Loading...
HomeMy WebLinkAboutNCG050419_Inspection Report_20221212ROY COOPER�� Governor s ELISABETH BISER (" Secretary BRIAN WRENN Director NORTH CAROLINA Environmental Quality December 12, 2022 Lydall Thermal Acoustical Inc. Attention: Jonathan Kavanaugh 1241 Buck Shoals Rd Hamptonville NC 27020 Subject: Compliance Evaluation Inspection Lydall Thermal Acoustical Inc. NPDES Certificate of Coverage — NCG050419 Yadkin County, North Carolina Dear Mr. Kavanaugh, Enclosed please find a copy of the Compliance Evaluation Inspection Report for the inspection we conducted at the Hamptonville Lydall Thermal Acoustical facility on November 30, 2022. Please note that in the stormwater inspection report summary we ask that you address minor erosion issues on site and update the Stormwater Pollution Prevention Plan. The report should be self-explanatory; however, should you have any questions, please do not hesitate to contact me at (336) 776-9655 or by E-mail at lily.kay@ncdenr.gov. Sincerely, A Tamera Eplin E Regional Engineer Land Quality Section Enclosure c: Laserfiche .�...� North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Winston-Salem Regional Office 1 450 Hanes Mill Road, Suite 3001 Winston-Salem, North Carolina 27105 336-776-9800 Compliance Inspection Report Permit: NCG050419 Effective: 06/01/18 Expiration: 05/31/23 Owner: Lydall Thermal Acoustical Inc SOC: Effective: Expiration: Facility: Lydall Thermal Acoustical Inc - Hamptonville Fa County: Yadkin 1241 Buck Shoals Rd Region: Winston-Salem Hamptonville NC 27020 Contact Person: Jose Concepcion Title: Phone: 336-468-8522 Directions to Facility: System Classifications: SWNC, Primary ORC: Certification: Phone: Secondary ORC(s): On -Site Representative(s): Related Permits: NCG030595 Lydall Thermal Acoustical Inc - Lydall Thermal Acoustical Inc - Hamptonville Facility Inspection Date: 11/30/2022 Entry Time 10:25AM Exit Time: 01:30PM Primary Inspector: Lily C Kay Phone: 704-663-1699 Secondary Inspector(s): Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Apparel/Printing/Paper/Leather/Rubber Stormwater Discharge COC Facility Status: 0 Compliant ❑ Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 Permit: NCG050419 Owner - Facility: Lydall Thermal Acoustical Inc Inspection Date: 11/30/2022 Inspection Type : Compliance Evaluation Reason for Visit: Routine Inspection Summary: The Stormwater Pollution Prevention Plan (SWPPP) and related documentation was complete including employee training records, inspection records, and the annual certification except in 2021. The facility has 5 outfalls, but one does not have industrial activity in the drainage area and it can be removed. Several yard inlet discharge points could not be determined by facility personnel. Locating the discharge points for the yard inlets is highly recommended. This facility is permitted under the NCG05 permit but handles metals for metal fabrication of car parts. This industrial activity should be covered under the NCG03 permit. Contact Brittany Carson in the Raleigh office to make this change, (919) 707-3648. If you have questions, contact me at Lily. Kay@ncdenr.gov or by phone at (336) 776-9655. Page 2 of 3 Permit: NCG050419 Owner - Facility: Lydall Thermal Acoustical Inc Inspection Date: 11/30/2022 Inspection Type : Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? N❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? M ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? 0 ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? 0 ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? E ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? 0 ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? 0 ❑ ❑ ❑ # Does the Plan include a BMP summary? 0 ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? 0 ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? 0 ❑ ❑ ❑ # Does the facility provide and document Employee Training? 0 ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? 0 ❑ ❑ ❑ # Is the Plan reviewed and updated annually? 0 ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? 0 ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? N ❑ ❑ ❑ Comment: The Stormwater Pollution Prevention Plan (SWPPP) and related documentation was complete including employee training records, inspection records and the annual certification except in 2021. The drainage map with locations of the outfalls and pollutant sources was not available at the time of isnpection. Qualitative Monitorinq Yes No NA NE Has the facility conducted its Qualitative Monitoring? ❑ ❑ ❑ Comment: Qualitative monitoring records were available and complete. Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? ❑ ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ 0 ❑ Comment: Analytical monitoring is not required for this facility under the current permit. Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? N ❑ ❑ ❑ # Were all outfalls observed during the inspection? 0 ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ 0 ❑ # Has the facility evaluated all illicit (non stormwater) discharges? ❑ ❑ 0 ❑ Comment: The facility has 5 outfalls, but one does not have industrial activity in the drainage area and it can be removed. Several outfalls discharge point could not be determined by facility personnel. Locating the discharge points for the yard inlets is highly recommended. Page 3 of 3