HomeMy WebLinkAbout20230886 Ver 1_ePCN Application_20230616DWR
Division of Water Resources
Pre -Construction Notification (PCN) Form
For Nationwide Permits and Regional General Permits
(along with corresponding Water Quality Certifications)
April 13, 2022 Ver 4.3
Initial Review
Has this project met the requirements for acceptance in to the review process?
Yes
No
Is this project a public transportation project?*
Yes No
Change only If needed.
Pre -Filing Meeting Date Request was submitted on:
2/7/2023
BIMS # Assigned
20230886
Is a payment required for this project?*
No payment required
Fee received
Fee needed - send electronic notification
Reviewing Office*
Wilmington Regional Office - (910) 796-7215
Information for Initial Review
la. Name of project:
The Village at Compass Pointe - Section 2
1a. Who is the Primary Contact?*
Tom Gulley
1b. Primary Contact Email: *
tgulley@gmail.com
Date Submitted
6/16/2023
Nearest Body of Water
Alligator Branch
Basin
Cape Fear
Water Classification
C;Sw
Site Coordinates
Latitude:
34.275263
A. Processing Information
Is this project connected with ARPA funding?
Yes No
County (or Counties) where the project is located:
Brunswick
Is this a NCDMS Project
Yes No
Longitude:
-78.106887
Version#*
1
What amout is owed?*
$240.00
$570.00
Select Project Reviewer*
Holley Snider:Holley.Snider@ncdenr.gov
1c. Primary Contact Phone: *
(910)297-1282
Is this project a public transportation project?*
Yes No
1a.Type(s)of approval sought from the Corps:
Section 404 Permit (wetlands, streams and waters, Clean Water Act)
Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act)
Has this PCN previously been submitted?*
Yes
No
1b. What type(s) of permit(s) do you wish to seek authorization?
Nationwide Permit (NWP)
Regional General Permit (RGP)
Standard (IP)
1c. Has the NWP or GP number been verified by the Corps?
Yes No
Nationwide Permit (NWP) Number: 29 - Residential Developments
NWP Numbers (for multiple NWPS):
1d. Type(s) of approval sought from the DWR:
401 Water Quality Certification - Regular
Non-404 Jurisdictional General Permit
Individual 401 Water Quality Certification
le. Is this notification solely for the record because written approval is not required?
For the record only for DWR 401 Certification:
For the record only for Corps Permit:
401 Water Quality Certification - Express
Riparian Buffer Authorization
1f. Is this an after -the -fact permit application? *
Yes No
fig. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts?
Yes No
1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts?
Yes No
1h. Is the project located in any of NC's twenty coastal counties?
Yes No
1i. Is the project located within a INC DCM Area of Environmental Concern (AEC)?
Yes No Unknown
1j. Is the project located in a designated trout watershed?
Yes No
B. Applicant Information
1d. Who is applying for the permit?
Owner Applicant (other than owner)
le. Is there an Agent/Consultant for this project?'�
Yes No
2. Owner Information
2a. Name(s) on recorded deed:
Compass Pointe Partners JV LLC
2b. Deed book and page no.:
DB 4941 PGs 1019-1020
2c. Contact Person:
Jon Epstein
2d. Address
Street Address
4 W RED OAK LN STE 325
Address Line 2
City
State / Province / Region
WEST HARRISON
NY
Postal/Zip Code
Country
10604
USA
Yes No
Yes No
2e. Telephone Number:
(914)826-0280
2g. Email Address:"
JEpstein@sr-rep.com
3. Applicant Information (if different from owner)
3a. Name:
Tom Gulley
3b. Business Name:
Needham & Gulley Environmental, PLLC
3c.Address
Street Address
PO Box 960
Address Line 2
City
Wilmington
Postal / Zip Code
28402
3d. Telephone Number:
(910)297-1282
3f. Email Address:
tgulley@gmail.com
4. Agent/Consultant (if applicable)
4a. Name:
Tom Gulley
4b. Business Name:
Needham & Gulley Environmental, PLLC
4c.Address
Street Address
PO Box 960
Address Line 2
city
Wilmington
Postal / Zip Code
28402
4d. Telephone Number:
(910)297-1282
4f. Email Address:"
tgulley@gmail.com
C. Project Information and Prior Project History
1. Project Information
1b. Subdivision name:
(if appropriate)
The Village at Compass Pointe
1c. Nearest municipality / town:
Leland
2. Project Identification
2f. Fax Number:
State / Province / Region
NC
Country
USA
3e. Fax Number:
State / Province / Region
NC
Country
USA
4e. Fax Number:
2a. Property Identification Number: 2b. Property size:
216904928270 7.71
2c. Project Address
Street Address
COMPASS POINTE SOUTH WYND NE & ARDSLEY CIR NE
Address Line 2
City
Leland
Postal / Zip Code
28451
3. Surface Waters
3a. Name of the nearest body of water to proposed project:
Alligator Branch
3b. Water Resources Classification of nearest receiving water:
C;Sw
3c. What river basin(s) is your project located in?*
Cape Fear
3d. Please provide the 12-digit HUC in which the project is located.
030300050406
4. Project Description and History
State / Province / Region
NC
Country
USA
4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: *
Site is wooded with pines. Multifamily homes and proposed multifamily homes adjacent to Section 2. Senior living center adjacent to the south. Golf course/housing development across
Alligator Branch to the north. Powerline along southern property line.
4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?
Yes No Unknown
4f. List the total estimated acreage of all existing wetlands on the property:
1.97 acres
4g. List the total estimated linear feet of all existing streams on the property:
400
4h. Explain the purpose of the proposed project:
This is a multifamily housing project.
4i. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:
Multifamily homes with associated parking, driveways, etc. Typical construction equipment used for grading and road construction and construction of multifamily buildings.
5. Jurisdictional Determinations
5a. Have the wetlands or streams been delineated on the property or proposed impact areas?*
Yes No
Comments:
Expired JD, new JD was submitted to COE in January of 2022
5b. If the Corps made a jurisdictional determination, what type of determination was made?
Preliminary Approved Not Verified Unknown N/A
Corps AID Number:
Part of previous JD - 2007-03075
5c. If 5a is yes, who delineated the jurisdictional areas?
Name (if known): Tom Gulley
Agency/Consultant Company: Needham & Gulley Environmental, PLLC
Other:
O Unknown
5d. List the dates of the Corp jurisdiction determination or State determination if a determination was made by the Corps or DWR
Original JD approved on Jan 23, 2012.
Renewal of this portion of JD submitted to the COE on Jan 25, 2022. Still waiting on approval.
6. Future Project Plans
6a. Is this a phased project?*
Yes O No
6b. If yes, explain.
This project has three phases and all three phases have been planned and approved and the proposed wetland impacts in Section 2 which is the subject of this JD are the only impacts
proposed or needed.
Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity?
D. Proposed Impacts Inventory
1. Impacts Summary
1a. Where are the impacts associated with your project? (check all that apply):
Wetlands Streams -tributaries Buffers
Open Waters Pond Construction
2. Wetland Impacts
2a1 Reason (?)
2b. Impact type" (?)
2c. Type of W."
2d. W. name
2e. Forested"
2f. Type of Jurisdicition *
?)
2g• Impact
area
E7]
parking
P
f7verine Swamp Forest
t7cl: #1
Yes
Both
0.100
(acres)
2g. Total Temporary Wetland Impact 2g. Total Permanent Wetland Impact
0.000 0.100
2g. Total Wetland Impact
0.100
2i. Comments:
Impact to the upper edge of the floodplain of Alligator Branch and not near channel of branch.
E. Impact Justification and Mitigation
1. Avoidance and Minimization
1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project:
Project is proposed in the southern portion of the property in upland area. Project is multifamily which reduces the overall footprint.
1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques:
Retaining wall proposed at the edge of the wetland impact to minimize the overall footprint by preventing the need for sidelopes to stabilize fill.
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State?
Yes No
2b. If this project DOES NOT require Compensatory Mitigation, explain why:
Impact does not exceed 0.10 acres.
F. Stormwater Management and Diffuse Flow Plan (required by DWR)
1. Diffuse Flow Plan
1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules?
Yes No
If no, explain why:
This site is not in a protected NC Buffer watershed
2. Stormwater Management Plan
2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?
Yes No
2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)?
Yes No
2c. Does this project have a stormwater management plan (SMP) reviewed and approved under a state stormwater program or state -approved local government stormwater program?
Yes No
N/A - project disturbs < 1 acre
2d. Which of the following stormwater management program(s) apply:
Local Government State
State Stormwater Programs
Phase II Coastal Counties
HWQ or ORW Other
AO
u
Comments:
State SW permit SW8 080107
G. Supplementary Information
1. Environmental Documentation
la. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?'�
Yes No
2. Violations (DWR Requirement)
2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or
Riparian Buffer Rules (15A NCAC 2B .0200)? *
Yes No
3. Cumulative Impacts (DWR Requirement)
3a. Will this project result in additional development, which could impact nearby downstream water quality?
Yes No
3b. If you answered "no," provide a short narrative description.
This is Section 2 of a 3 section project and Section 3 has been planned with no wetland impacts.
4. Sewage Disposal (DWR Requirement)
4a. Is sewage disposal required by DWR for this project?
Yes No N/A
4b. Describe, in detail, the treatment methods and dispositions (non -discharge or discharge) of wastewater generated from the proposed project. If the wastewater will be treated at a
treatment plant, list the capacity available at that plant.
Municipal sewer provided by H2GO
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or habitat?*
Yes No
5b. Have you checked with the USFWS concerning Endangered Species Act impacts?
Yes No
5d. Is another Federal agency involved?*
Yes No
5e. Is this a DOT project located within Division's 1-8?
Yes No
Unknown
5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat?
Various sites linked from the Wilmington District - ESA website
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as an Essential Fish Habitat?*
Yes No
6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?'�
USF&W EFH map
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status? "
Yes No
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?"
HPOWEB 2.0 website
8. Flood Zone Designation (Corps Requirement)
Be. Will this project occur in a FEMA-designated 100-year floodplain?"
Yes No
8b. If yes, explain how project meets FEMA requirements:
Structures will be elevated out of flood elevation.
8c. What source(s) did you use to make the flood plain determination?*
Link to the FEMA Floodplain Maps: https://msc.fema.gov/portal/search
Miscellaneous
Please use the space below to attach all required documentation or any additional information you feel is helpful for application review. Documents should be combined into one file when
possible, with a Cover Letter, Table of Contents, and a Cover Sheet for each Section preferred.
Click the upload button or drag and drop files here to attach document
The Village at Compass Pointe Section 2 PCN Docs.pdf 9.67MB
File must be PDF or KMZ
Comments
This is a high -density project so I think a 401 Cert is required.
See attached cover letter and maps.
Signature
By checking the box and signing below, I certify that:
• The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief'; and
• The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time.
• I have given true, accurate, and complete information on this form;
• I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act");
• I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act");
• I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND
• I intend to electronically sign and submit the PCN form.
Full Name:
James T Gulley Jr
Signature
Date
6/16/2023
U