HomeMy WebLinkAboutSW6221001_Supplement-EZ Form_20230622SUPPLEMENT-EZ COVER PAGE
IF4'.'DIFDI`JI"; I..G"p�D`Dlf:.11'1
PROJECT INFORMATION... ........ ....... ...... ...... ...... ...... ...... ...... ...... ...... ...... ...... ...... ...... ...... ...... ...... ...... ...... ...... ......
...... ...... ...... ...... ...... ...... ...... ...... ...... ...... ...... ...... ...... ...... ...... ...... ...... ...... ...... ...... ...... ...... ...... ...... ...... ...... ...... ...... ...... ......
1 Project Name
...................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................
MacRidge & Chicken Road Intersection Improv.
2 Project Area (ac) .... .... .... .... .... ....
.... .... .... .... 6.6 .... .... ....
3 Coastal Wetland Area ac
0
4 SurFace Water Area (ac) .... .... .... .... ....
.... .... .... .... 0 .... .... ....
5 Is this prdRct High or Low Densit ?
High
g Does this project use an off -site SCM?
No
E 211IM1A5 11.9 IDIE:li1
Certification Statement:
I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the
information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans,
specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here.
y,�yza�C�ur�yw5�r�rr
r" •.
z SEAL
28421
1r
Signature of Designer
0612212023
Date
DRAINAGE AREAS
DRAINAGE�AREA�INFORMATION......................................
"Ent W,e S to""'"`
4
T e of SCM
Bioretention
Bioretention
5
Total drainage area s ft
289515
53746
12633
6
Onsite drainage area (sq ft
289515
53746
12633
7
Offsite drainage areas ft
0
0
0
8
Total BUA in roject (sq ft
186254 sf
41530 sf
8541 sf
New BUA on subdivided lots (subject to permitting
I
9
s ft
N/A
N/A
N/A
New BUA not on subdivided lots (subject to
10
ermittin sf
47750 sf
41530 sf
8541 sf
11
Offsite BUA s ft
12
..........................................................................................................................................................................................................................................................................................................................................................................................................................................................
Breakdown of new BUA not on subdivided lots:
- Parkin s ft
- Sidewalks ft
- Roofs ft
- Roadwa s ft
47750 sf
41530 sf
8541 sf
- Futures ft
- Other, please specify in the comment box
below s ft
New infiltrating permeable pavement on
13
subdivided lots s ft
New infiltrating permeable pavement not on
14
subdivided lots s ft
Existing BUA that will remain (not subject to
15
ermitting) (sq ft
136183 sf
16
Existing BUA that is already ermitted (sq ft
17
Existing BUA that will be removed s ft
18
..........................................................................................................................................................................................................................................................................................................................................................................................................................................................
Pe rcent BUA
64%
77%
68%
19
Design storm inches
1.0 in
1.0 in
20
Desi n volume of SCM cu ft
3330 cf
710 cf
21
Calculation method for design volume
Simple
Simple
Please use this.. space.. to.......p rovide an.......Y additional information about the
22
drainage area
9 (s:)
B...I...O...RE...TE...NT.I ON. CELL
1 Drainage area number
2 Minimum required treatment volume (cu
11
es
es
No
Yes
Yes
p (pre
..............Y.........
es
Yes
N/A
Yes
.......Y.........
es
................
Yes
................
Yes
n
0
Grass
................................................................
24 in
...............................................................
80%
................................................................
10%
................................................................
10%
................................................................
Pine Bark Fines
................................................................
25
..............................Y..................................
es
................................................................
Yes
................................................................
N/A
................................................................
N/A
................................................................
N/A
................................................................
R.R. Forebav
2
No
Yes
Yes
mp (pre
...............................
Yes
Yes
N/A
n
Grass
................................................................
30 in
8
............................0%....................................
................................................................
10%
................................................................
10%
................................................................
Pine Bark Fines
................................................................
25
................................................................
Yes
................................................................
Yes
................................................................
N/A
................................................................
N/A
................................................................
N/A
Bioretention 1 1:06 PM 6/22/2023