.No additional self-monitoring or self-inspections are required.Project is in compliance and released under the SPCA.Termination of coverage under the NPDES General Stormwater Permit for Construction Activities(NCG01)must be requested by the permittee via a Notice of Termination(NOT).The NOT is available at: https://edocs.deq.nc.gov/Forms/NCG01-Termination.Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Brian Lambe Others present: Date of inspection: August 11,2022 Time arriving on site: 12:00 PM Time leaving site: 12:30 PM CC: