Peck, Kaitlin
From:Farkas, Jim J
Sent:Friday, March 17, 2023 11:59 AM
To:ben@benstoutconstruction.com
Cc:sbrown@4dsitesolutions.com; cumberlandplanning@co.cumberland.nc.us; Hines, Lee
R
Subject:RE: SW6220702 Collier Gate Estates Subdivision
Attachments:Cover Letter & Permit 3-17-23.pdf
Good Morning,
The Division of Energy, Mineral, and Land Resources (DEMLR), received a complete Stormwater Management Permit
Application for the subject project on December 22, 2022. We are forwarding Permit No. SW6220702, dated March 17,
2023, for the construction, operation and maintenance of the subject project and the stormwater system. This permit
shall be effective from the date of issuance and shall be subject to the conditions and limitations as specified therein,
and does not supersede any other agency permit that may be required.
The original signed permit package and approved plans are being mailed to the permittee, Ben Stout, at the following
address (NOTE: An electronic version of this permit can be found in our online repository:
https://edocs.deq.nc.gov/WaterResources/Browse.aspx?id=494276&dbid=0&repo=WaterResources):
Stout Land Development, LLC, Developer
Attn: Ben Stout, Managing Member
1786 Metromedical Drive
Fayetteville, NC 28304
I will hold onto our hard copies of these projects for 30 days (in case any issues/typos with the permit are noticed and
corrections need to be made) after which point, they will be kept on file at the Winston-Salem Regional Office. If you
have any questions, or need additional information concerning this matter, please contact Jim Farkas at
jim.farkas@ncdenr.gov.
Thank you,
Jim Farkas
State Stormwater Engineer
North Carolina Department of Environmental Quality
Office: (919) 707-3646
Jim.farkas@ncdenr.gov
1
From: Tran, Kieu M <kieu.tran@ncdenr.gov>
Sent: Wednesday, July 13, 2022 3:40 PM
To: ben@benstoutconstruction.com; sbrown@4dsitesolutions.com
Cc: Farkas, Jim J <Jim.Farkas@ncdenr.gov>; Lawyer, Mike <mike.lawyer@ncdenr.gov>
Subject: SW6220702 Collier Gate Estates Subdivision
Good afternoon,
We received your post-construction stormwater permit application for the above mentioned project on 7/5/2022.
Reviews under the standard permitting process generally take 45 calendar days, but can take up to 90 calendar days per
statute (our other reviewer, Corey Anen, no longer works for the State, so this review may exceed 45 days). Please
upload all documents that you mailed into our office through the link provided below. Be sure to choose the Central
Office as the Primary Contact office.
https://edocs.deq.nc.gov/Forms/SW-Supplemental-Upload
IMPORTANT NOTE: Please ensure that each file is uploaded under its appropriate file type. Additional file types can be
entered into the electronic form by clicking on the “Add Another Post-Construction File Upload” link directly below the
“State Stormwater Information Uploads” section of the form. Please do not upload entire plan sets through this form,
but rather upload the relevant individual sheets under the appropriate file type. Selecting the correct file type ensures
that the files are properly named in the electronic repository and it helps expedite the review process.
Please type in permit #: SW6220702
If you have any questions, please contact Jim Farkas Jim.Farkas@ncdenr.gov 919-707-3646.
Thank you,
Mrs. Kieu Tran
Stormwater Program Administrative Assistant
Office: (919) 707- 3640
Kieu.Tran@ncdenr.gov
North Carolina Department of Environmental Quality
Division of Energy, Mineral, and Land Resources Stormwater Program
512 N. Salisbury Street, Raleigh, NC 27604 (location)
1612 Mail Service Center, Raleigh, NC 27699-1612 (mailing)