Loading...
HomeMy WebLinkAbout202308997 Ver 1_Riparian Buffer Authorization Request_20230620Original Submittal 6/20/2023 A. Owner/Applicant Information General Information Primary Contact Email: * Who is submitting the application?* Is there an agent working on this application but not submitting it? 1. Property Owner Information: 1a. Name on Recorded Deed:* 1b. Responsible Party: 1c. Mailing Address:* 1 d. Telephone:* 919-467-8712 HJensenPE@aol.com Please list the contact person's email for questions or payment on this project if needed. Owner Applicant other than Owner Agent Yes No Aqua North Carolina, Inc. Andrew Norris, PE (for Corporations) Street Address 202 MacKenan Ct Address Line 2 City State / Province / Region Cary NC Postal / Zip Code Country 27511 us 2. Applicant's Information (if different from owner): 2a. Name: Harold Jensen le. Email Address:* ABNorris@AquaAmerica.com 2b. Company Affiliation: Water Systems Engineering, Inc. 2c. Mailing Address: Street Address 653 Blue Rock Court Address Line 2 City Winston-Salem Postal / Zip Code 27103 2d.Telephone: 336-724-4664 2e. Email Address: Harold@Waterpuro.com State / Province / Region NC Country us B. Project Information and Prior Project History 1. Project Information 8 1a. Name of Project:* Canterbury Estates Well 1 Fe adn Mn Removal Filters (Subdivision, facility, or establishment name) 1b. Is this a publicly -funded transportation project?* Yes No 1d. Subdivision Name: Canterbury Estates le. Nearest Municipality: Durham, NC 1f. Property Size: 1.06 acres 1 g. County (or Counties) where the project is located:* Durham 1 h. Property ID# Date of Purchase 0825-25-56-0329 8/1 /1979 Tax PIN or Parcel id 1 i. Deed Information Type of Book Book# Page# Deed 1534 11 134 Map 92 3 1 j. Attach a copy of the recorded map that indicates when the lot was last platted. Click the upload button or drag and drop files here to attach document PDF only 1 k. How would you like to provide the Latitude and Longitude information? Address Lookup Manually Address Lookup Street Address 5718 Geoffrey Road Address Line 2 City Durham Postal / Zip Code 27712 Latitude* 36.1009117 Longitude* 11. Is the project located in any of North Carolina's twenty coastal counties?* 2. Surface Waters State / Province / Region NC Country us -78.9237413 Yes No 2a. Name of the nearest body of water to proposed project: * UT to Crooked Creek 2b. Water Quality Classification of nearest receiving water: WS-IV, NSW 2c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 296 (linear feet only) 3. Project Description: ...................................................................................................... 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: The property is the water supply well site for this Canterbury Estates Subdivision. The site is wooded with mixed hardwoods and pines. the property has a stream that flows to Crooked Creek and then to the Eno River and then to the Neuse River. There is an existing 10' X 10' well house that has a concrete slab floor and a stick build structure. The well house was constructed in 1979 and is now just inside the Neuse River's 100' buffer. 3b. Attach an 8 % x 11 excerpt from the most recent version of the USGS topographic map indicating the location of the site. Click the upload button or drag and drop files here to attach document 5718 Geoffrey 324.91 KB RdNC_Northwest_Du rham_20190807_TM. pdf PDF only 3c. Attach an 8 % x 11 excerpt from the most recent version of the published County NRCS Soil Survey Map depicting the project site. Click the upload button or drag and drop files here to attach document Soil —Report Map.pdf 538.08KB PDF only 4. Proposed Activity Provide a detailed description of the proposed activity including its purpose and include the type of equipment to be used: Recent changes to the state's drinking water limits requires the Community well be upgraded to iron and M The proposed work consists of expanding 8 feet to the front of the building to install two manganese filters consisting of 2 each 36" diameter tanks and associated piping. Additional to this project, a 12' X 24' concrete slab to support two 5,000 gallon polyethylene ground storage tanks. Waste backwash water will be stored in the 5,000 gallon tanks until it is hauled to a wastewater treatment plant. The site is flat and minimal grading will be required for the building slab. The site for the storage tank slab will require fill material to level it up to proposed grade. Grading and trenching will be performed by backhoe. No sanitary wastes will be generated for this project. Attach a site plan as applicable to the project: Click the upload button or drag and drop files here to attach document 5718 Geoffrey Rd 3 Site Plan.pdf 331.47KB PDF only 5. Jurisdictional Determinations LJ .... ......... ......... .......................... ....... ....... ......... ......... ... ......... ........ ......... 5a. Have jurisdictional wetlands or stream determinations by the Corps or State been requested or obtained for this property/project (including all prior phases) in the past?* Yes No 5b. Who did the determination on the jurisdictional areas? Who did the determination? List name if known Date IF Attach State Scott Vinson 12/14/2022 22-491 Buffer Letter.pdf 711.37KB (Name if known) — pdf only *** Please include the date of the determination and upload a copy of the determination. Comments: 6. Project History ......................................................................................................................................................................................................................................................................................................................................................................................................... 6a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? Yes No 7. Future Project Plans 7a. Is this project a phased project?* Yes No C. Proposed Impacts Inventory Buffer Im---�� Project is in which protected Basin? Neuse River Basin (15A NCAC 02B.0233) Catawba River Basin (15A NCAC 02B.0243) Randleman Lake Watershed (15A NCAC 0213.0250) Tar -Pamlico River Basin (15A NCAC 02B.0259) Jordan Lake Watershed (15A NCAC 02B.0267) Goose Creek Watershed (15A NCAC 0213.0606 & 15A NCAC 02B.0607) Individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. Site# - Reason I Stream Name 11 Buffer Impact*IL Impact Type11 Zone 111 Zone 2 Building Slab Tank Slab Unnamed Tributary Temporary (T) Allowable 0.00 375.00 Map label (e.g. Road Crossing 1) to Crooked Creek Perm or Temp Square Feet Square Feet Total Zone 1 Impacts: 0.00 Total Zone 2 Impacts: 375.00 Total Buffer Impacts: 375.00 Comments: The site currently used as a water supply well and requires an upgrade to treat the water for iron and manganese and radium. We need to expand the building by adding an 8' X 10' extension onto the existing building to house the new filters. Since the filter backwash water may contain radium, we will install two storage tanks to contain the backwash water until it can be pumped and hauled to a wastewater treatment plant of which Aqua North Carolina owns and operates. Land disturbance will be minimal and will be completed in less than two months. D. Impact Justification and Mitigation 1. Avoidance and Minimization la. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project. The building is minimally expanded a sufficient to contain the new filters. The storage tank slab is sized just enough to support the tanks and seismic restraints holding the tanks. Land disturbance will be minimal. Just enough to install the slabs and connecting piping. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques Silt fence will be installed on the down slope side of the site to catch nay sediment will flow that way. A construction entrance will be constructed to minimize the tacking of mud off the site. Construction will take less than 2 months and the site will be stabilized as soon as construction is completed. E. Diffuse Flow Plan .......................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... 1a. What type of SCM are you providing?* Level Spreader Vegetated Conveyance (lower SHWT) Wetland Swale (higher SHWT) Proposed project will not create concentrated stormwater flow through the buffer Other SCM that removed minimum of 30% nitrogen 1 c. Diffuse Flow Documentation Click the upload button or drag and drop files here to attach document Canterbury Estates Erosion Control.pdf 1.38MB PDF only F. Supplementary Information Environmental Documentation 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? No Violations 2a. Is the site in violation of DWR Wetland Rules (15A NCAC 02H .0500), Isolated Wetland Rules (15A NCAC 02H .1300), DWR Surface Water or Wetland Standards, or Riparian Buffer Rules (15A NCAC 02B .0200)? 2b. Is this an after -the -fact buffer authorization application? Yes No G. Additional Information Please upload any additional information you would like the Division to consider during application review. Additional Attachments: Click the upload button or drag and drop files here to attach document PDF only Additional Comments: We are under a compliance order due to the new water quality limits that requires the installation of the new filters. The amount of radium in the water has been increasing and is expected to exceed the state limits before the end of the year. Since a water supply well is an allowable activity in the buffer and the well has been in use since 1979, we respectfully requesting a quick review and approval of this project. H. Sign and Submit By digitally signing below, I certify that: o I have given true, accurate, and complete information on this form; o I agree that submission of this form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act) o I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); o I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND o I intend to electronically sign and submit the application form." Print Name:* Harold Jensen, PE Signature Submission Date: 6/19/2023 (Auto populated field) Initial Review Is this accepted into the review process?* Yes No Is this project a public transportation project?* u Yes a No ID#* 202308997 Version: * Select Reviewer: * Select Reviewing Office* Has payment been received?* Chem Smith: Cherri.Smith Raleigh Regional Office - (919) 791-4200 No Payment Needed Fee Received Need Fee - send electronic notification