Loading...
HomeMy WebLinkAbout20210468 Ver 2_ePCN Application_20230620DWR Division of Water Resources Pre -Construction Notification (PCN) Form For Nationwide Permits and Regional General Permits (along with corresponding Water Quality Certifications) April 13, 2022 Ver 4.3 Initial Review Has this project met the requirements for acceptance in to the review process? Yes No Is this project a public transportation project?* Yes No Change only If needed. Pre -Filing Meeting Date Request was submitted on: 3/1/2021 BIMS # Assigned 20210468 Is a payment required for this project?* No payment required Fee received Fee needed - send electronic notification Reviewing Office* Mooresville Regional Office - (704) 663-1699 Information for Initial Review la. Name of project: Performance Road 1a. Who is the Primary Contact?* Matthew Erich 1b. Primary Contact Email: * jrobertson@atiasenvi.com Date Submitted 6/20/2023 Nearest Body of Water East Fork Coddle Creek Basin Yadkin-PeeDee Water Classification WS-II;HQW Site Coordinates Latitude: Longitude: 35.563390° -80.7312350 A. Processing Information Is this project connected with ARPA funding? Yes No County (or Counties) where the project is located: Rowan Is this a NCDMS Project Yes No Is this project a public transportation project?* Yes No Version#* 2 What amout is owed?* $240.00 $570.00 Select Project Reviewer* Andrew Pitner:andrew.pitner@ncdenr.gov 1c. Primary Contact Phone: * (317)435-9781 Q i� 1a.Type(s)of approval sought from the Corps: Section 404 Permit (wetlands, streams and waters, Clean Water Act) Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) Has this PCN previously been submitted?* Yes No 1b. What type(s) of permit(s) do you wish to seek authorization? Nationwide Permit (NWP) Regional General Permit (RGP) Standard (IP) 1c. Has the NWP or GP number been verified by the Corps? Yes No Nationwide Permit (NWP) Number: NWP Numbers (for multiple NWPS): 1d. Type(s) of approval sought from the DWR: 401 Water Quality Certification - Regular Non-404 Jurisdictional General Permit Individual 401 Water Quality Certification 39 - Commercial/Institutional Developments le. Is this notification solely for the record because written approval is not required? For the record only for DWR 401 Certification: For the record only for Corps Permit: 1f. Is this an after -the -fact permit application? * Yes No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? Yes No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? Yes No 1h. Is the project located in any of NC's twenty coastal counties? Yes No 1j. Is the project located in a designated trout watershed? Yes No B. Applicant Information 401 Water Quality Certification - Express Riparian Buffer Authorization 1d. Who is applying forthe permit? Owner Applicant (other than owner) le. Is there an Agent/Consultant for this project? Yes No 2. Owner Information 2a. Name(s) on recorded deed: Performance Park Holdings LLC 2b. Deed book and page no.: Book 1395 page 609 2c. Contact Person: Matthew Erich 2d.Address Street Address 19037 Chandlers Landing Dr Address Line 2 City State / Province / Region Cornelius NC Postal / Zip Code Country 28031 USA Yes No Yes No 2e. Telephone Number: (317)435-9781 2g. Email Address:' matt.erich@trustedcampaigns.com 4. Agent/Consultant (if applicable) 4a. Name: Jennifer Robertson 4b. Business Name: Atlas Environmental, Inc. 4c.Address Street Address 338 S. Sharon Amity Road #411 Address Line 2 city Charlotte Postal / Zip Code 28211 4d. Telephone Number: (704)512-1206 4f. Email Address:"` jrobertson@atlasenvi.com C. Project Information and Prior Project History 1. Project Information 1b. Subdivision name: (if appropriate) Not a subdivision 1c. Nearest municipality / town: Mooresville 2. Project Identification 2a. Property Identification Number: 4686-03-44-9310 2c. Project Address Street Address 1045 Packard Drive Address Line 2 city Mooresville Postal / Zip Code 28115 3. Surface Waters 3a. Name of the nearest body of water to proposed project: East Fork Coddle Creek 3b. Water Resources Classification of nearest receiving water:" WS-II;HQW 3c. What river basin(s) is your project located in?" Yadkin-PeeDee 3d. Please provide the 12-digit HUC in which the project is located. 030401050104 4. Project Description and History 2f. Fax Number: State / Province / Region NC Country USA 4e. Fax Number: 2b. Property size: 3.84 State / Province / Region NC Country USA 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:" The review area is cleared with two commercial buildings within the Northern and Eastern portion of the review area. The Southern portion of the review area has recently been graded for the construction of the third industrial warehouse. The surrounding land use consists of mostly commercial buildings and the Mooresville Dragway is abutting the review area to the West. a 4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past? Yes No Unknown If yes, please give the DWR Certification number or the Corps Action ID (exp. SAW-0000-00000). Corps Action ID: SAW-2021-00507 DWR #: 21-0468 4f. List the total estimated acreage of all existing wetlands on the property: 0.221 4g. List the total estimated linear feet of all existing streams on the property: 501 4h. Explain the purpose of the proposed project:* The project purpose is improve an existing road crossing by repairing a failing retaining wall 41. Describe the overall project in detail, including indirect impacts and the type of equipment to be used: * The currently existing road crossing is highly unstable due to a retaining wall which is beginning to lean away from the slope. The instability is resulting in tension cracks on the road surface and erosion behind the retaining wall. The project will include the addition of 30 linear feet of culvert (S1: 10 LF upstream of existing culvert, and S2: 20 LF downstream of existing culvert) to provide additional stability. Wetland impacts will be required below the existing culvert adjacent to impact W1. The proposed work will be completed using heavy equipment to excavate and expose the existing culvert for the extension. 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the property or proposed impact areas? Yes No O Unknown Comments: Atlas Staff Delineated the project on Jan. 29 2021, and June 06, 2023 5b. If the Corps made a jurisdictional determination, what type of determination was made? Preliminary Approved Not Verified Unknown N/A Corps AID Number: SAW-2021-00507 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Atlas Staff Agency/Consultant Company: Atlas Environmental, Inc. Other: 5d. List the dates of the Corp jurisdiction determination or State determination if a determination was made by the Corps or DWR PJD and NWP 18 was issued on April 30, 2021 6. Future Project Plans 6a. Is this a phased project?* Yes No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? No D. Proposed Impacts Inventory 1. Impacts Summary 1a. Where are the impacts associated with your project? (check all that apply): Wetlands Streams -tributaries Buffers Open Waters Pond Construction 2. Wetland Impacts r L. W1 2a1 Reason (?) Culvert 2b. Impact type*(?) P 2c. Type of W. Headwater Forest 2d. W. name WL 1000 2e. Forested" ��2f. Yes Type of Jurisdicition * Both 2g. Impact area * 0.003 (acres) ff7777]Fnintentional Fill P Headwater Forest WL 1000 Yes __J Both 0.028 (acres) 2g. Total Temporary Wetland Impact 2g. Total Permanent Wetland Impact 0.000 0.031 2g. Total Wetland Impact 0.031 2i. Comments: Impact W1 is for the installation of additional 48" culverts due a retaining wall failure. Impact W2 is an unintentional impact that occurred during construction and grading of a side slope. 3. Stream Impacts 3a. Reason for impact (?) 3b.lmpact type * 3c. Type of impact" 3d. S. name * 3e. Stream Type * 3f. Type of 3g. S. width 3h. Impact ❑ (?) Jurisdiction* length' S1 Culvert Permanent Culvert CH 100 Perennial Both 10 Average (feeq (linear feet) g2 Culvert Permanent Culvert CH 100 Perennial Both 20 Average (feet) (linear feet) S3 Culvert Installation changed Permanent Other CH 100 Perennial Both 6 23 flow path Average (feet) (linear feet) 3i. Total jurisdictional ditch impact in square feet: 0 31. Total permanent stream impacts: 53 3i. Total stream and ditch impacts: 53 3i. Total temporary stream impacts: 0 3j. Comments: Impacts S1 (10 LF, 0.001 ac) and S2 (20 LF 0.001 ac) are for the installation of additional 48" culverts at the previously permitted road crossing due to a retaining wall failure. Impact S3 (23 LF, 0.003 ac) is an unintentional impact that occurred during construction due to a culvert installation that changed the flow pattern of CH 100. E. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: The site layout and grading plan has been designed and engineered to minimize impacts to CH 100 and WL 1000 to the greatest extent possible. Approximately 89 % of CH 100 will not be avoided and 86 % of WL 1000 will be avoided. Only one road crossing was designed for the entire development consisting of three commercial buildings. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: The originally permitted road crossing consisted of a retaining wall to avoid and minimize impacts to the greatest extent possible. The constructed retaining wall is unstable along both the upstream and downstream extents of the existing road crossing. Addressing this failure as soon as possible will prevent direct impacts downstream and to offsite neighboring properties. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? Yes No 2b. If this project DOES NOT require Compensatory Mitigation, explain why: The impacts are less than the mitigation thresholds for streams and wetlands. F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? Yes No If no, explain why: The project does not occur within or adjacent to a protected NC riparian buffer. 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250? Yes No 2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)? Yes No L O 2c. Does this project have a stormwater management plan (SMP) reviewed and approved under a state stormwater program or state -approved local government stormwater program? Yes No N/A - project disturbs < 1 acre 2d. Which of the following stormwater management program(s) apply: Local Government State Local Government Stormwater Programs Phase II NSW USMP Water Supply Please identify which local government stormwater program you are using. Rowan County Comments: >24% Impervious surface G. Supplementary Information 1. Environmental Documentation la. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? Yes No 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)? * Yes No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project result in additional development, which could impact nearby downstream water quality? Yes No 3b. If you answered "no," provide a short narrative description. This is a single and complete project which no reasonably anticipated future impacts. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project? Yes No N/A 4b. Describe, in detail, the treatment methods and dispositions (non -discharge or discharge) of wastewater generated from the proposed project. If the wastewater will be treated at a treatment plant, list the capacity available at that plant. Project will include septic systems for waste treatment. 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat?* Yes No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts? Yes No 5d. Is another Federal agency involved?* Yes No Unknown 5e. Is this a DOT project located within Division's 1-8? Yes No 5f. Will you cut any trees in order to conduct the work in waters of the U.S.? Yes No 5g. Does this project involve bridge maintenance or removal? Yes No 5h. Does this project involve the construction/installation of a wind turbine(s)?* Yes No 5i. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.? Yes No 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? IPaC 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* Yes No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat? NOAA Essential Fish Habitat Mapper 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status? * Yes No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? NC HPO Buffer Map. 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? * Yes No 8c. What source(s) did you use to make the floodplain determination? NFHL - National Flood Hazard Layer Miscellaneous Please use the space below to attach all required documentation or any additional information you feel is helpful for application review. Documents should be combined into one file when possible, with a Cover Letter, Table of Contents, and a Cover Sheet for each Section preferred. Click the upload button or drag and drop files here to attach document Performance Road NWP 39 ePCN Attachments Compressed.pdf 7.73MB File must be PDF or KMZ Comments Signature By checking the box and signing below, I certify that: • The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief'; and • The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. • I have given true, accurate, and complete information on this form; • I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • I intend to electronically sign and submit the PCN form. Full Name: Jacob Sinclair Signature Date 6/20/2023