Mitigation Project Submittal - 6/21/2023
Is this a Prospectus, Technical Proposal or a New Site?* Yes No
Type of Mitigation Project:*
Stream Wetlands Buffer Nutrient Offset
(Select all that apply)
Project Contact Information
Contact Name: * Email Address:
Andrea Eckardt aeckardt@wildlandseng.com
Project Information
ID#: * 20201096 Version:* 1
Existing ID# Existing Version
Project Type: DMS Mitigation Bank
Project Name: Firestone Mitigation Site
County: Catawba
Document Information
Mitigation Document Type:*
Mitigation As -Built Plans
File Upload: Firestone _SiteWalk_RequestMemo.pdf 7.84MB
Please upload only one PDF of the complete file that needs to be submitted...
Signature
Print Name:*
Signature: *
Andrea Eckardt
�'ITiYIl't!'R �.(R tdC
June 21, 2023
CREDIT RELEASE REQUEST FORM
To: NCDEQ-DWR Nutrient Offset & Buffer Banking Coordinator
From: Jeffrey Turner (jturner@wildlandseng.com, 704.332.7754 x118)
Through: Wildlands Holdings III, LLC
We formally request a credit release for the Firestone Buffer Mitigation Bank Parcel (2020-
1096v1) for completion of Task 2 per the approved credit release schedule, which is included in the
Attachments with this request. The following documents have been submitted to NCDWR for Task 2
and are pending review: Request for Site Walk Memorandum.
Credits requested for release are detailed below:
Credit Type % Release Credit Amount
(include Units)
Notes/Comments
Buffer Restoration 20% 82,225.101
credits
0.20 x 411,125.506 =
82,225.101 credits
Buffer Preservation 20% 1,040.920 credits 0.20 x 5,204.600 =
1,040.920 credits
Buffer Enhancement 45% 12,270.15 credits 0.45 x 27,267.000 =
12,270.15 credits
Credits from Tasks 1 and 7
had been held for Cattle
Exclusion until fencing was
complete
Generated Nitrogen Nutrient
Offset
Delivered Nitrogen Nutrient
Offset (Jordan sites only)
Generated Phosphorus Nutrient
Offset
Delivered Phosphorus Nutrient
Offset (Jordan sites only)
Signature:
Attachments:
1) BPDP approved Project Credit Table
2) UMBI approved Credit Release Schedule
BPDP Approved Project Credit Table
Firestone Buffer Mitigation Bank Parcel
DWR No. 2020‐1096v1
Bank Parcel Development Package
Project Area
N Credit Conversion Ratio (ft2/pound)
P Credit Conversion Ratio (ft2/pound)
Credit Type Location
Subject? (enter
NO if ephemeral
or ditch 1)
Feature Type Mitigation
Activity
Min‐Max
Buffer
Width (ft)
Feature Name Total Area
(ft2)
Total
(Creditable)
Area of Buffer
Mitigation (ft2)
Initial
Credit
Ratio (x:1)
% Full
Credit
Final
Credit
Ratio (x:1)
Convertible to
Riparian
Buffer?
Riparian Buffer
Credits
Convertible to
Nutrient
Offset?
Delivered
Nutrient Offset:
N (lbs)
Delivered
Nutrient
Offset: P
(lbs)
Buffer Rural No I / P Restoration 0‐50 Firestone Trib, UT1,
UT2, UT3 408,700 408,700 1 100% 1.00000 Yes 408,700.000 No ——
Buffer Rural No I / P Restoration 20‐29 Firestone Trib, UT3 3,234 3,234 1 75% 1.33333 Yes 2,425.506 No ——
Buffer Rural No I / P Enhancement via
Cattle Exclusion 0‐50 Firestone Trib 54,534 54,534 2 100% 2.00000 Yes 27,267.000 No ——
Totals (ft2):466,468 466,468 438,392.506 0.000 0.000
Total Buffer (ft2):466,468 466,468
Total Nutrient Offset (ft2):0 N/A
Total Ephemeral Area (ft2) for Credit:00
Total Eligible Ephemeral Area (ft2):123,123 0.0%Ephemeral Reaches as % TABM
Enter Preservation Credits Below Total Eligible for Preservation (ft2):155,489 4.2%Preservation as % TABM
Credit Type Location Subject? Feature Type Mitigation
Activity
Min‐Max
Buffer
Width (ft)
Feature Name Total Area
(sf)
Total
(Creditable)
Area for Buffer
Mitigation (ft2)
Initial
Credit
Ratio (x:1)
% Full
Credit
Final
Credit
Ratio (x:1)
Riparian Buffer
Credits
Buffer Rural No I / P0‐50 UT1 26,023 26,023 5 100% 5.00000 5,204.600
Preservation Area Subtotals (ft2):26,023 26,023
Square Feet Credits
411,934 411,125.506
54,534 27,267.000
26,023 5,204.600
492,491 443,597.106
Square Feet Credits
Nitrogen:0.000
Phosphorus:0.000
Mitigation Totals
Restoration:
Enhancement:
TOTAL AREA OF BUFFER MITIGATION (TABM)
Total Riparian Buffer:
TOTAL NUTRIENT OFFSET MITIGATION
Mitigation Totals
Nutrient Offset:0
N/A
Catawba Buffer
N/A
Preservation:
Wildlands Catawba 01 Approved Credit Release Schedule for Riparian Buffer Credits
Task Project Milestone
% Credit Available
for Sale (Restoration
and Preservation)
% Credit Release
(Cattle
Exclusion)
1
Instrument and Buffer Mitigation Plan Approved by DWR,
Draft Stream Mitigation Plan Approved by the IRT,
Conservation Easement Recorded*, and Financial
Assurance Posted
20
No cattle
exclusion credits
released
2
All Riparian Earthwork & Mitigation Activities, Planting and
Installation of Monitoring Devices completed, easement
boundaries adequately marked, all applicable permits
obtained, stream mitigation activities completed & a site
visit performed by DWR
20 40
3 Monitoring Financial Assurance Posted and Approval of As‐
Built Report 10 10
4 Monitoring Report #1: Approved by the DWR** & financial
assurance renewed 10 10
5 Monitoring Report #2: Approved by the DWR** & financial
assurance renewed 10 10
6 Monitoring Report #3: Approved by the DWR** & financial
assurance renewed 10 10
7
Item B (I) of Section X in this Instrument has been
completed and approved by DWR 5 5
No remaining credits will be released until Task 7 has been satisfied, assigning the conversation easement to
an approved land trust or long‐term steward.
8
Monitoring Report #4: Approved by the DWR** & financial
assurance renewed 5 5
9
Monitoring Report #5: Approved by the DWR** and final
site visit by DWR has been conducted 10 10
Total 100% 100%
Wildlands Engineering, Inc. Page 1
June 2023
MEMORANDUM
TO: Katie Merritt, Nutrient Offset & Buffer Banking Coordinator
FROM: Andrea Eckardt, Project Manager
Jeffrey Turner, Environmental Scientist
DATE: June 21, 2023
RE: Request for Site Visit
FIRESTONE BUFFER MITIGATION BANK PARCEL ‐ Catawba County, NC
The Firestone Buffer Mitigation Bank Parcel (Parcel) is in Catawba County approximately five miles
northeast of Conover, North Carolina. The Parcel was restored to provide ecological and water quality
enhancements to the Catawba River Basin and create a functional riparian corridor. Prior to
construction, much of the land within 200 feet from top of bank of the project features had been
cleared and maintained for active cattle pastures. Table 1 contains project overview and credit
applicability information.
Table 1. Project Overview
Project Name Firestone Buffer Mitigation Bank Parcel
Hydrologic Unit Code 03050101140010
River Basin Catawba
Geographic Location (Lat, Long) 35.76608, ‐81.16744
Site Protection Instrument DB 03767 PN 1401, DB 03767 PN 1371, DB 03767 PN 1499
Total Credits 443,597.106 ft² buffer mitigation credits
Types of Credits Riparian Buffer
Buffer Mitigation Plan Date August 2022
Initial Planting Date April 1, 2023
Baseline Report Date July 2023
MY1 Report Date December 2023
MY2 Report Date December 2024
MY3 Report Date December 2025
MY4 Report Date December 2026
MY5 Report Date December 2027
Approximately 15.9 acres are protected under the conservation easement, with 9.5 acres proposed for
restoration, 1.3 acres for enhancement via cattle exclusion, and 0.6 acres for preservation.
The primary land use within 200 feet from top of bank of the project features had been cleared and
maintained for active cattle pastures prior to restoration activities; several small areas were forested
Wildlands Engineering, Inc. Page 2
June 2023
including the left bank of UT1, the downstream extent of Firestone Trib, and the upstream extent of
UT3. Bare root trees were planted using a dibble bar at a spacing of 6 feet by 12 feet, which resulted in a
stem density of 521 stems per acre. A total of eight vegetation plots (6 permanent and 2 mobile) were
established to monitor the trees in the buffer mitigation credit areas. All 8 will be shared with the
404/401 stream bank. The following field adjustments were made to the locations of the vegetation
plots, based on our best professional judgement when in the field: (1) the upstream vegetation plot on
Firestone Trib was moved downstream one meander bend; (2) the upstream vegetation plot on UT1 was
moved to the opposite side of the stream because there was not enough space between the
preservation area and the edge of the buffer restoration zone; (3) the vegetation plot on UT2 was
changed to a 5x20‐meter plot. Following the completion of the associated stream restoration work, the
soils in the project area were disked and planted with a mixture of grasses, sedges, and forbs; any
undisturbed areas of fescue grass was sprayed with an herbicide. Table 2 includes a list of tree species
planted along with their density and composition at planting.
Table 2. Tree Species Selected for Planting
Species Common Name Number Planted % of Total
Buffer Bare Root Planting
Platanus occidentalis American Sycamore 1,169 15%
Betula nigra River Birch 780 10%
Diospyros virginiana Persimmon 780 10%
Quercus phellos Willow Oak 780 10%
Celtis occidentalis Hackberry 390 5%
Cornus florida Flowering Dogwood 390 5%
Acer negundo Boxelder 390 5%
Celtis laevigata Sugarberry 390 5%
Nyssa sylvatica Black Gum 390 5%
Ulmus rubra Slippery Elm 780 10%
Quercus rubra Northern Red Oak 390 5%
Morus rubra Red Mulberry 390 5%
Euonymus americanus Strawberry Bush 390 5%
Lindera benzoin Spicebush 390 5%
Powerline Buffer Bare Root Planting
Celtis occidentalis Hackberry 62 1%
Sambucus canadensis Elderberry 62 1%
Euonymus americanus Strawberry Bush 62 1%
Lindera benzoin Spicebush 62 1%
8,047 100%
Easement boundaries have been identified in the field to ensure clear distinction between the Parcel
and adjacent properties. Boundaries are identified by 6 foot “t posts” with attached easement placards.
Signage along the outer perimeter of the Parcel has been placed at 100‐foot intervals.
Attachments:
Credit Service Area Map
Monitoring Map
Vegetation Plot Photographs
^_
£¤421
£¤421
£¤601
§¨¦77
Firestone
Mitigation Site
03050101140010
0 10 20 Miles ¹
County Boundaries
Service Area - HUC 03050101
14 Digit HUC - 03050101140010
Municipalities
^_Project Location
Credit Service Area Map
Firestone Mitigation Bank Parcel
Site Walk Request Memo
Catawba River Basin (03050101)
Catawba County, NC
!P
!P
!P
!P
[
[
[
[
[
[
[
[
[
[
[
[
[
[
[
[
[
[
[[[[[[[[
[
[
[
[
[
[
[
[
[
[
[
[[[
[
[
[[
[
[
[
[
[
[
[
[
[
[
[
[[[[[[[
[
[
[
[[[[
[
[
[
[
[
[
[
[
[
[
[
[[
[
[
[
[
[
[
[
[
[
[
[
[
[
[
[
[
[
[
[
[
[
[
[
[
[
[
[[
[
[
[
[
[
[
[
[
[
[
[
[
[
[
[
[
[
[
[
[
[
[
[
[
[
[
[
[
[
[
[
[[
[
[
[
[
[
UT1
UT1A
F
i
r
e
s
t
o
n
e
T
r
i
b
R
2
Fi
r
e
s
t
o
n
e
Tr
i
b
R
1
UT2
UT3
R
1
A
UT3
R
1
C
UT3
R
1
B
UT3
R
2
V
P
4
MP1
MP2
VP2
VP6
VP3
VP1
VP5
946
950
942
938
93
4
9
3
0
9
2
6
9
2
2
9
1
8
95
4
914
91
0
958
962
90
6
90
2
96
6
97
0
89
8
89
4
974
978
982
986
990
89
0
994
88
6
998
99
4
946
97
0
91
8
91
4
918
99
0
91
0
95
8
9
4
2
926
9
3
8
9
0
6
97
4
9
2
2
9
3
0
96
2
95
4
9
1
4
950
934
966
98
6
2022 Aerial Photography
Project Parcels
Conservation Easement
Crossings
Existing Wetlands
Riparian Restoration for Buffer Credits
Riparian Enhancement via Cattle Exclusion for Buffer Credits
Riparian Preservation for Buffer Credits
No Credit
Sanitary Sewer Easement
Overhead Utility Easement
Permanent Vegetation Plot (VP)
Mobile Vegetation Plot (MP)
Stream Restoration
Stream Enhancement
Stormwater BMP
No Credit
Non-Project Streams
Topographic Contours (2')
[[Fenceline
!P Reach Break
¬«
¬«
0 225 450 Feet ¹
Monitoring Map
Firestone Mitigation Bank Parcel
Site Walk Request Memo
Catawba River Basin (03050101)
Catawba County, NC
VEGETATION PLOT PHOTOGRAPHS
Monitoring Year 0 ‐ 2023
Permanent Vegetation Plot 1 (4/11/2023) Permanent Vegetation Plot 2 (4/11/2023)
Permanent Vegetation Plot 3 (4/11/2023) Permanent Vegetation Plot 4 (4/11/2023)
Permanent Vegetation Plot 5 (4/11/2023) Permanent Vegetation Plot 6 (4/11/2023)