Loading...
HomeMy WebLinkAbout20230198 Ver 1_More Info Received_202306235410 Trinity Road P 919.866.4951 T I M M O N S GROUP Suite F 919.859.5663 Raleighh,, NC 27607 www.timmons.cons.com June 23, 2023 Lyle Phillips U.S. Army Corps of Engineers — Wilmington District Raleigh Regulatory Field Office 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Zachary Thomas NCDEQ — Division of Water Resources Raleigh Regional Office Water Quality Operations Section Raleigh, North Carolina 27699-1628 Re: Response to Requests for Additional Information South Carter Industrial USACE AID: SAW-2023-00336 DWR #20230198 (Approx. 141.9 acres) Lee County, North Carolina Dear Mr. Phillips and Mr. Thomas, On behalf of Mark Lyczkowski, we are providing a response to the Request for Additional Information (RAI) email received on March 3, 2023, for the South Carter Industrial site, an approximately 141.9-acre site located in Sanford, North Carolina within Lee County (the Site). The revised Impact Maps have been attached showing adjustments to stream impacts 2, 3, 4, and 5, due to the Ordinary High -Water Mark (OHWM) measurements completed by Timmons Group personnel on 04/17/2023 at impact locations and design/limits of disturbance (LOD) adjustments. The results of the field work confirmed stream widths were smaller than originally depicted on the previously submitted Impact Maps. Additionally, due to the LOD changes, there are only five impacts rather than six that were depicted on the original Impact Maps. More -detailed depictions of the culvert installations at impacts 2, 3, 4, and 5 have been provided. These include profile sketches depicting the proposed culverts. All other impact amounts remain the same as reported in the Pre -Construction Notification (PCN) application dated 02/03/2023. The comments are outlined below in italics and are grouped by impact, with USACE comments in blue. Our response is below each comment. 1) USACE comments 1. Based on the information provided in the PCN, the applicant is requesting the use NWP 39 to conduct the proposed activities, which would result in a loss of 0.07 acre of stream bed. Per Regional Condition B. 5., NWPs may not be used for activities that result in the loss of more than 0.05 acres of stream bed, except of NWP 32. As such it appears that the project as proposed does not qualify for authorization under NWP 39 as requested. a. You may apply for the proposed project via the Standard Permit process, or, as an alternative, you may further avoid or minimize impacts to meet the conditions of NWP 39. ENGINEERING I DESIGN I TECHNOLOGY The overall project design has been adjusted to avoid and minimize stream impacts to the maximum extent possible. The project will now result in a loss of 0.048-acre of stream bed, which is below the 0.05-acre threshold of stream bed impacts. Therefore, the project as proposed will qualify for authorization under NWP39. 2. Per General Condition 2, no activity may substantially disrupt the necessary life cycle movements of those species of aquatic life indigenous to the waterbody, including those species that normally migrate through the area, unless the activity's primary purpose is to impound water. All permanent and temporary crossings of waterbodies shall be suitably culverted, bridged, or otherwise designed and constructed to maintain low flows to sustain the movement of those aquatic species. In order to verify compliance with GC 2 please provide profile sketches depicting the proposed culverts. The attached updated impact maps now include profile sketches of the proposed culverts located at impacts 2, 3, 4, and 5. Please review the updated Impact Maps and contact Hunter Wines at (804) 200-6386 or hunter.wines(a)timmons.com if additional information is required. Sincerely, Timmons Group Kate Hefner, WPIT, ISA-CA Environmental Scientist II Hunter Wines, PWS Project Manager [8 't fierce D S Carolina t Trace � !'nuntrr C1u G ♦� ♦n _Isa1 I Lake Tra'- L 871 Impacts Table Wetland (sq. ft) Stream (If) Stream (sq. ft) Impact Impact Impact Impact ID Temporary Permanent Temporary Permanent Temporary Permanent 1 8,895 2 73 210 3 152 1,127 4 1 1 1 1 167 1 568 5 101 205 Total 0 sq ft 8,895 sq ft 0 If 493 If 0 sq ft 2,110 sq ft 0.00 ac 0.20 ac 0.00 ac 0.05 ac Legend Project Study Limits - 141.9 Acres LOD LODI Limits of Disturbance- 97.3 Acres 0 � ao1 ao1 Proposed Storm Pipe Proposed Grading © Stream Impact © Wetland Impact Permanent Stream Impact Culvert Perennial Stream (R3) Intermittent Stream (R4) Ephemeral Stream (R6) 0.❖OW Permanent Wetland Impac1 .❖.❖.•.� Palustrine Emergent (PEM) Wetland Palustrine Forested (PFO) Wetland Existing Topography °p / 00� 00l 001 — — 001 001 001 — 00l OOl 001 Ool 001 — GO, :e 0 ♦♦/ I ♦I I I : I 1 ♦. ♦I o li r; cc O O� o CD •cc O CD U = :9• o Ln ViNO • ~ C1 Imp N (0 N • Y i 0 @ • > W N E a=oE Z u 3 O ��LU • o 0 �C' OC onnns O PROJECT NAME & LOCATION J Q H Q I z J Z z0� w DU LLI LU � V J O = z I— O DATE 10/25/2022 PROJECT NUMBER 41353.012 PROJECT NAME SOUTH CARTER INDUSTRIAL DESIGNED BY / DRAWN BY M.COOLEY 1. Waters of the U.S. within the project study limits have been located using submeter, Bluetooth GPS antennas by Timmons Group. 2. Waters of the U.S. have not been confirmed by the U.S. Army Corps of Engineers. 3. Project limits are approximate. 4. Topography based on USGS LiDAR. 5. Cowardin Stream Classifications are based on NC DWQ Stream Identification form version 4.11. These plans and associated documents are the exclusive property of TIMMONS GROUP and may not be reproduced in whole or in part and shall not be used for any purpose whatsoever, inclusive, but not limited to construction, bidding, and/or construction staking without the express written consent of TIMMONS GROUP. DRAWING DESCRIPTION FIGURE 7: PRELIMINARY JURISDICTIONAL WATERS OF THE U.S. IMPACTS MAP 4no SCALE FEET a �� 0 200 400 \�C�y PLANS PRINTED AS 11X17 ARE HALF SCALE / SCALE I SHEET NUMBER H:1 " = 200 ' 1 of 3 Y:\804\41353.012 - South Carter Industrial Park\GIS\WTIM\41353.012-PERM-WTIM.mxd [B l `. `s fierce D s Carolina t Trace � !'nuntrr Clu , *� �� am a1 Lake Tra'- r s�j Impacts Table Impact ID Wetland (sq. ft) Stream (If) Stream (sq. ft) Impact Impact Impact Temporary Permanent Temporary Permanent Temporary Permanent 1 8,895 2 73 210 3 152 1,127 4 167 568 5 101 205 Total 0 sq ft 8,895 sq ft 0 If 493 If 0 sq ft 2,110 sq ft 0.00 ac 0.20 ac 0.00 ac 0.05 ac Legend �„Y I •� Project Study Limits - 141.9 Acres LOD LODI Limits of Disturbance- 97.3 Acres Go, G0, Proposed Storm Pipe Proposed Grading © Stream Impact © Wetland Impact Permanent Stream Impact Culvert Perennial Stream (R3) Intermittent Stream (R4) Ephemeral Stream (R6) 0.❖OW Permanent Wetland Impac1 .❖.❖.•.� Palustrine Emergent (PEM) Wetland Palustrine Forested (PFO) Wetland Existing Topography am■■am■■ LOD — LOD L win $11 one _ 00 LOD LOD — _/■_'■_// Silvio / LOD LOD LOD LOD _//�// ■ / � /' �� LOD � LOD '—■/ 1-00 ---� LOD LOD � LOD I LOD � LOD — OD L LOD — _ LOD — L0° LO° / moss as win a I LOD LOD LOD — LOD 1 / ` 007 GO, — 001 GO, o'` 00� 00 GOl O a01 CIO,Goy Go, — Go, GOA GO? GOA / O GO, GOl / ` 00 p0� / off ` 0, 00, GOl 00 > ` GO, G0, GO'A so on Samoan was ol Now so@ �■■�■■�■■�■■�■=G■■�■■ 'Go swollwaso • • • ♦ • • li r; cc O O� o M • O • 0 cc = 3 Lt7 to Ncm, 1 O E • ~ C1 N • W 0 O @ • W 6 . N a=oE Z u LU 3 O ��O • Z m�H • O c N o OC O PROJECT NAME & LOCATION Q I.L � Q .z J z z0 � Q HO ULLJ Q Ill ~ v JO � z O U) DATE 10/25/2022 PROJECT NUMBER 41353.012 PROJECT NAME SOUTH CARTER INDUSTRIAL DESIGNED BY / DRAWN BY M.COOLEY 1. Waters of the U.S. within the project study limits have been located using submeter, Bluetooth GPS antennas by Timmons Group. 2. Waters of the U.S. have not been confirmed by the U.S. Army Corps of Engineers. 3. Project limits are approximate. 4. Topography based on USGS LiDAR. 5. Cowardin Stream Classifications are based on NC DWQ Stream Identification form version 4.11. These plans and associated documents are the exclusive property of TIMMONS GROUP and may not be reproduced in whole or in part and shall not be used for any purpose whatsoever, inclusive, but not limited to construction, bidding, and/or construction staking without the express written consent of TIMMONS GROUP. DRAWING DESCRIPTION FIGURE 7: PRELIMINARY JURISDICTIONAL WATERS OF THE U.S. IMPACTS MAP man�5 *none 0 man ■■so■■was ■ woommostow SCALE FEET 0 40 80 PLANS PRINTED AS 11X17 ARE HALF SCALE SCALE I SHEET NUMBER H:1"=40' 2of3 Y:\804\41353.012 - South Carter Industrial Park\GIS\WTIM\41353.012-PERM-WTIM.mxd rce D s CaroiIna F Trace � !'nuntrr CI�_il 37 un Lake Tra'- r L 8%I Impacts Table Impact ID Wetland (sq. ft) Stream (If) Stream (sq. ft) Impact Impact Impact Temporary Permanent Temporary Permanent Temporary Permanent 1 8,895 2 73 210 3 152 1,127 4 167 568 5 101 205 Total 0 sq ft 8,895 sq ft 0 If 493 If 0 sq ft 2,110 sq ft 0.00 ac 0.20 ac 0.00 ac 0.05 ac Legend �„Y I •� Project Study Limits - 141.9 Acres LOD LODI Limits of Disturbance- 97.3 Acres °o, °0, Proposed Storm Pipe Proposed Grading © Stream Impact © Wetland Impact Permanent Stream Impact Culvert Perennial Stream (R3) Intermittent Stream (R4) Ephemeral Stream (R6) Permanent Wetland Impact / Palustrine Emergent (PEM) Wetland Palustrine Forested (PFO) Wetland Existing Topography 00 00 00 00 00 00 00 SOD ` O l O ��X "0 � o / 0 0 0� ooIs ' \ o°mom. I I was Mai 5 0 as O� © / O / 90�.• o° vk /** a o° IV o 44 /e oe off~ li r; OC O O(' O M • O • cc0 = 3 Ln to Ncm, 1 O E • ~ C1 M N (0 N • W Y 0 @ • W . N E a=oE Z 00 3 • O V aLiJJ.I:r • Z m�H • c N o `O r PROJECT NAME & LOCATION J Q H Q I z J z z0 w DU LLI LU � V J O F z O DATE 10/25/2022 PROJECT NUMBER 41353.012 PROJECT NAME SOUTH CARTER INDUSTRIAL DESIGNED BY / DRAWN BY M.COOLEY 1. Waters of the U.S. within the project study limits have been located using submeter, Bluetooth GPS antennas by Timmons Group. 2. Waters of the U.S. have not been confirmed by the U.S. Army Corps of Engineers. 3. Project limits are approximate. 4. Topography based on USGS LiDAR. 5. Cowardin Stream Classifications are based on NC DWQ Stream Identification form version 4.11. These plans and associated documents are the exclusive property of TIMMONS GROUP and may not be reproduced in whole or in part and shall not be used for any purpose whatsoever, inclusive, but not limited to construction, bidding, and/or construction staking without the express written consent of TIMMONS GROUP. DRAWING DESCRIPTION FIGURE 7: PRELIMINARY JURISDICTIONAL WATERS OF THE U.S. IMPACTS MAP ;j SCALE FEET J� � 0 40 80 PLANS PRINTED AS 11X17 ARE HALF SCALE SCALE SHEET NUMBER H:1"=403of3 Y:\804\41353.012 - South Carter Industrial Park\GIS\WTIM\41353.012-PERM-WTIM.mxd 1 / - / I / \ \ - \ N — \ \ \ � \1\`) 111\\ ^ \\ \\\\/_✓� \ �(� r / // / (� \ \ I I\ J ( l ► �, III I �/ ��\ e, 0. \ , �• — \ � _ , � � \1� 1 l I ( III) ) I 1 / I � 1 � I 1 11 � � / `' c/ \ ( � � \ / I , I �g6 rJ t 1 17 ., \ I 1 /_---- � \ I \<� 1\\I ► \ I � \\ Ill \ \ —\1 � \ �\ �� — \` 1 1 7 l e\ <C \ \14\ > 84' S84°3109 W679.- \ \ \\\ L \ • \ �\ t)— _ _ I �) \ \ I S29°12'07'E / 108.75' I / o i i i i i I I I I I I I I I I /- 1 / 9'20"E 828 Ilk fEKF1 , s PROPOSED CULVERTS ✓/ \ / / /i ( / / _—_(I_ �.---- --_-- \ 1' J , `, I (, 11 --_— — �■ ST ETA'---� - - - J J �— PROPOSED CULVERT �\\\\\\\1ll\\\� • �� \ \\ \\I,1 //1 ��\ ll I I �/J ) /<\ 1\� \ t \` , • — \ � \ \` \` \ _` \ _ y � \ � 1 — -- — _— -- — ��� — --- -- --- � \ / IOEM — � �.. � / � r f i i<) — L \\\ \ \ \\\ \ / / / l��'�t` I \ \ \ ti \ \ \ — -- -- ■ V \ — J �\ // // / / / 84°31'03"E 714.66'_ �✓ \ � N J \ \ \\��BANK CENTER OFCREEK \ \ ^ TOP OF BANK �/1 �1\ II r' \ k \ / _ I \ \ \ 1 ^ / i \ // /� -• \ - \ �` v TOP OF BAN ^owl 932.72 I—i\ / \ I 1 I I lJ\/J�,S\�Illlllllil�l °3122W I \ \ � .J l > \ l I 1 \�` J) PROPOSED CULVERT I> r / POTENTIAL RETAINING WALL TOP OF BANK � II I I CENTER OF CREEK ` TOP OF BANK - `� 3� �\\ NO TOTAL I M PACT AREAS: STREAM IMPACTS = 0.05 AC ® WETLAND IMPACTS = 0.20 AC TOTAL = 0.25 AC PRELIMINARY STREAM CROSSINGS EXHIBIT South Carter Industrial - June 15, 2023 SCALE 1 "=60' 0 60' 120' , TIMMONS GROUP ENGINEERING I DESIGN I TECHNOLOGY S:\332\41353.012-SouthCarterind\DWG\Sheet\Exhibit\2023-06-14 Preliminary Stream Crossings Exhibit\Preliminary Stream Crossings Exhibit.DWG I Plotted on 6/15/2023 4:59 PM I by Gus Newman