Loading...
HomeMy WebLinkAbout20201096 Ver 1_Firestone_SiteWalk_RequestMemo_20230621ID#* 20201096 Version* 1 Select Reviewer: Katie Merritt Initial Review Completed Date 06/21/2023 Mitigation Project Submittal - 6/21/2023 Is this a Prospectus, Technical Proposal or a New Site?* Yes No Type of Mitigation Project:* Stream Wetlands Buffer Nutrient Offset (Select all that apply) Project Contact Information Contact Name: * Email Address: Andrea Eckardt aeckardt@wildlandseng.com Project Information ID#: * 20201096 Version:* 1 Existing ID# Existing Version Project Type: DMS Mitigation Bank Project Name: Firestone Mitigation Site County: Catawba Document Information Mitigation Document Type:* Mitigation As -Built Plans File Upload: Firestone _SiteWalk_RequestMemo.pdf 7.84MB Please upload only one PDF of the complete file that needs to be submitted... Signature Print Name:* Signature: * Andrea Eckardt �'ITiYIl't!'R �.(R tdC   June 21, 2023 CREDIT RELEASE REQUEST FORM To: NCDEQ-DWR Nutrient Offset & Buffer Banking Coordinator From: Jeffrey Turner (jturner@wildlandseng.com, 704.332.7754 x118) Through: Wildlands Holdings III, LLC We formally request a credit release for the Firestone Buffer Mitigation Bank Parcel (2020- 1096v1) for completion of Task 2 per the approved credit release schedule, which is included in the Attachments with this request. The following documents have been submitted to NCDWR for Task 2 and are pending review: Request for Site Walk Memorandum. Credits requested for release are detailed below: Credit Type % Release Credit Amount (include Units) Notes/Comments Buffer Restoration 20% 82,225.101 credits 0.20 x 411,125.506 = 82,225.101 credits Buffer Preservation 20% 1,040.920 credits 0.20 x 5,204.600 = 1,040.920 credits Buffer Enhancement 45% 12,270.15 credits 0.45 x 27,267.000 = 12,270.15 credits Credits from Tasks 1 and 7 had been held for Cattle Exclusion until fencing was complete Generated Nitrogen Nutrient Offset Delivered Nitrogen Nutrient Offset (Jordan sites only) Generated Phosphorus Nutrient Offset Delivered Phosphorus Nutrient Offset (Jordan sites only) Signature: Attachments: 1) BPDP approved Project Credit Table 2) UMBI approved Credit Release Schedule BPDP Approved Project Credit Table Firestone Buffer Mitigation Bank Parcel DWR No. 2020‐1096v1 Bank Parcel Development Package Project Area N Credit Conversion Ratio (ft2/pound) P Credit Conversion Ratio (ft2/pound) Credit Type Location Subject? (enter  NO if ephemeral  or ditch 1) Feature Type Mitigation  Activity Min‐Max  Buffer  Width (ft) Feature Name Total Area  (ft2) Total  (Creditable)  Area of Buffer  Mitigation (ft2) Initial  Credit  Ratio (x:1) % Full  Credit  Final  Credit  Ratio (x:1)   Convertible to  Riparian  Buffer?   Riparian Buffer  Credits   Convertible to  Nutrient  Offset?   Delivered  Nutrient Offset:  N (lbs)   Delivered  Nutrient  Offset: P  (lbs)  Buffer Rural No I / P Restoration 0‐50 Firestone Trib, UT1,  UT2, UT3 408,700 408,700 1 100% 1.00000 Yes 408,700.000 No —— Buffer Rural No I / P Restoration 20‐29 Firestone Trib, UT3 3,234 3,234 1 75% 1.33333 Yes 2,425.506 No —— Buffer Rural No I / P Enhancement via  Cattle Exclusion 0‐50 Firestone Trib 54,534 54,534 2 100% 2.00000 Yes 27,267.000 No —— Totals (ft2):466,468 466,468 438,392.506 0.000 0.000 Total Buffer (ft2):466,468 466,468 Total Nutrient Offset (ft2):0 N/A Total Ephemeral Area (ft2) for Credit:00 Total Eligible Ephemeral Area (ft2):123,123 0.0%Ephemeral Reaches as % TABM Enter Preservation Credits Below Total Eligible for Preservation (ft2):155,489 4.2%Preservation as % TABM Credit Type Location Subject? Feature Type Mitigation  Activity Min‐Max  Buffer  Width (ft) Feature Name  Total Area  (sf)  Total  (Creditable)  Area for Buffer  Mitigation (ft2) Initial  Credit  Ratio (x:1) % Full  Credit  Final  Credit  Ratio (x:1)   Riparian Buffer  Credits  Buffer Rural No I / P0‐50 UT1 26,023 26,023 5 100% 5.00000 5,204.600 Preservation Area Subtotals (ft2):26,023 26,023 Square Feet Credits 411,934 411,125.506 54,534 27,267.000 26,023 5,204.600 492,491 443,597.106 Square Feet Credits Nitrogen:0.000 Phosphorus:0.000 Mitigation Totals Restoration: Enhancement: TOTAL AREA OF BUFFER MITIGATION (TABM) Total Riparian Buffer: TOTAL NUTRIENT OFFSET MITIGATION Mitigation Totals Nutrient Offset:0 N/A Catawba Buffer N/A Preservation:                      Wildlands Catawba 01 Approved Credit Release Schedule for Riparian Buffer Credits     Task Project Milestone  % Credit Available  for Sale (Restoration  and Preservation)  % Credit Release   (Cattle  Exclusion)  1  Instrument and Buffer Mitigation Plan Approved by DWR,  Draft Stream Mitigation Plan Approved by the IRT,  Conservation Easement Recorded*, and Financial  Assurance Posted  20  No cattle  exclusion credits  released   2  All Riparian Earthwork & Mitigation Activities, Planting and  Installation of Monitoring Devices completed, easement  boundaries adequately marked, all applicable permits  obtained, stream mitigation activities completed & a site  visit performed by DWR   20 40  3 Monitoring Financial Assurance Posted and Approval of As‐ Built Report 10 10  4 Monitoring Report #1: Approved by the DWR** & financial  assurance renewed 10 10  5 Monitoring Report #2: Approved by the DWR** & financial  assurance renewed 10 10  6 Monitoring Report #3: Approved by the DWR** & financial  assurance renewed 10 10  7  Item B (I) of Section X in this Instrument has been  completed and approved by DWR 5 5  No remaining credits will be released until Task 7 has been satisfied, assigning the conversation easement to  an approved land trust or long‐term steward.   8  Monitoring Report #4: Approved by the DWR** & financial  assurance renewed 5 5  9  Monitoring Report #5: Approved by the DWR** and final  site visit by DWR has been conducted 10 10    Total 100% 100%    Wildlands Engineering, Inc.    Page 1  June 2023 MEMORANDUM TO:    Katie Merritt, Nutrient Offset & Buffer Banking Coordinator  FROM:    Andrea Eckardt, Project Manager        Jeffrey Turner, Environmental Scientist     DATE:    June 21, 2023  RE:    Request for Site Visit        FIRESTONE BUFFER MITIGATION BANK PARCEL ‐ Catawba County, NC       The Firestone Buffer Mitigation Bank Parcel (Parcel) is in Catawba County approximately five miles  northeast of Conover, North Carolina. The Parcel was restored to provide ecological and water quality  enhancements to the Catawba River Basin and create a functional riparian corridor. Prior to  construction, much of the land within 200 feet from top of bank of the project features had been  cleared and maintained for active cattle pastures. Table 1 contains project overview and credit  applicability information.   Table 1. Project Overview  Project Name Firestone Buffer Mitigation Bank Parcel  Hydrologic Unit Code 03050101140010  River Basin Catawba  Geographic Location (Lat, Long) 35.76608, ‐81.16744  Site Protection Instrument DB 03767 PN 1401, DB 03767 PN 1371, DB 03767 PN 1499  Total Credits 443,597.106 ft² buffer mitigation credits  Types of Credits Riparian Buffer  Buffer Mitigation Plan Date August 2022  Initial Planting Date April 1, 2023  Baseline Report Date July 2023  MY1 Report Date December 2023  MY2 Report Date December 2024  MY3 Report Date December 2025  MY4 Report Date December 2026  MY5 Report Date December 2027  Approximately 15.9 acres are protected under the conservation easement, with 9.5 acres proposed for  restoration, 1.3 acres for enhancement via cattle exclusion, and 0.6 acres for preservation.   The primary land use within 200 feet from top of bank of the project features had been cleared and  maintained for active cattle pastures prior to restoration activities; several small areas were forested    Wildlands Engineering, Inc.    Page 2  June 2023 including the left bank of UT1, the downstream extent of Firestone Trib, and the upstream extent of  UT3. Bare root trees were planted using a dibble bar at a spacing of 6 feet by 12 feet, which resulted in a  stem density of 521 stems per acre. A total of eight vegetation plots (6 permanent and 2 mobile) were  established to monitor the trees in the buffer mitigation credit areas. All 8 will be shared with the  404/401 stream bank. The following field adjustments were made to the locations of the vegetation  plots, based on our best professional judgement when in the field: (1) the upstream vegetation plot on  Firestone Trib was moved downstream one meander bend; (2) the upstream vegetation plot on UT1 was  moved to the opposite side of the stream because there was not enough space between the  preservation area and the edge of the buffer restoration zone; (3) the vegetation plot on UT2 was  changed to a 5x20‐meter plot. Following the completion of the associated stream restoration work, the  soils in the project area were disked and planted with a mixture of grasses, sedges, and forbs; any  undisturbed areas of fescue grass was sprayed with an herbicide. Table 2 includes a list of tree species  planted along with their density and composition at planting.  Table 2. Tree Species Selected for Planting  Species Common Name Number Planted % of Total  Buffer Bare Root Planting   Platanus occidentalis American Sycamore 1,169 15%  Betula nigra River Birch 780 10%  Diospyros virginiana Persimmon 780 10%  Quercus phellos Willow Oak 780 10%  Celtis occidentalis Hackberry 390 5%  Cornus florida Flowering Dogwood 390 5%  Acer negundo Boxelder 390 5%  Celtis laevigata Sugarberry 390 5%  Nyssa sylvatica Black Gum 390 5%  Ulmus rubra Slippery Elm 780 10%  Quercus rubra Northern Red Oak 390 5%  Morus rubra Red Mulberry 390 5%  Euonymus americanus Strawberry Bush 390 5%  Lindera benzoin Spicebush 390 5%  Powerline Buffer Bare Root Planting   Celtis occidentalis Hackberry 62 1%  Sambucus canadensis Elderberry 62 1%  Euonymus americanus Strawberry Bush 62 1%  Lindera benzoin Spicebush 62 1%    8,047 100%  Easement boundaries have been identified in the field to ensure clear distinction between the Parcel  and adjacent properties. Boundaries are identified by 6 foot “t posts” with attached easement placards.  Signage along the outer perimeter of the Parcel has been placed at 100‐foot intervals.     Attachments:  Credit Service Area Map  Monitoring Map  Vegetation Plot Photographs    ^_ £¤421 £¤421 £¤601 §¨¦77 Firestone Mitigation Site 03050101140010 0 10 20 Miles ¹ County Boundaries Service Area - HUC 03050101 14 Digit HUC - 03050101140010 Municipalities ^_Project Location Credit Service Area Map Firestone Mitigation Bank Parcel Site Walk Request Memo Catawba River Basin (03050101) Catawba County, NC !P !P !P !P [ [ [ [ [ [ [ [ [ [ [ [ [ [ [ [ [ [ [[[[[[[[ [ [ [ [ [ [ [ [ [ [ [ [[[ [ [ [[ [ [ [ [ [ [ [ [ [ [ [ [[[[[[[ [ [ [ [[[[ [ [ [ [ [ [ [ [ [ [ [ [[ [ [ [ [ [ [ [ [ [ [ [ [ [ [ [ [ [ [ [ [ [ [ [ [ [ [ [[ [ [ [ [ [ [ [ [ [ [ [ [ [ [ [ [ [ [ [ [ [ [ [ [ [ [ [ [ [ [ [ [[ [ [ [ [ [ UT1 UT1A F i r e s t o n e T r i b R 2 Fi r e s t o n e Tr i b R 1 UT2 UT3 R 1 A UT3 R 1 C UT3 R 1 B UT3 R 2 V P 4 MP1 MP2 VP2 VP6 VP3 VP1 VP5 946 950 942 938 93 4 9 3 0 9 2 6 9 2 2 9 1 8 95 4 914 91 0 958 962 90 6 90 2 96 6 97 0 89 8 89 4 974 978 982 986 990 89 0 994 88 6 998 99 4 946 97 0 91 8 91 4 918 99 0 91 0 95 8 9 4 2 926 9 3 8 9 0 6 97 4 9 2 2 9 3 0 96 2 95 4 9 1 4 950 934 966 98 6 2022 Aerial Photography Project Parcels Conservation Easement Crossings Existing Wetlands Riparian Restoration for Buffer Credits Riparian Enhancement via Cattle Exclusion for Buffer Credits Riparian Preservation for Buffer Credits No Credit Sanitary Sewer Easement Overhead Utility Easement Permanent Vegetation Plot (VP) Mobile Vegetation Plot (MP) Stream Restoration Stream Enhancement Stormwater BMP No Credit Non-Project Streams Topographic Contours (2') [[Fenceline !P Reach Break ¬« ¬« 0 225 450 Feet ¹ Monitoring Map Firestone Mitigation Bank Parcel Site Walk Request Memo Catawba River Basin (03050101) Catawba County, NC                           VEGETATION PLOT PHOTOGRAPHS  Monitoring Year 0 ‐ 2023                                         Permanent Vegetation Plot 1 (4/11/2023) Permanent Vegetation Plot 2 (4/11/2023)     Permanent Vegetation Plot 3 (4/11/2023) Permanent Vegetation Plot 4 (4/11/2023)     Permanent Vegetation Plot 5 (4/11/2023) Permanent Vegetation Plot 6 (4/11/2023)     Mobile Vegetation Plot 1 (4/11/2023) Mobile Vegetation Plot 2 (4/11/2023)