Loading...
HomeMy WebLinkAboutRequest for Additional Information 6-6-23Moore, Andrew W From: Moore, Andrew W Sent: Tuesday, June 6, 2023 2:31 PM To: jrobertson@atlasenvi.com Cc: Healy, Shannon CIV USARMY CESAW (USA); Leslie, Andrea J Subject: Request for Additional Information, Blair 4794, Jackson County (DWR Project #20230516) Jennifer, On May 16, 2023, the Division of Water Resources (Division) received your application requesting a 401 Water Quality Certification from the Division for the subject project. The Division has determined that your application is incomplete and cannot be processed. The application is on -hold until all of the following information is received: 1. If not already done so, the Division recommends the owners contact the North Carolina Dam Safety Program to determine any requirements from that program for the proposed work. Josh Colley (josh.collev@deg.nc.gov) is the State Dam Safety Engineer. [15A NCAC 02H .0506(b)(3)] 2. The proposed spillway profile and cross section figures provided with the PCN do not have units depicted along the axes or a clear scale. Please revise those figures to include the units of measure along the axes. [15A NCAC 02H .0502(a)(9)] 3. Please provide a construction sequence for the installation of the spillway and include details regarding whether the pond will be temporarily de -watered and how the work will be conducted such that there is no flowing water over the disturbed area. Please also include details that demonstrate adequate flow will be maintained in the receiving stream during construction to ensure maintenance of biological integrity. [15A NCAC 02H .0506(b)(1), (2), and (3)] 4. It appears, based on the proposed spillway profile, the intent of the project is to retain the pond full pool elevation at, or near, its existing elevation following construction. Please confirm or describe how the full pool elevation will change after installation of the spillway. [15A NCAC 02H .0506(b)(3)] Pursuant to Title 15A NCAC 02H .0502(e), the applicant shall furnish all of the above requested information for the proper consideration of the application. Please provide your response by July 6, 2023. If all of the requested information is not received, the Division will be unable to approve the application and it will be denied as incomplete. The denial of this project will necessitate reapplication to the Division for approval, including a complete application package and appropriate fee. Feel free to contact me if you have any questions. Andrew W Moore, P.G. Environmental Specialist ll, Division of Water Resources North Carolina Department of Environmental Quality Office: (828) 296-4684 Andrew.W.Moore@deg.nc.gov ,ef DE Q NORTH CAROLINA _ Department of Environmental Quality Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties.