HomeMy WebLinkAboutNCC231890_ESC Approval Submitted_20230621 ROY COOPER Governor / ELIZABETH S.RISER Secretary BRIAN WRENN Director Ji,INA 'n Wc,?srp November 29,2022 LETTER OF APPROVAL WITH MODIFICATIONS KCI Associates of NC,P.A. Attention: Elizabeth Phipps, Vice President 4505 Falls of the Neuse Road, Suite 400 Raleigh,North Carolina 27609 RE: Project Name: Yarbro Stream and Wetland Restoration Site Acres Approved: 56.42 Project ID: LINCO-2022-006 County: Lincoln, City: Laurel Hill Address: NC Hwy 27 River Basin: Broad Stream Classification: Other Submitted By: Kristin Knight,PE,KCI Associates of NC, P.A. Date Received by LQS: November 14, 2022 Plan Type: Revised Dear Ms. Phipps: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval with Modifications. The Modifications Required for Approval are listed on the attached page. This plan approval shall expire three (3) years following the date of approval, if no land-disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1,2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General Permit. After the form is reviewed and found to be complete,you will receive a link with payment instructions for the $100 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project,you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCGO1. Please direct questions about the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a new COC. Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site: .. North Carolina Department of Fnviranmental Quality I Division of Energy,Mineral and Land Resources Mooresville Regional Moe 1610 East Center Avenue,Suite 301 I Mooresville,North Carolina 28115 704-663-1699 Letter of Approval with Modifications KCI Associates of NC, P.A. November 29,2022 Page 2 of 3 1. The approved E&SC plan as well as any approved deviation. 2. The NCGO1 permit and the COC,once it is received. 3. Records of inspections made during the previous 30 days. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance-oriented,requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project,it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66),this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land- disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form,which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Your cooperation is appreciated. Sincerely, 445-4.4t 4j Shannon Leonard Assistant Regional Engineer Land Quality Section Enclosures: Certificate of Approval Modifications Required for Approval NCGO1 Fact Sheet c: Inspection Department ec: Kristin Knight,PE Letter of Approval with Modifications KCI Associates of NC, P.A. November 29, 2022 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: Yarbro Stream and Wetland Restoration Site Project ID: LINCO-2022-006 County: Lincoln 1. Skimmer Basins Nos. 1, 2, 3 and 4 shall be installed with the top of dam being continuous so that the embankment can tie into existing ground. The emergency spillway (EMS) shall be installed in natural ground and/or on the least amount of fill as possible. A minimum 1.5'of elevation shall be provided between the top of dam and the EMS. The diversion berms shall enter the upper reach of basins. The baffles shall be situated to provide diffuse flow prior to skimmer. 2. The diversion berms between Basins #2 and#3 (Sheet 46) shall be located as far down the slope (towards the silt fence)as possible where positive drainage can be obtained into each basin. 3. Stone outlets shall be provided in the silt fence for low-lying areas. PM t o CO a CY as , 4 E-1 Pb a, sm., To I, * 1 or L_ a tz Ima 09 °� U • W C 0 ,v A • M a� Poi 0 a w .� v Z g 4, IS : ''' .4 44 z.. .1 44 '‘` • taz fl•c x -Q• cu Ner 'a az 4,1 b � �! kr) o v o � 44 Pli li e WI ca) V% 13 m last e- -4--716Z4,Ii• . a pCLI.I, .... V ,,,,eta: ".: . a 6 qZ 5 PTI:ii tiolv.,, : ,:tt.:1,.i.,_.,,:: .,, co cis a 4:1 0 4 z111 Aar � � � � IQ = Z 1,5 = •. a `d, te.., .0a s - c' w° 4 L. w )—, . U o .Eo 1 � Ueocu � w ad rCA am"°' ei elg •,-t w C N h , aa corn y O a U Pc) 14.4OGA CA , - ?� v ..g al •am .atz ., el el Ems-+ gt ed co i a U '2-' A U Fact Sheet on the New NCGO1 Permit D E April 2019 The NC Construction General Permit(alga known as`N0001")was renewed on AprN 1,2019.The updated permit does not significantly change the measures that are required to be implemented on construction sites. However, there are some organizational and technical updates to the permit as described below.Most notably,there is a new process In which construction sites will obtain official coverage under an NCGO1 permit through an electronic process. DEMLR worked with a broad team of stakeholders to make all of these updates. If you have questions, contact Annette Lucas at gr: rw or(919)707-3639. Organizational Updates Acronyms to Know The new permit: COC: Certificate of Coverage, proof of coverage under an NCGO1 permit • Repeats state requirements for E&SC DEMLR: NC Division of Energy, Mineral,and Land Resources Plans and organizes them with federal E&SC: Erosion &Sedimentation Control construction activity requirements; e-NOI: Notice of Intent,application form for the NCG01 permit • Is clearly organized by topic; and e-NOT: Notice of Termination,form for closing out the NCG01 permit • Has less text and more tables. SWPPP: Stormwater Pollution Prevention Plan, required by the NCGO1 Technical Updates The new permit: • Requires that the E&SC Plan meet SWPPP requirements(p. 2); • Provides a list of items that must be included in the SWPPP,such as the construction sequence, plans, calculations, etc. (p. 2-4);1 • Has updated language on bypasses and upsets that is tailored to construction activities (p. 10); • Puts all timeframes for inspections, record-keeping and reporting in The NCGO1 Process "calendar days"for clarity and The new NCGO1 applies to permits approved on or after April 1,2019. consistency(p. 11-14);2 Permittees will no longer receive a copy of the NCGO1 permit in the mall • Changes the Inspection frequency with their E&SC Plan approvals and be considered as covered under the (during business hours)to at least once per 7 calendar days and after permit. Federal rules require that DEMLR receive an NOI on each everystorm> 1.0 inch construction project and issue each construction project its own COC. (previously 0.5 inch);3 and Under the new NCG01 process,construction sites will continue to • Excludes weekends,state and federal receive approval for E&SC Plans from either DEMLR or the delegated holidays from normal business hours local E&SC program just like before. After receiving E&SC Plan approval, unless construction activities take permittees will officially obtain coverage under the NCGO1 by place (p. 23). completing an e-NOI (available at deo.nc.eov/NCG01). The e-NOI will only take about 20 minutes to fill out and submit on-line. 1 This list is based on website guidance by the DEMLR Sediment Program. Initially, there will be no charge associated with applying for an NCG01 2 The number of calendar days was permit but on or around June 1,2019, DEMLR will begin charging a$100 selected to be as equivalent as annual general permit fee as required per§143-215.3D. possible with the previous permit. DEMLR is working on creating a single application form that will allow an 3 The intent is to provide predictability applicant to simultaneously apply for an E&SC permit and an NCGO1 to the inspection schedule. COC.That effort is part of a larger Permit Transformation project at DEMLii.