April 3, 2023
VIA ELECTRONIC MAIL
David Bailey
U.S. Army Corps of Engineers — Wilmington District
Raleigh Regulatory Field Office
3331 Heritage Trade Drive, Suite 105
Wake Forest, North Carolina 27587
Zach Thomas
NCDEQ — Division of Water Resources
Raleigh Regional Office
3800 Barrett Drive
Raleigh, NC 27609
Re: Response to Requests for Additional
Information
Jasper Place (fka Gannon Ave)
USACE AID: SAW-2020-01464
DWR ID: 20201604
(Approx. 53 acres)
Wake County, North Carolina
Dear Mr. Bailey and Mr. Thomas,
On behalf of Lennar Homes, we are providing a response to the Notification of Permit Non -
Compliance letter dated March 3, 2023, for Jasper Place, an approximately 53-acre site located
along W. Gannon Avenue in Zebulon, Wake County, North Carolina (the "Site").
The proposed sewer line crossing identified as Impact 1 C was authorized as a temporary stream
impact, with the line to be buried beneath the existing stream channel and bed and banks restored
to pre -construction contours. Instead, as noted in the Notification, the sewer line was installed
such that it is sitting above the stream bottom.
In order to address the comments in the Notification, we propose to install a cross vane up -stream
of the crossing which will result in pool formation beneath the existing pipe. See Attachment No.
1 for preliminary plans. Following installation, we will stabilize and replant the banks with native
vegetation. We will also conduct additional inspections to ensure that any debris buildup is
removed.
Set forth below are the requests from the Notification blue italics, followed by our responses.
ENGINEERING I DESIGN I TECHNOLOGY
Response to Requests for Additional Information
April 3, 2023
Page 2
a) Propose a plan to install, or correct the existing installation of, the utility line in such a way that
this crossing would comply with all terms and conditions of current NWP 58 (Utility Line
Activities for Water and Other Substances). Following discussion and Corps approval of a
plan, a timeframe for completion of the resulting activities will be provided by the Corps.
We propose to install a cross vane up -stream of the sanitary sewer crossing which will result
in pool formation beneath the existing pipe. The proposed timeline for the project is as follows:
• Final Site Plans, including Restoration Plan — within 2 months of agency preliminary
plan approval.
• Construction — within 2 to 3 months of agency approval of final site plans, depending
upon contractor availability at the time of agency approval. This includes completion
of the restoration plan and stabilizing and revegetating the area. Areas temporarily
impacted beyond the utility right-of-way for cross vane installation, if required, will be
temporarily seeded with native herbaceous species, then planted with woody
vegetation winter of 2023/2024, no later than March 2024. No woody plants are
proposed to be installed within the maintained utility right-of-way.
Compliance with the terms and conditions of NWP 58 are addressed below:
General Condition 2 — Aquatic Life Movement
The proposed plan will ensure continued aquatic life movement by creating a pool which
allows low flows to continue beneath the steel casing. This technique is known to be
utilized to enhance aquatic habitat through creation of scour pools. The cross vane will
mimic natural stream riffle -pool sequencing.
The project site is in an area with beaver activity and, therefore, aquatic life is regularly
subject to natural damming. However, this solution proposes quarterly inspection and
maintenance to ensure no artificial damming occurs along the steel casing.
General Condition 9 — Management of Water Flows
The proposal allows for the pre -construction course, condition, capacity, and location of
the stream to be maintained to the maximum extent practicable by maintaining the stream
location and only modifying a section of the stream to mimic the natural riffle -pool
sequence. The longitudinal profile of the stream demonstrates riffle and pool elevations
consistent with those naturally present within the stream in the immediate vicinity of the
project area. The pool beneath the steel casing will facilitate passage of low flows.
The existing stream contains a wide floodplain, with flows from the 10-year storm event
rising approximately 6-ft above stream banks across an approximately 580-ft wide area.
Therefore, the steel casing will not restrict high flows and the proposed design is preferred
to an aerial line, which poses the greater potential for restriction from the longer section of
exposed line and associated support piers.
Response to Requests for Additional Information
April 3, 2023
Page 3
General Condition 13 — Removal of Temporary Structures and Fills
The surrounding stream bed, bank, and wetland areas have been returned to pre -
construction elevations, stabilized, and revegetated with native species.
A portion of the stream bank has been permanently altered from the installation of the
steel casing. The line has been stabilized with concrete immediately beyond the top of
bank on either side of the stream.
The proposed solution will maintain this permanent impact and will include a restoration
plan. The bank will be reconstructed, seeded, and matted around the line. The cross vane
will provide additional bank protection at the utility crossing as this portion of the bank will
become an area of deposition with higher flows concentrated in the center of the channel.
Temporary access will be required for installation (exact area to be determined during final
design). Following installation, the area will be stabilized and re -planted with native
riparian seed. No woody species will be introduced into the sanitary sewer easement. If
temporary access impacts are required beyond the easement, woody species will be
planted.
General Condition 23(a) — Mitigation — Avoidance and Minimization
The proposed plan will avoid and minimize adverse effects to the maximum extent
practicable. Installation of the cross vane and resulting pool beneath the steel casing will
mimic natural stream conditions. The area will be stabilized and revegetated following
installation.
The proposed plan allows for avoidance of further impacts from removing the steel casing
and installing permanent aerial line piers across the surrounding floodplain and wetland.
Regional Condition 3.10 — Restoration of Temporary Impacts to Stream Beds
This condition is no longer included in the present-day Utility Crossing NWP, NWP 58.
The stream bed has been restored to pre -project elevations and widths.
The proposed solution will create a pool beneath the steel casing, mimicking the natural
pools present in the stream.
Regional Condition 3.11 — Restoration of Temporary Impacts to Stream Banks
This condition is no longer included in the present-day Utility Crossing NWP, NWP 58.
However, the proposed cross vane directs flow away from the banks and will create a pool
beneath the steel casing. The proposed cross vane through the redirection of stream flow
to the center of the channel will provide long term bank stabilization a distance of the arm
length both up and downstream of the installed structure. This allows for vegetation to be
installed during restoration to become established.
Response to Requests for Additional Information
April 3, 2023
Page 4
b) Propose a restoration plan, including a planting plan, for this stream bank area for Corps
approval using regionally appropriate native riparian vegetation. Note that such planting will
also need to meet NCDWR specifications. The required timeframe for completion of this work
will follow item a. above.
The plan will include a restoration and planting plan for the steel casing crossing and cross
vane installation area. Please see the timeline included in response item a. above.
As proposed with the initial application, the portions of the stream bank and surrounding
riparian buffer disturbed by this construction will be stabilized with C-700 coir matting and
revegetated with native herbaceous species as is required for sewer line easements. Cross
vane installation may require temporary impacts beyond the utility right-of-way. If required,
areas beyond the sewer line easement within the stream buffers will have temporary
stabilization with native seeding and a permanent re -planting plan with woody species.
c) Please self -inspect the remaining impacts authorized via the above -referenced NWP 12/14
verifications and additional NWP 14 verification and provide pictures and a brief narrative of
their construction status and compliance status per the authorized plans, Special Conditions,
and NWP General and Regional conditions.
The remaining impacts authorized under the original and additional verifications, which involve
road widening activities, were visually inspected on March 22, 2023. During the review of field
conditions, we determined that the stakes for the road widening impact were placed in the
wrong location and that additional temporary wetland impacts occurred. No fill material was
placed in the area outside of the originally permitted impact area. Lennar immediately
removed and reinstalled the silt fence and tree protection fence at the boundary of the
permitted impact area and installed a wetland seed mix and natural duff (pine straw) in the
temporarily impacted area outside of the permitted impact. This activity was completed on
March 29, 2023. Photos of this inspection and the corrective actions are attached for
reference. See Attachment No. 2.
Permanent riparian buffer, wetland, and stream Impact 1 from the second authorization are
currently in progress, with fill and grading work still being completed. Stream impacts have
not occurred yet for the permanent impacts required in order to extend the existing culverts.
It is anticipated the road widening and culvert extension will be complete by approximately
August 2, 2023.
I) DWR — Riparian Buffer Concerns
Impact 1C in the initial permit for this Site included 1,844-sq ft of permanent Zone 1 impact
and 1,303-sq ft of permanent Zone 2 impact of riparian buffer for the 30-ft wide utility corridor.
Per the Neuse River Buffer Rules, new sewer lines consisting of a perpendicular stream
crossing with a construction corridor of less than or equal to 40-ft wide and a permanent
Response to Requests for Additional Information
April 3, 2023
Page 5
maintenance corridor that is equal to or less than 30-ft wide are deemed allowable. The initial
approval was for a 30-ft wide corridor serving as both the construction and permanent
maintenance corridor. The proposed solution may require widening the construction corridor
to 40-ft wide for installation of the cross -vane, following which the portion outside of the 30-ft
wide permanent maintenance corridor will be stabilized, revegetated, and planted with woody
species. Therefore, the proposed solution still qualifies as deemed allowable.
Please review the preliminary plans and self -inspection photographs and contact Lauren Norris -
Heflin at (919) 866-4943 or lauren.norris-heflin@timmons.com if additional information is
required.
Sincerely,
Timmons Group
Lauren Norris -Heflin
Environmental Project Manager
Enclosures
Attachment 1 Preliminary Plans
Attachment 2 Site Inspection Photographs
42
BOULDER STABILIZATION
TOP ROCK ELEVATION=
TOP ROCK ELEV.=
4-5'
0 �S 2
oz Co-j
LL
10' WIDTH
INSTALL C-700 COCONUT FIBER BLANKETS
ON BANKS - SEE CROSS SECTION 3
SEED WITH RIPARIAN MIX AND REPLANT
WITH WOODY VEGETATION
BOULDER CROSS VANE DETAIL
NOTES:
1. BOULDER SIZE, MINIMUM 2' x 3' x 2.5'.
0 PLACE FOOTER
ROCKS 1/2 OF
OVERALL DIST.
(TYP. BOTH SIDES)
INSTALL C-700
COCONUT FIBER BLANKETS
BEYOND FURTHEST DOWN STREAM
10' WIDTH ROCK ON DISTURBED BANKS SEED
WITH RIPARIAN MIX AND REPLANT,
WITH WOODY VEGETATION
TOP ROCK ELEV
X z<7.
23936 — — —
EL3 239,35
EL / \
2388E 249.67
EL EL PoM — _ _ —
m85 /
238.80
1EE 12 DIP OUT
\
/ / \
610E \ \
23692
/ 1E f20/PIN1067
249.68
/ SANITARYMANHOLE
X
x \
PROPOSED CROSS VANE
X;
X7
/—�— // % - X
—�4°s;;e 4
237.09
10 X �,e� tw cp
/ rtw
237.44x cpi�3a, i/�PFo�a„0
L �— 1 � 1
237./' 11 I
tw > —fig( �
tw / x�' 237 39 1+20
/'lv 13 ' tw / 237.75 \ \ \ \
24011 / 237.07 / 237.77 tw hr
EL / / tw cp "IX TOE tw er
X 'ers
Xzo
e \ \
k \ \\
\
LOP pipe casing \ I \ \
237.01 tw / ' / \ \
40 tw X-2
236.95 — \
\ �� E \�o tw I _ _ _ — — — —
_ — — — —
4a{ �4.� `r9iL I — — — — — — za
111
23TO / X X
2 TOE
\ \9 44 237.71 \
_-- --- , 4 )237.68 twhr
237.0� \ tw er \
237 tw g2 \`
X z4o2\
roPE
X 241. \cS'
I /
\ I III / I I 1 1 I ✓
\ I IIII II 1 I I C I \\
X 2EL 4830 1
/ I,AV I I I I I
X w.� \ \ X z<o� M W 51
kp
i'
ELJ66
FI RlM
21363
3135
EL
610E 312E1081
2
2313E
/EE 12D/POUT
IEB 12DI1 IN X zaaro \
61073J LLJ 18 \
SqN
243,67
SANITARYMANHOLE \ \
X \
X z—
MORPH DA TA
SCALE 1 "=10'
------------
243
0 10' 20'
--------------
24054
/ \ TN 85209
/ \ 24051
TOP1
17
/ 237.65
\ / 240.5
\ \ l 1 CK BS tw X
23932 237.81� / / , V✓" / /
TOEf 2 tw
l TOPiI 237.83
l / / 2 \
\ / / i 237.14 tw
tw at pipe
238.42 2 —23 / \
/ 236.90 237.70
� / / \
t 34 tw at pipe tw / \
\
238.34x`b
236.88 tw er 1
TOEI / \ X _ 2P
25
2382E TOP
,0 EL 12DIP of /
n tw 2ko i /�(j f 240.13
X/// EL
X <o // ' V �38 �3 j / 2337.81 239.29
� / / V
r� \
''A\TAT A
��������������
R•] U
I I K■ [• I11 Y•
1 ■ J toll I
�������������,r,err'�r■i:srr.�a
�-�ss,rrri
e3
�r•arrrr�
n>_�����������
•
����
���aaaR����������aaaa�a�w�����aaaaa��aawaaa���
�������
�����—����������aaaary�aaaa�:ar■���aaaaaa��iaaaaaa�aaw.�����
������■�
���aa■a����������aaaaawa�aaaaauu■�����,aaaaaaa�aa■aua�����
�����•��aaaaar.:a■����r_aaaaaaa�aa■ara�aaarra���
of 18-inch Pipe
�aaaaaa����w
■■■■■i+�
��•aaTop
����aa■a+wa•���
����
ua���
��■■■�c
•
�■■■■■rw
■���■s�a
��
rr�s+aa
���
��aaaa■�
�■■■■■w
■���■■aaaa�aa
■■■■■■�■�
■�■■■►aa
a���
aaaaa��
����
����
�����
�a�.���r�����aa■■r����
����■���■���
aaaaaaa�aa■ar.�aaa�a���
aaaaaaar_����:a
���aa■�a���
����
��aaaaar•a■����aaaaaaaa�aa■■��►���
1
�����
����r�����
►���aaaa�a�aaaaa�a■���aaaaaaaaaaaaaaaa�aa■a�aaau�a���
����
-
���aa■w����
a����aaaa�,a�aaaaar-,�■����aaaaaaa��r-������
�'~��
����L�����������r���■���aaaaaa�raaaaaaa�a�a�ar�a���
�s�
��r•
�
����
a-��������
��aaaaa:�
�aaaaaw�
■����■
aaaaaa�aa■
aw�aaaw
a���
•■■���aaaaaa�•aaaaaaa�aa■a����i���
�������������■�aaaaaa������
����i..■
�
-���■�����
�
�������.�-����■�����al�aa■aaaa�aaaaa■a�aaaaaa\
����a�aaaa�■aaaaaaa■���aa■aaaa�����
�������■�����aa■aaaa����
•
Photo 1: Limits of disturbance and silt fencing along the east side of the upstream end of the
road culvert (view east). Photo taken March 22, 2023.
^✓��tip V �r
Photo 2: Limits of disturbance and silt fencing along the east side of the upstream end of the
road culvert (view east). Photo taken April 3, 2023.