Loading...
HomeMy WebLinkAbout20230638 Ver 1_WRC Comments_202306059 North Carolina Wildlife Resources Commission 9 Cameron Ingram, Executive Director June 5, 2023 Ms. Amanda Fuemmeler U.S. Army Corps of Engineers, Regulatory Branch 151 Patton Avenue, Room 208 Asheville, North Carolina 28801-5006 SUBJECT: Fayko Bent River Project North Fork New River, Ashe County Dear Ms. Fuemmeler: Biologists with the North Carolina Wildlife Resources Commission (NCWRC) reviewed an application to stabilize 116 ft of the North Fork New River in Ashe County. Our comments on this application are offered for your consideration under provisions of the Clean Water Act of 1977 (33 U.S.C. 466 et. seq.) and Fish and Wildlife Coordination Act (48 Stat. 401, as amended; 16 U.S.C. 661-667d). Project activities should not impact wild trout and do not need to be avoided during the trout moratorium. However, the North Fork New River is recognized by the NC Natural Heritage Program as the North Fork New River Aquatic Habitat, rated Exceptional for the richness of rare species it contains. Rare and listed species found in the river in the vicinity of the project include Eastern Hellbender (Cryptobranchus alleganiensis, US Federal Species of Concern, NC Special Concern), Seep Mudalia (Leptoxis dilatata, NC SC), Kanawha Minnow (Phenacobius teretulus, NC SC), Kanawha Darter [Etheostoma kanawhae, NC Significantly Rare (SR)], and Tongue-tied Minnow (Exoglossum laurae, NC SR). The application proposes to stabilize an eroding reach of bank on the North Fork New River through sloping the bank, planting native woody and herbaceous vegetation, and installing one in -stream rock vane. Most work will be done from the bank, but some instream access may be necessary for proper installation of the rock vane. Mailing Address: Habitat Conservation • 1721 Mail Service Center • Raleigh, NC 27699-1721 Telephone: (919) 707-0220 • Fax: (919) 707-0028 Fayko Bent River Page 2 June 5, 2023 North Fork New R, Ashe Co We offer the following recommendations to minimize impacts to the aquatic community: 1. In -channel work should be accomplished as quickly as possible and vigilance used in sediment and erosion control during site preparation, construction, and clean up. Disturbed areas should be seeded, mulched and/or matted as soon as possible, preferably at the end of each work day. 2. Any erosion control matting used should be free of nylon or plastic mesh, as this type of mesh netting frequently entangles wildlife and is slow to degrade, resulting in a hazard that may last for years. 3. Work should be performed during low flows. For the rock vane installation, we recommend diverting flows around the work area especially at the bank tie in location to reduce the risk of fine sediment liberation and loss. 4. Depending on the construction timeframe, NCWRC staff may come out to survey the site before project construction for rare animals. We ask that the project manager coordinate with Andrea Leslie(andrea.leslie(c-r�,ncwildlife.org) and Lori Williams (lori.williams(cr�,ncwildlife.org to ensure access to the site. 5. Shelter rocks potentially used by hellbenders should be left undisturbed during construction activities. Shelter rocks are typically large flat rocks at least a foot in diameter. If animals are disturbed during construction, they should be captured in a bucket and moved away from the area of disturbance. Please notify Lori Williams (lori.williamskncwildlife.org) if hellbenders are found. 6. To increase habitat diversity, we recommend incorporating stable woody debris into the project design. 7. We recommend that a woody buffer as wide as possible (we recommend at least 30 feet) be planted on the stream as infrastructure allows in order to ensure project success. A wide forested buffer can ensure greater bank stability, filter overland pollutants, and provide habitat for birds and other wildlife. Thank you for the opportunity to review and comment on this project. Please contact me at (828) 400-4223 if you have any questions about these comments. Sincerely, Andrea Leslie Mountain Region Coordinator, Habitat Conservation Program ec: Glen Sullivan, Foggy Mountain Nursery Seren Homer, NC Division of Water Resources Lori Williams, NCWRC