Loading...
HomeMy WebLinkAboutFig 5.0 Impact Bulletin 6.15.23_ oHu SURVEYED WETLAND ss ° "PRELIMINARY, THIS DOCUMENT SHALL NOT BE RECORDED FOR ANY PURPOSE ANDBOUNDARY SHALL NOT BE USED OR VIEWED OR RELIED — xoff �8 z 33 UPON AS A FINAL DOCUMENT". �x�x—x u oNu4 — ----- —�u � _ _------------- o u N 82°013' 05� \ NOp11I _ - ° _ • _ _ _ _ 6'9 x Hu oHu x� OHu ND �— Ss s Ss 55 Ss I 60 / OHUx�xOHU ----- oHu _ / PROPERTY LINE NU � oHu Nu� = - —� EXISTING WETLANDS . PROPOSED WETLAND IMPACT (W4) PERMANENT: AC=.002 Y1 PROPOSED WETLAND IMPACT (W1) - - - - - - - • / PERMANENT. AC=.001 _ \ co / EXISTING 9 ° Jl � STREAM � a BUILDING #1�7 s GFA:35,nzSF 5 _ PROPOSED STREAM IMPACT (S1) + FE:2174� �" PER.=.044 AC/201 LF \\ HO Y2 i �) IIDIN - - - - y y y - _ _ _ _ _ SOIL BORING:HAB C-3 77'o F4 8 FA: 61,165 SF PROPOSED - \ FFE- 217� _ _ - - - - - STREAM .• J �, G3 J J HZ40 I -EO PROPOSED WETLAND - - IMPACT (DUE TO s J J j J J 3' Y3 I STREAM REROUTING) co --kfI�1 10 I Y LL PERMANENT=.083 N , medical Action FZ —�ss - - PROPOSED WETLAND IMPACT (W2) 7�F� >> DO \�f/ s$ y PERMANENT: AC=.022 Industries, Inc. i Jam/ �/ / �— BUI IN PIN: 9654-04-992• \ I I ��/ D1 \ �.. ....a / _..—�,D _ r , DB 1973 PG 267 / I FO - \ % GF FE: 21* FF / PROPOSED PLAYGROUND (TYP.) 1 J F1 D2 — — " TOTAL WETLAND IMPACT SUMMARY �� �j OI- 112, IRON PIPE, 0.7A.G. / PERMANENT WETLAND IMPACT: .108 AC NOT HELD- 1.5'50UTHOF �, 7 d N RMAL TO BOUNDARY LINE @ 5TATION 7+01.65' / / / i _ /j-- y RECONSTRUCTED WETLANDS: .016 �� 7 �� ; � 1 \ A3 Q-7 a STORMTECH (TYP.) �\ \ Z2 / Qv—/ / � BO \� / y y y y lTi l PE, 1.4 A.G. �\ NOTT MELD - 2. 23' SOUTH OF d NORMAL TO BOUNDARY LINE @ ter- 5TATION 5+39.41' / 1 N1, Civil Design Concepts, PA NrBELS c-2184 WETLAND RESTORATION TEMPORARY DISTURBED WETLAND AREAS WILL HAVE WETLAND SOILS RETURNED TO PRE —CONSTRUCTION CONTOURS. TEMPORARILY DISTURBED WETLANDS WILL BE RE —VEGETATED WITH A NATIVE WETLANDS SEED MIX (ERNMX— 308 NC PIEDMONT FACW MIX) AND STABILIZED WITH COIR MATTING SURVEYED STREAM CHANNEL RETAINING WALL f SURVEYED WETLAND STREAM IMPACT PERMANENT BOUNDARY (MCABEE AND PROPOSED STREAM ASSOCIATES) WETLAND IMPACT PERMANENT WETLANDS �61, 01-1/2"IRONPIPE, 1.5'A.G.1 % NOT HELD - I .3' SOUTH nr- A� �S d NORMAL TO BATIO\ STATION ��OrioN � LAKESHORE VILLAS s,ONUMENT, 0.3' (STATION O WETLAND STREAM IMPACT JUNE 2023 FIGURE 5.0