Loading...
HomeMy WebLinkAboutNCC231921_Site Plan or Location Map_20230621 ® �� � � / � \�� \ KN \� _ J / _ _ � / / _c �> /3 yu \ N N N \ N / / ( \ / / m m \ \ 35 ,''!Q \�// X „, 5 �r° \ 17 rg 1 18 \ ,, \ \ A� V A��� \ 38 / � \ \� i I \ 5 DwAiRD D 9a L214 o \ \l6 \ g ti 19 �\ \ 39 Z , \\ — \ s 1 �� \ \ 34 �e \\ \ N�e„�aD 20 \ \\ \� JCI I VICINITY AP N \ ao / N.T.S I \ \ �/ \ ..„-- ----- --,o, -- . 15 \--/''') ) N N \ -------- ^ // J r-I , \ -� / i\ / ) fs pEP\33 E T- � / i AD \ 'S 21 41 CP O� I - 58 14 \ un� } ( / has,�y �� 4' Fyn / \ '^\ \ 395 �� \ / /// \ 32 \ \( J 7 \ \ \ _� / r \ \ �� N 42 _ / 13 \ /> / 5 / 2 / \ 22 "�� \ \ \ \ / / / 96 \ �92� / I 9 31 \ \\ / ---- -- \ N�/ __ -'� \ MAIL IOSK �,&.. 56 /12 m y` q _ —� `SF3�'y CONSTRUCTION /--' -_ � �9� �'kj. LIMITS / / \ 43 \ �� \l ' o \ REMAINING • • • 23 43 LOT AREA )5 /• / - \ \ m\ \ Lot Plan N —/ 38i \ 30 / \ \ N N y \ j / ) \ \ CONSTRUCTION/ / OPEN SPACE / ��N__ / 24 1 a ( I ( \ I MIT / — _� / ll 29 \ /� 44 / // /\ `— // / \ yy/ a / / �� \ / / �2 \ o / _ \t. \ _ / a� / / war\ / / ! 28 / P 45 (\ \ N �8.6'PE�E M�ASNEEN�TNi 27 a6 :2'. DRAINA / � / \\\ /N Calloway 395 j \ � Y oad SR-1214 \ 7----- /7( —\ __ DRAIN PERMANENT C \ / / _ _ Calloway Road SR-1214 OB§�SEMEN� \ / �� \ Calloway Road SR- ,14 �/ / \ � � �� � \\ — 39✓ // / / — —� 1 TOTAL DISTURBED GE ACREAGE:of 341 ACRES �� _ / ,' / /— �� ==� —� _ \ / LOT EROSION CONTROL PLAN MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEASURES FOR LOT CONSTRUCTION LOT 43 TIMBERLAND RANCH General-All measures will be inspected and corrections made after runoff producing rainfalls,or at least once per week minimum.The builder will insure that the construction activities on any particular lot do not adversely affect any of the installed erosion control measures.If lot construction dictates,measures will be PHASE relocated on the lot to insure that the potential for sedimentation runoff is eliminated as much as possible.Silt fences and gravel construction entrances will be maintained as suggested in the erosion control manual.Sodding,seeding and mulching will be maintained to insure proper ground stabilizing cover. FOR Gravel Construction Entrance-The gravel pad should remain in a condition to prevent mud or sediment from leaving the construction site.This may require periodic topdressing with 2-inch stone.After each rainfall,inspect any structure used to trap sediment and clean it out as necessary. Immediately remove all O N S II E HOMES, L L C objectionable materials spilled,washed,or tracked onto public roadways. Silt Fence-Sediment fences should be inspected at least once a week and after each rainfall event.Any repairs should be made immediately. Damaged or decomposed fabric should be replaced promptly.Any sediment deposits that build up against the fence should be removed and disposed of propedy to insure that the removed sediment does not wash back against the fence.Adequate storage volume should be provided for behind the fence at tall times.Take care to not undermine the fence during cleanest operations. QU EWHIFFLE TOWNSHIP HOKE COUNTY Sodding-The sod should be properly maintained to insure that the grass take holds in the areas being secured.The sod should be watered as necessary to maintain adequate moisture in the root zone and prevent dormancy of the sod.The sod should not be mowed to close,since this could inhibit adequate growth SCALE: 1"=100' MAY 2022 and stabilization of the root bed.The sod should be limed and fertilized as per soil type recommendations and type of grass recommendations when and if possible. GRAPHIC SC ALE Grassing and Mulching-The area to receive grassing and mulching should be properly fertilized and limed as necessary as an initial step in soil preparation. Once the grassing has been placed,the area should be maintained as needed to insure that all areas are germinating property.My bare areas should be repaired,and reseeded as soon as possible.If the time of year does not permit the establishment of a permanent grass,then a temporary grassing should be used until the growing season permits the use of a permanent grass. - IIsu Wattles-Wattles shall be inspected after significant rainfall events.Rills or gullies upslope of the wattle and any undercutting is to be repaired.Sediment deposits that impair the filtration capability of the wattle shall be removed when the sediment reaches one-third of the wattles functional freeboard height.Removed sediment shall be deposited within the project in such a way that the sediment is not subject to erosion by wind or water. ( IN FEET ) 1 inch = 100 rt. Reinforced Silt Fence Outlet-Remove sediment deposits as necessary to provide adequate storage volume for the next rain to reduce pressure on the fence/outlet.Take care to avoid undermining the fence during cleanest.Remove and replace stone as necessary as it becomes clogged with sediment.Remove all MOORMAN,KIZER&REITZEL,INC.115 BROADFOOT AVE.FAYETTEVILLE,N.C.28305 fencing materials and unstable sediment deposits and bring the area to grade and stabilize it after the contributing drainage area has been property stabilized. PHONE(910)484-5191 FAX(910)484-0388 LICENSE ltF-0106 LAST SAVED:5/25/2022 3:30 PM LAST PLOTTED:5/25/2022 3:59 PM PLOTTED Bo:Dennis Gilbert FILENAME:G\CURRENT JOBS\ONSIE HOMES\22-2)24-01 TIMBERLAND RANCH-EC\PLANS\TIMBERLAND EC-LOT u3.DWG