Loading...
HomeMy WebLinkAbout20230867 Ver 1_Rankin No Rise Report_20230609Conservation Management Institute 801 VZ77 V 1 RG I N 1 A Blacksburg,Ity ty VA 124 61ulevard(0534)' Suite 21 T EC H�M (540) 231-8825 Fax: (540) 231-7019 http://cmi.vt.edu email: benbradley@vt.edu February 21, 2023 Mr. Brad Burton, CFM Buncombe County Planning & Development 46 Valley St Asheville, NC 28801 RE: Rankin Streambank Stabilization Project No -Rise Certification Fairview, NC (Buncombe County) Mr. Burton, Please find digitally enclosed the No -Rise Certification for the Rankin Streambank Stabilization project in Buncombe County, NC (dated 2/21/2023). The project is funded through the Natural Resource Conservation Service (NRCS) Environmental Quality Incentives Program (EQIP). A narrative describing the project location and providing details about the hydraulic model used to determine the No -Rise is included with this letter. The HEC-RAS model that includes this reach of Garren Creek is also included with this letter in digital compressed format. Thank you for your consideration of this No -Rise Certification. Please contact Benjamin Bradley with any questions or concerns you may have at (704) 860-2200. Sincerely, Benjamin Bradley, P.E., C.F.M. Private Lands Engineer Virginia Tech Conservation Management Institute Invent the Future VIRGINIA POLYTECHNIC INSTITUTE AND STATE UNIVERSITY An equal opportunity, affirmative action institution No Rise Checklist for Submittals: All of the required items for review are included as noted below: X Digital copy of hydraulic models used in the study; X Copy (digital or otherwise) of the effective hydraulic model; X Check if the Preliminary Hydraulic Model is used as the Effective Model for the analysis; X Project narrative; X Topographic work map showing existing and proposed conditions; X Cross -sections showing existing and proposed conditions; X Map or plat of the property; Preliminary or recorded plat of the mitigation area (if applicable; see below); X No -Rise Certification from a North Carolina Professional Engineer. If a mitigation area or other space will be set aside to mitigate the effect of the encroachment, then a preliminary or recorded plat of the mitigation area, or a description of how the mitigation area will be preserved in perpetuity, will be needed. Certification to the following: • The project as shown on the Topographic Work Map matches the elements of the permit application. • The proposed project will comply with the Endangered Species Act. • The project otherwise will meet all requirements for permitting under our local ordinance. • The model results as provided do not indicate an increase in flood levels either in the base flood nor the floodway / encroachment. 02� Engi eer's Signature 2/21/2023 Date NO -RISE CERTIFICATION This document is to certify that I am duly qualified engineer licensed to practice in the State of North Carolina. It is to further certify that the attached technical data supports the fact that the proposed Rankin Streambank Stabilization will not increase the base flood elevations or floodway elevations, or impact the floodway widths, on Garren Creek at published cross - sections in the Flood Insurance Study for Buncombe County dated 2/21/23 and will not increase the base flood elevations or floodway elevations, or impact the floodway widths at unpublished cross - sections in the area of the proposed development. CIA IR SEAL = _ 052430 .. llllOO Seal and Signature Benjamin Bradley Name Private Lands Engineer Title 801 University City Blvd Suite 12, Blacksburg, VA 24061 Address February 21, 2023 Date FOR COMMUNITY USE ONLY ❑ Approved ❑ Disapproved Name and Title Signature Date NO -RISE CERTIFICATION REPORT for Garren Creek — Rankin Streambank Stabilization Project Garren Creek Fairview, Buncombe County, NC February 21, 2023 Prepared For: Natural Resource Conservation Service Asheville USDA Service Center 160 Zillicoa Street Asheville, NC 28801 Prepared By: Benjamin Bradley, P.E., C.F.M. 801 University City Blvd Suite 12, Blacksburg, VA 24061 `VU VIRGINIA TECH.. Project Narrative Overview The Rankin Streambank Stabilization Project (the project) is located along Garren Creek in Buncombe County, North Carolina. Proposed work will be limited to the Rankin Beef Farm property (Pin Number 969615777000000) located at 297 Church Road, Fairview, North Carolina. Proposed work includes stabilizing four sections of streambank totaling 310 linear feet using boulder toe, reconnecting the floodplain with a bankfull bench, and establishing a riparian buffer along the left bank. Garren Creek is a Federal Emergency Management Agency (FEMA) regulated channel, referenced on Flood Insurance Rate Map (FIRM) Panel 3700969600J (effective date January 61", 2010). See Appendix A for the FIRM Panel. Since Garren Creek is a FEMA regulated Zone AE channel, a no -rise certification is required for the floodplain development permit. The following narrative presents the no -rise analysis. Hydraulic Modeling A series of hydraulic models were developed to evaluate the potential effects of the project with respect to the FEMA regulated floodplain. This analysis was completed using the U.S. Army Corps of Engineers River Analysis Software (HEC-RAS 6.2), which uses one-dimensional energy balance equations to solve for hydraulic flow characteristics. HEC-RAS assumes steady, non -uniform flow while performing a backwater analysis through the subject reach. Below is a description of the hydraulic models reviewed and developed for preparation of the no -rise analysis. Effective Model The Effective model was available for download as a HEC-RAS model from the North Carolina Flood Risk Information System (FRIS). The model is part of the Limited Detail Study (LDS) that runs along Garren Creek from approximately 300 feet upstream of Bleeker Lane to the confluence with Cane Creek. FIS cross -sections 011, 014, 017, 022, and 026 are located within the project area. Information on the effective hydrologic study and shapefiles from the model geometry were available for download as well. Duplicate Effective Model The Duplicate Effective model was created by running the Effective model in HEC-RAS 6.2. Encroachment widths at River Stations 9889, 9596, 8868, 6587, 5993, 5496, 4758, 4555, 4227, 3783, 3002, 2604, and 1735 were updated to Method 1 using the non -encroachment widths shown on FRIS. The 100-year water surface elevation and floodway elevations were confirmed to be identical to the results reported through FRIS. Existing Conditions Model The Existing Conditions model was developed to address current site conditions and/or to incorporate more detailed information into the analysis in order to accurately model the area under pre -project conditions. In this analysis, this model was used to establish the existing water surface elevations for the base flood and floodway. 2 1 P a g e Additional cross -sections were added to the model at River Station 1953, 1479, and 1163. Cross-section geometry was generated using topographic survey data supplemented with publicly available LiDAR data. The geometry at River Station 1735 to 966 were updated based on the site survey data as well. See Appendix B for the Hydraulic Graphic with locations of FIS cross -sections along with additional modeling cross -sections. The HEC-RAS stations shown at the top of the cross-section lines (in yellow) and FIS cross-section numbers shown at the bottom. Bank stations were set based on site survey data for River Station 1953 to 966. In the Effective model the Manning's roughness coefficient for the channel varies from 0.045-0.05. Based on field observations this range seems appropriate and was used for setting the Manning's value for the additional cross -sections. Overbank Manning's n values were defined in the Effective model as 0.09 for forested area and 0.05 for pasture. These same values were used in the Existing Conditions model. A steady state flow condition with the 100-year peak flows from the Effective model were used. The 100-year peak flow ranges from 1,790 cfs to 1,820 cfs within the area of interest. The downstream boundary condition is set at normal depth with a channel slope of 0.008 ft/ft. The peak flows and boundary condition are consistent with the parameters used in the Effective model. The model was run using the subcritical flow regime. This assumption was then verified looking at the Froude number. The Froude number for all the sections is below one so a subcritical flow regime is appropriate. Encroachment widths were kept consistent with the encroachment widths used in the Duplicate Effective model. Encroachment widths for River Station 1953, 1479, and 1163 were set using Method 1 and interpolated values from the upstream and downstream cross -sections. Water surface elevation results are shown below in Table 1. Detailed modeling results are shown in Appendix C. Proposed Conditions Model The Proposed Conditions model reflects conditions in the channel and floodplain after the proposed work has been completed. Water surface elevations from the Proposed Conditions model will be compared to the Existing Condition model to verify the no -rise condition. The Proposed Conditions model was developed by incorporating the proposed stream restoration work into the topography of the cross -sections within the project. Cross -sections within the project area were updated to reflect proposed conditions using the typical cross- section in the Construction Plans shown in Appendix D. Bank stations along the left bank where the boulder toe is proposed were updated to correspond with the proposed top of bank location. The Manning's n value for the channel ranged from 0.045-0.05. Manning's n values for the left bank of cross -sections with boulder toe or live stakes were adjusted to 0.05-0.055 to account for increased roughness along the bank. The riparian buffer was accounted for by increasing the Manning's n from 0.06 to 0.08 in the buffer areas along the left bank. See Appendix C for graphical comparisons of Existing Conditions and Proposed Condition model cross -sections. 3 1 P a g e Hydraulic Analysis Results and Conclusions To evaluate the potential impact of the streambank stabilization work on riverine hydraulics and base flood elevations, the results of the Proposed Condition model were compared with the Existing Conditions model. Results of the hydraulic analysis show that the proposed project will result in a no -rise condition along Garren Creek. The table below shows the comparison of the 100-year base flood elevations for the Existing Conditions model and the Proposed Condition model. As indicated in the table, the Proposed Condition model results are lower or equal to the Existing Conditions model results for the cross -sections within the proposed project area. Table 1. Existing Condition and Proposed Condition Water Surface Elevation Comparison Reach River Sta Profile FIS XSC Existing W.S. Elev Proposed W.S. Elev A (ft) (ft) (ft) Garren Creek 10198 100-YR 102 2381.76 2381.76 0.00 Garren Creek 9988 100-YR 2381.58 2381.58 0.00 Garren Creek 9889 100-YR 2377.21 2377.21 0.00 Garren Creek 9596 100-YR 96 2373.28 2373.28 0.00 Garren Creek 9170 100-YR 92 2368.76 2368.76 0.00 Garren Creek 8868 100-YR 89 2367.51 2367.51 0.00 Garren Creek 8678 100-YR 2367.43 2367.43 0.00 Garren Creek 8578 100-YR 2362.82 2362.82 0.00 Garren Creek 8336 100-YR 83 2361.02 2361.02 0.00 Garren Creek 8032 100-YR 80 2360.34 2360.34 0.00 Garren Creek 7955 100-YR 2360.31 2360.31 0.00 Garren Creek 7869 100-YR 2356.14 2356.14 0.00 Garren Creek 7661 100-YR 77 2354.38 2354.38 0.00 Garren Creek 7410 100-YR 74 2353.89 2353.89 0.00 Garren Creek 7342 100-YR 2353.81 2353.81 0.00 Garren Creek 7240 100-YR 2350.89 2350.89 0.00 Garren Creek 6965 100-YR 70 2348.44 2348.44 0.00 Garren Creek 6587 100-YR 66 2346.17 2346.17 0.00 Garren Creek 6307 100-YR 2345.87 2345.87 0.00 Garren Creek 6216 100-YR 2342.49 2342.49 0.00 Garren Creek 5993 100-YR 60 2341.89 2341.89 0.00 Garren Creek 5785 100-YR 2341.68 2341.68 0.00 Garren Creek 5721 100-YR 2338.01 2338.01 0.00 Garren Creek 5469 100-YR 55 2335.45 2335.45 0.00 Garren Creek 4758 100-YR 48 2332.10 2332.10 0.00 Garren Creek 4555 100-YR 2331.94 2331.94 0.00 Garren Creek 4462 100-YR 2327.92 2327.92 0.00 4 1 P a g e Garren Creek 4227 100-YR 42 2325.59 2325.59 0.00 Garren Creek 3783 100-YR 38 2322.99 2322.99 0.00 Garren Creek 3328 100-YR 33 2319.86 2319.86 0.00 Garren Creek 3002 100-YR 30 2317.70 2317.70 0.00 Garren Creek 2604 100-YR 26 2314.84 2314.83 -0.01 Garren Creek 2187 100-YR 22 2312.03 2311.96 -0.07 Garren Creek 1953 100-YR 2308.63 2308.61 -0.02 Garren Creek 1735 100-YR 17 2306.59 2306.59 0.00 Garren Creek 1479 100-YR 2304.97 2304.96 -0.01 Garren Creek 1409 100-YR 14 2304.79 2304.77 -0.02 Garren Creek 1163 100-YR 2304.41 2304.36 -0.05 Garren Creek 1113 100-YR 11 2304.40 2304.35 -0.05 Garren Creek 966 100-YR 2304.20 2304.14 -0.06 Garren Creek 872 100-YR 2300.23 2300.23 0.00 Garren Creek 573 100-YR 6 2297.92 2297.92 0.00 Garren Creek 357 100-YR 4 2296.11 2296.11 0.00 Bold cross -sections are within the boundary of the project 5 1 P a g e /_1:2 :2 =1L,IQp7aw_1 FEMA FIRM PANEL FLOOD HAZARD INFORMATION SEE RS REPORT FOR ZONE DESCRIPTIONS AND IN DR MAP THE INFORMATION DEPICTED ON THIS MAP AND SUPPORTING DOCUMENTATION ME ALSO AVAIIABLE IN DIGITAL FORMAT AT HTTPV/FRIS.NC.GOV/FRIS WMt .Base Rootl El..Uon(BFE) With BFEVorDepM zone AE Ao A 1A Al SPECIAL FLOODHAZMDAREAS Reg.latory Rootlway ^®, 0.1% Annual Chance Flootl Haurtl, Areas of 1%Annual Chance Rootlwidl Avenge Depth Less Than One Footor Wlth Dainage Areasof Less Than One Square M le zone x — Future C.ntl tons l%Annual Chance Flootl Hazartl zone x OTHERARMS OF — Area wth R.tluc.tl Rootl Rsk tlue to Lae. FLOOD HAZARD See Notes OTHER — Areas DMaminetltobe0utsitlethe AREAS 0.2%Annual Chance Flootlplain zonex -------- Channel,Culvert, or Storm S.wer »� Accretlitetl or Provisionally Accretlitetl GENERAL Laee, Dike, or Floodnall STRUCMRES ............. Nonaaretlitetl Lae, Dike, or FImdAAII NOM Carelim G..deic Survey bench mark N.Uonal G.,kU. Survey bench mark 55 . Contactor Est NCFMP Survey bench mark K to — O .Sections with 1%Annua1 Chance Water Surface EWwation(BFE) O----- CoastalTanseR ------ CoasGlTanseR Base line --- PreRle Baseline Hytlrogaphic Feature OTHER Limitof Study FMIURES Juristliction Bountlary TES TO USERS nLimitof Motleate Yihve Action (LIMA) TEM(cBRp NOTE ®pCBRSArea OUeiwise Pah WArea SCALE N- I,N—lase—,-I) I inch = 500 feel 0 250 500 t 10 Feet Meters 0 15 150 300 PANEL LOCATOR 1 v_ �\1 vnrvcty couxry 1/ moNmvnrvu courm� xErvoEieory murvry /roucourm NORTH CAROLINA ROODPIAIN MAPPING PROGRAM NMONALROODINSURMCEPROGRAM C13 FLOOD INSURANCE RATE MAP �I vp NORTH CAROLINA Wna9696 m N FFMA co y anel Contains. 2�' FIX N eu ncoea counry svuosi ssssEl i S= l7 _0 LL (13 S= acc z MAP NUMHER 5 3700969600J REVISED 0��lz /_1:2 :2 =1L,IQP :1 HYDRAULIC GRAPHIC APPENDIX C HEC-RAS MODELING EXISTING CONDITIONS MODELING RESULTS HEC-RAS Plan: Ex Cond River: Garren Creek Reach: Reach-1 Reach River Sta Profile Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Val Chnl Flow Area Top Width Froude # Chl (cfs) (fi) (h) (fi) (R) Mitt) MIS) (59 ft) (R) Reach-1 10198 100-year 1500.00 2374.58 2381.76 2381.88 0.001680 3.82 921.06 424.83 0.28 Reach-1 10198 100-FW 1500.00 2374.58 2382.76 2382.91 0.001390 3.86 675.27 173.58 0.26 Reach-1 9988 100-year 1500.00 2373.50 2381.58 2379.24 2381.60 0.000554 2.08 1591.10 443.17 0.13 Reach-1 9988 100-FW 1500.00 2373.50 2382.53 2379.24 2382.59 0.001210 3.33 842.75 158.59 0.20 Reach-1 9951 Bridge Reach-1 9889 100-year 1500.00 2373.25 2377.21 2377.21 2377.35 0.004288 4.10 536.64 347.57 0.41 Reach-1 9889 100-FW 1500.00 2373.25 2377.32 2377.21 2377.72 0.008987 6.07 307.72 135.94 0.60 Reach-1 9596 100-year 1500.00 2368.40 2373.28 2373.69 0.007356 7.01 403.46 311.13 0.61 Reach-1 9596 100-FW 1500.00 2368.40 2373.33 2374.39 0.013255 9.48 195.44 62.54 0.82 Reach-1 9170 100-year 1500.00 2363.14 2368.76 2368.16 2369.76 0.011919 10.58 292.12 229.61 0.81 Reach-1 9170 100-FW 1500.00 2363.14 2369.05 2369.83 0.007774 8.86 240.85 73.00 0.66 Reach-1 8868 100-year 1500.00 2360.26 2367.51 2367.56 0.000733 2.76 869.43 307.22 0.20 Reach-1 8868 100-FW 1500.00 2360.26 2368.26 2368.34 0.000701 2.93 723.01 176.36 0.20 Reach-1 8678 100-year 1500.00 2358.00 2367.43 2363.89 2367.45 0.000267 2.29 1225.38 337.21 0.13 Reach-1 8678 100-FW 1500.00 2358.00 2368.19 2363.88 2368.23 0.000268 2.42 977.07 174.50 0.13 Reach-1 8634 Bridge Reach-1 8578 100-year 1500.00 2357.75 2362.82 2362.71 2363.39 0.010081 9.22 310.56 178.33 0.73 Reach-1 8578 100-FW 1500.00 2357.75 2362.93 2362.71 2363.48 0.008854 8.77 295.33 135.00 0.69 Reach-1 8336 100-year 1790.00 2355.45 2361.02 2361.39 0.005645 6.59 434.70 222.62 0.51 Reach-1 8336 100-FW 1790.00 2355.45 2361.12 2361.59 0.006465 7.14 366.49 139.00 0.54 Reach-1 8032 100-year 1790.00 2351.56 2360.34 2360.37 0.000381 2.12 1259.69 347.75 0.13 Reach-1 8032 100-FW 1790.00 2351.56 2360.38 2360.42 0.000366 2.09 1178.24 275.00 0.13 Reach-1 7955 100-year 1790.00 2350.00 2360.31 2356.24 2360.35 0.000270 2.37 1327.81 323.55 0.13 Reach-1 7955 100-FW 1790.00 2350.00 2360.18 2356.24 2360.34 0.000859 4.19 621.46 108.30 0.23 Reach-1 7911 Bridge Reach-1 7869 100-year 1790.00 2349.75 2356.14 2356.06 2357.29 0.009652 10.15 248.12 183.09 0.72 Reach-1 7869 100-FW 1790.00 2349.75 2356.25 2356.07 2357.33 0.008904 9.86 257.14 84.20 0.69 Reach-1 7661 100-year 1790.00 2347.55 2354.38 2353.15 2355.51 0.007413 9.52 299.78 188.19 0.66 Reach-1 7661 100-FW 1790.00 2347.55 2354.35 2353.74 2355.56 0.007746 9.71 258.49 110.00 0.68 Reach-1 7410 100-year 1790.00 2346.07 2353.89 2352.05 2354.09 0.001657 4.35 588.05 308.34 0.31 Reach-1 7410 100-FW 1790.00 2346.07 2353.83 2352.05 2354.06 0.001809 4.52 554.53 179.00 0.33 Reach-1 7342 100-year 1790.00 2344.50 2353.81 2351.61 2353.98 0.001120 4.31 621.29 351.39 0.26 Reach-1 7342 100-FW 1790.00 2344.50 2353.76 2351.62 2353.93 0.001207 4.46 614.01 140.00 0.27 Reach-1 7286 Bridge Reach-1 7240 100-year 1790.00 2344.34 2350.89 2350.89 2351.85 0.009504 9.76 285.81 217.76 0.70 Reach-1 7240 100-FW 1790.00 2344.34 2351.78 2350.90 2352.23 0.003987 6.94 393.06 120.00 0.47 Reach-1 6965 100-year 1790.00 2342.32 2348.44 2348.44 2349.06 0.009304 9.06 401.86 273.55 0.66 Reach-1 6965 100-FW 1790.00 2342.32 2349.02 2350.33 0.012174 11.03 218.85 58.00 0.76 Reach-1 6587 100-year 1790.00 2339.19 2346.17 2346.39 0.002283 5.02 632.54 301.93 0.36 Reach-1 6587 100-FW 1790.00 2339.19 2347.06 2347.34 0.002000 5.15 475.34 113.63 0.35 Reach-1 6307 100-year 1790.00 2334.50 2345.87 2343.08 2345.92 0.000462 2.75 1169.77 382.91 0.15 Reach-1 6307 100-FW 1790.00 2334.50 2346.62 2343.45 2346.86 0.001279 4.80 511.68 85.00 0.25 Reach-1 6256 Bridge Reach-1 6216 100-year 1790.00 2334.25 2342.49 2341.96 2342.85 0.003716 6.15 474.86 215.34 0.43 Reach-1 6216 100-FW 1790.00 2334.25 2343.36 2342.02 2344.15 0.005159 7.90 281.68 60.00 0.52 Reach-1 5993 100-year 1790.00 2333.62 2341.89 2342.13 0.002181 5.15 558.81 198.53 0.34 Reach-1 5993 100-FW 1790.00 2333.62 2342.82 2343.11 0.001897 5.22 458.14 91.64 0.33 Reach-1 5785 100-year 1790.00 2332.50 2341.68 2339.44 2341.75 0.000701 3.00 939.02 263.53 0.18 Reach-1 5785 100-FW 1790.00 2332.50 2342.55 2339.43 2342.73 0.001251 4.28 597.13 101.00 0.24 Reach-1 5754 Culvert HEC-RAS Plan: Ex Cond River: Garren Creek Reach: Reach-1 (Continued) Reach River Sta Profile Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Val Chnl Flow Area Top Width Froude # Chl (cfs) (ft) (ft) (ft) (ft) (ft/ft) (fus) (sq ft) (ft) Reach-1 5721 100-year 1790.00 2332.42 2338.01 2338.01 2338.48 0.006806 7.51 385.47 181.96 0.59 Reach-1 5721 100-FW 1790.00 2332.42 2338.31 2338.01 2338.95 0.007008 7.92 305.33 90.00 0.60 Reach-1 5469 100-year 1790.00 2329.52 2335.45 2335.23 2335.96 0.009215 7.30 375.73 212.03 0.60 Reach-1 5469 100-FW 1790.00 2329.52 2336.17 2335.50 2336.92 0.009071 7.99 277.53 81.32 0.61 Reach-1 4758 100-year 1790.00 2323.05 2332.10 2329.81 2332.21 0.000997 3.40 835.30 305.61 0.22 Reach-1 4758 100-FW 1790.00 2323.05 2333.08 2329.70 2333.20 0.000857 3.41 658.03 117.01 0.21 Reach-1 4555 100-year 1790.00 2322.00 2331.94 2328.89 2332.02 0.000706 3.09 905.75 246.44 0.18 Reach-1 4555 100-FW 1790.00 2322.00 2332.82 2328.89 2333.00 0.001105 4.09 563.06 95.00 0.22 Reach-1 4499 Bridge Reach-1 4462 100-year 1790.00 2321.75 2327.92 2327.92 2328.63 0.007242 8.46 386.05 250.17 0.63 Reach-1 4462 100-FW 1790.00 2321.75 2328.27 2327.95 2329.17 0.007373 8.89 283.68 95.00 0.64 Reach-1 4227 100-year 1790.00 2319.67 2325.59 2325.59 2326.19 0.007455 7.70 416.25 308.05 0.63 Reach-1 4227 100-FW 1790.00 2319.67 2325.99 2325.88 2327.12 0.009877 9.35 248.24 93.66 0.73 Reach-1 3783 100-year 1790.00 2315.90 2322.99 2323.24 0.003170 5.02 546.48 240.98 0.38 Reach-1 3783 100-FW 1790.00 2315.90 2323.35 2323.77 0.004258 6.06 396.50 125.66 0.44 Reach-1 3328 100-year 1790.00 2313.20 2319.86 2319.86 2320.91 0.011249 9.65 271.27 185.28 0.70 Reach-1 3328 100-FW 1790.00 2313.20 2320.07 2319.75 2321.03 0.009670 9.15 264.19 85.00 0.65 Reach-1 3002 100-year 1790.00 2311.08 2317.70 2317.92 0.003679 5.46 595.02 293.77 0.39 Reach-1 3002 100-FW 1790.00 2311.08 2318.20 2318.56 0.004424 6.30 422.26 126.42 0.43 Reach-1 2604 100-year 1790.00 2307.33 2314.84 2313.58 2315.87 0.007621 8.74 293.14 126.98 0.60 Reach-1 2604 100-FW 1790.00 2307.33 2315.71 2316.59 0.005286 7.92 265.81 46.60 0.51 Reach-1 2187 100-year 1790.00 2304.10 2312.03 2311.70 2312.70 0.007036 8.09 453.93 240.33 0.54 Reach-1 2187 100-FW 1790.00 2304.10 2312.06 2311.36 2313.50 0.011698 10.46 227.54 50.10 0.70 Reach-1 1953 100-year 1790.00 2301.40 2308.63 2308.25 2310.36 0.014926 11.60 241.45 159.14 0.81 Reach-1 1953 100-FW 1790.00 2301.40 2309.37 2310.87 0.010806 10.61 215.57 38.00 0.70 Reach-1 1735 100-year 1790.00 2301.64 2306.59 2306.36 2307.18 0.011102 7.71 342.07 198.24 0.68 Reach-1 1735 100-FW 1790.00 2301.64 2307.00 2306.85 2308.05 0.014238 9.32 242.45 88.78 0.78 Reach-1 1479 100-year 1790.00 2298.00 2304.97 2305.24 0.003328 5.87 542.22 248.98 0.42 Reach-1 1479 100-FW 1790.00 2298.00 2305.03 2305.47 0.004533 6.89 400.52 140.05 0.49 Reach-1 1409 100-year 1790.00 2298.55 2304.79 2305.01 0.002853 5.25 593.80 269.32 0.39 Reach-1 1409 100-FW 1790.00 2298.55 2304.82 2305.14 0.003685 5.98 449.90 154.00 0.45 Reach-1 1163 100-year 1790.00 2295.31 2304.41 2304.51 0.000920 3.54 858.37 285.32 0.22 Reach-1 1163 100-FW 1790.00 2295.31 2304.42 2304.51 0.000885 3.48 856.87 271.19 0.22 Reach-1 1113 100-year 1790.00 2294.73 2304.40 2304.46 0.000694 2.90 1074.18 381.27 0.17 Reach-1 1113 100-FW 1790.00 2294.73 2304.40 2304.47 0.000767 3.05 949.36 295.00 0.18 Reach-1 966 100-year 1820.00 2293.98 2304.20 2300.91 2304.33 0.000747 3.66 673.47 412.84 0.21 Reach-1 966 100-FW 1820.00 2293.98 2304.20 2300.92 2304.33 0.000804 3.79 673.27 118.00 0.22 Reach-1 911 Bridge Reach-1 872 100-year 1820.00 2293.99 2300.23 2300.21 2300.78 0.007029 7.09 427.15 316.18 0.60 Reach-1 872 100-FW 1820.00 2293.99 2301.19 2300.27 2301.93 0.005756 7.33 296.96 85.00 0.56 Reach-1 573 100-year 1820.00 2292.81 2297.92 2298.31 0.009296 6.82 484.06 415.74 0.61 Reach-1 573 100-FW 1820.00 2292.81 2298.66 2299.56 0.011801 8.64 268.09 96.80 0.71 Reach-1 357 100-year 1820.00 2291.07 2296.11 2295.78 2296.41 0.008002 5.88 527.18 366.48 0.56 Reach-1 357 100-FW 1820.00 2291.07 2296.81 2296.07 2297.30 0.008001 6.65 398.96 141.19 0.58 PROPOSED CONDITIONS MODELING RESULTS HEC-RAS Plan: Pr Cond River: Garren Creek Reach: Reach-1 Reach River Sta Profile Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Val Chnl Flow Area Top Width Froude # Chl (cfs) (fi) (h) (fi) (R) Mitt) MIS) (59 ft) (R) Reach-1 10198 100-year 1500.00 2374.58 2381.76 2381.88 0.001680 3.82 921.06 424.83 0.28 Reach-1 10198 100-FW 1500.00 2374.58 2382.76 2382.91 0.001390 3.86 675.27 173.58 0.26 Reach-1 9988 100-year 1500.00 2373.50 2381.58 2379.24 2381.60 0.000554 2.08 1591.10 443.17 0.13 Reach-1 9988 100-FW 1500.00 2373.50 2382.53 2379.24 2382.59 0.001210 3.33 842.75 158.59 0.20 Reach-1 9951 Bridge Reach-1 9889 100-year 1500.00 2373.25 2377.21 2377.21 2377.35 0.004288 4.10 536.64 347.57 0.41 Reach-1 9889 100-FW 1500.00 2373.25 2377.32 2377.21 2377.72 0.008987 6.07 307.72 135.94 0.60 Reach-1 9596 100-year 1500.00 2368.40 2373.28 2373.69 0.007356 7.01 403.46 311.13 0.61 Reach-1 9596 100-FW 1500.00 2368.40 2373.33 2374.39 0.013255 9.48 195.44 62.54 0.82 Reach-1 9170 100-year 1500.00 2363.14 2368.76 2368.16 2369.76 0.011919 10.58 292.12 229.61 0.81 Reach-1 9170 100-FW 1500.00 2363.14 2369.05 2369.83 0.007774 8.86 240.85 73.00 0.66 Reach-1 8868 100-year 1500.00 2360.26 2367.51 2367.56 0.000733 2.76 869.43 307.22 0.20 Reach-1 8868 100-FW 1500.00 2360.26 2368.26 2368.34 0.000701 2.93 723.01 176.36 0.20 Reach-1 8678 100-year 1500.00 2358.00 2367.43 2363.89 2367.45 0.000267 2.29 1225.38 337.21 0.13 Reach-1 8678 100-FW 1500.00 2358.00 2368.19 2363.88 2368.23 0.000268 2.42 977.07 174.50 0.13 Reach-1 8634 Bridge Reach-1 8578 100-year 1500.00 2357.75 2362.82 2362.71 2363.39 0.010081 9.22 310.56 178.33 0.73 Reach-1 8578 100-FW 1500.00 2357.75 2362.93 2362.71 2363.48 0.008854 8.77 295.33 135.00 0.69 Reach-1 8336 100-year 1790.00 2355.45 2361.02 2361.39 0.005645 6.59 434.70 222.62 0.51 Reach-1 8336 100-FW 1790.00 2355.45 2361.12 2361.59 0.006465 7.14 366.49 139.00 0.54 Reach-1 8032 100-year 1790.00 2351.56 2360.34 2360.37 0.000381 2.12 1259.69 347.75 0.13 Reach-1 8032 100-FW 1790.00 2351.56 2360.38 2360.42 0.000366 2.09 1178.24 275.00 0.13 Reach-1 7955 100-year 1790.00 2350.00 2360.31 2356.24 2360.35 0.000270 2.37 1327.81 323.55 0.13 Reach-1 7955 100-FW 1790.00 2350.00 2360.18 2356.24 2360.34 0.000859 4.19 621.46 108.30 0.23 Reach-1 7911 Bridge Reach-1 7869 100-year 1790.00 2349.75 2356.14 2356.06 2357.29 0.009652 10.15 248.12 183.09 0.72 Reach-1 7869 100-FW 1790.00 2349.75 2356.25 2356.07 2357.33 0.008904 9.86 257.14 84.20 0.69 Reach-1 7661 100-year 1790.00 2347.55 2354.38 2353.15 2355.51 0.007413 9.52 299.78 188.19 0.66 Reach-1 7661 100-FW 1790.00 2347.55 2354.35 2353.74 2355.56 0.007746 9.71 258.49 110.00 0.68 Reach-1 7410 100-year 1790.00 2346.07 2353.89 2352.05 2354.09 0.001657 4.35 588.05 308.34 0.31 Reach-1 7410 100-FW 1790.00 2346.07 2353.83 2352.05 2354.06 0.001809 4.52 554.53 179.00 0.33 Reach-1 7342 100-year 1790.00 2344.50 2353.81 2351.61 2353.98 0.001120 4.31 621.29 351.39 0.26 Reach-1 7342 100-FW 1790.00 2344.50 2353.76 2351.62 2353.93 0.001207 4.46 614.01 140.00 0.27 Reach-1 7286 Bridge Reach-1 7240 100-year 1790.00 2344.34 2350.89 2350.89 2351.85 0.009504 9.76 285.81 217.76 0.70 Reach-1 7240 100-FW 1790.00 2344.34 2351.78 2350.90 2352.23 0.003987 6.94 393.06 120.00 0.47 Reach-1 6965 100-year 1790.00 2342.32 2348.44 2348.44 2349.06 0.009304 9.06 401.86 273.55 0.66 Reach-1 6965 100-FW 1790.00 2342.32 2349.02 2350.33 0.012174 11.03 218.85 58.00 0.76 Reach-1 6587 100-year 1790.00 2339.19 2346.17 2346.39 0.002283 5.02 632.54 301.93 0.36 Reach-1 6587 100-FW 1790.00 2339.19 2347.06 2347.34 0.002000 5.15 475.34 113.63 0.35 Reach-1 6307 100-year 1790.00 2334.50 2345.87 2343.08 2345.92 0.000462 2.75 1169.77 382.91 0.15 Reach-1 6307 100-FW 1790.00 2334.50 2346.62 2343.45 2346.86 0.001279 4.80 511.68 85.00 0.25 Reach-1 6256 Bridge Reach-1 6216 100-year 1790.00 2334.25 2342.49 2341.96 2342.85 0.003716 6.15 474.86 215.34 0.43 Reach-1 6216 100-FW 1790.00 2334.25 2343.36 2342.02 2344.15 0.005159 7.90 281.68 60.00 0.52 Reach-1 5993 100-year 1790.00 2333.62 2341.89 2342.13 0.002181 5.15 558.81 198.53 0.34 Reach-1 5993 100-FW 1790.00 2333.62 2342.82 2343.11 0.001897 5.22 458.14 91.64 0.33 Reach-1 5785 100-year 1790.00 2332.50 2341.68 2339.44 2341.75 0.000701 3.00 939.02 263.53 0.18 Reach-1 5785 100-FW 1790.00 2332.50 2342.55 2339.43 2342.73 0.001251 4.28 597.13 101.00 0.24 Reach-1 5754 Culvert HEC-RAS Plan: Pr Cond River: Garren Creek Reach: Reach-1 (Continued) Reach River Sta Profile Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Val Chnl Flow Area Top Width Froude # Chl (cfs) (ft) (ft) (ft) (ft) (ft/ft) (fus) (sq ft) (ft) Reach-1 5721 100-year 1790.00 2332.42 2338.01 2338.01 2338.48 0.006806 7.51 385.47 181.96 0.59 Reach-1 5721 100-FW 1790.00 2332.42 2338.31 2338.01 2338.95 0.007008 7.92 305.33 90.00 0.60 Reach-1 5469 100-year 1790.00 2329.52 2335.45 2335.23 2335.96 0.009215 7.30 375.73 212.03 0.60 Reach-1 5469 100-FW 1790.00 2329.52 2336.17 2335.50 2336.92 0.009069 7.99 277.55 81.32 0.61 Reach-1 4758 100-year 1790.00 2323.05 2332.10 2329.81 2332.21 0.000997 3.40 835.30 305.61 0.22 Reach-1 4758 100-FW 1790.00 2323.05 2333.08 2329.70 2333.20 0.000857 3.41 658.05 117.01 0.21 Reach-1 4555 100-year 1790.00 2322.00 2331.94 2328.89 2332.02 0.000706 3.09 905.75 246.44 0.18 Reach-1 4555 100-FW 1790.00 2322.00 2332.82 2328.89 2333.00 0.001104 4.09 563.08 95.00 0.22 Reach-1 4499 Bridge Reach-1 4462 100-year 1790.00 2321.75 2327.92 2327.92 2328.63 0.007242 8.46 386.05 250.17 0.63 Reach-1 4462 100-FW 1790.00 2321.75 2328.27 2327.95 2329.17 0.007372 8.89 283.70 95.00 0.64 Reach-1 4227 100-year 1790.00 2319.67 2325.59 2325.59 2326.19 0.007455 7.70 416.25 308.05 0.63 Reach-1 4227 100-FW 1790.00 2319.67 2325.99 2325.88 2327.12 0.009880 9.35 248.22 93.66 0.73 Reach-1 3783 100-year 1790.00 2315.90 2322.99 2323.24 0.003170 5.02 546.48 240.98 0.38 Reach-1 3783 100-FW 1790.00 2315.90 2323.35 2323.77 0.004257 6.06 396.54 125.66 0.44 Reach-1 3328 100-year 1790.00 2313.20 2319.86 2319.86 2320.91 0.011249 9.65 271.27 185.28 0.70 Reach-1 3328 100-FW 1790.00 2313.20 2320.07 2319.75 2321.03 0.009674 9.15 264.15 85.00 0.65 Reach-1 3002 100-year 1790.00 2311.08 2317.70 2317.93 0.003658 5.44 596.31 293.89 0.39 Reach-1 3002 100-FW 1790.00 2311.08 2318.19 2318.55 0.004468 6.33 420.84 126.42 0.43 Reach-1 2604 100-year 1790.00 2307.33 2314.83 2313.57 2315.91 0.007219 8.91 292.09 126.85 0.62 Reach-1 2604 100-FW 1790.00 2307.33 2315.63 2316.57 0.005225 8.19 261.89 46.60 0.53 Reach-1 2187 100-year 1790.00 2304.10 2311.96 2311.70 2312.66 0.007855 8.21 440.69 239.55 0.56 Reach-1 2187 100-FW 1790.00 2304.10 2312.20 2311.36 2313.54 0.011399 10.12 234.56 50.10 0.67 Reach-1 1953 100-year 1790.00 2301.40 2308.61 2308.12 2310.22 0.013826 11.30 250.32 156.79 0.82 Reach-1 1953 100-FW 1790.00 2301.40 2309.34 2310.92 0.010805 10.79 211.99 38.00 0.73 Reach-1 1735 100-year 1790.00 2301.64 2306.59 2306.38 2307.19 0.011305 7.77 343.18 197.94 0.69 Reach-1 1735 100-FW 1790.00 2301.64 2307.00 2306.84 2308.07 0.014545 9.42 244.75 88.78 0.79 Reach-1 1479 100-year 1790.00 2298.00 2304.96 2305.22 0.003265 5.67 549.21 248.68 0.41 Reach-1 1479 100-FW 1790.00 2298.00 2305.03 2305.45 0.004385 6.62 411.01 140.05 0.47 Reach-1 1409 100-year 1790.00 2298.55 2304.77 2304.98 0.003048 5.26 587.98 267.92 0.39 Reach-1 1409 100-FW 1790.00 2298.55 2304.80 2305.13 0.003941 6.00 447.86 154.00 0.45 Reach-1 1163 100-year 1790.00 2295.31 2304.36 2304.47 0.000900 3.54 867.44 283.72 0.23 Reach-1 1163 100-FW 1790.00 2295.31 2304.37 2304.47 0.000871 3.49 866.30 271.19 0.22 Reach-1 1113 100-year 1790.00 2294.73 2304.35 2304.41 0.000717 2.90 1072.49 380.38 0.18 Reach-1 1113 100-FW 1790.00 2294.73 2304.35 2304.42 0.000799 3.06 951.08 295.00 0.19 Reach-1 966 100-year 1820.00 2293.98 2304.14 2300.81 2304.28 0.000831 3.67 670.44 412.14 0.22 Reach-1 966 100-FW 1820.00 2293.98 2304.14 2300.81 2304.28 0.000891 3.80 669.89 118.00 0.22 Reach-1 911 Bridge Reach-1 872 100-year 1820.00 2293.99 2300.23 2300.21 2300.78 0.007029 7.09 427.15 316.18 0.60 Reach-1 872 100-FW 1820.00 2293.99 2301.19 2300.27 2301.93 0.005756 7.33 296.96 85.00 0.56 Reach-1 573 100-year 1820.00 2292.81 2297.92 2298.31 0.009296 6.82 484.06 415.74 0.61 Reach-1 573 100-FW 1820.00 2292.81 2298.66 2299.56 0.011801 8.64 268.09 96.80 0.71 Reach-1 357 100-year 1820.00 2291.07 2296.11 2295.78 2296.41 0.008002 5.88 527.18 366.48 0.56 Reach-1 357 100-FW 1820.00 2291.07 2296.81 2296.07 2297.30 0.008001 6.65 398.96 141.19 0.58 2430 2420 2410 c 2400 a� w 2390 2380 2370 4200 2405 2400 2395 2390 c 0 a� w 2385 2380 2375 2370 4200 Garren Creek LDS - Rankin Plan: 1) Pr Cond 2) Ex Cond RS = 10198 Garren Creek XS47 Legend WS 100-year- Ex Cond WS 100-year- PrCond Ground - Ex Cond • Bank Sta - Ex Cond Ground - Pr Cond • Bank Sta - Pr Cond 4400 4600 4800 5000 5200 5400 5600 Station (ft) Garren Creek LDS - Rankin Plan: 1) Pr Cond 2) Ex Cond RS = 9988 Garren Creek XS46 4400 4600 4800 Station (ft) Legend WS 100-year- Ex Cond WS 100-year - Pr Cond Ground - Ex Cond Ineff - Ex Cond • Bank Sta - Ex Cond Ground - Pr Cond Ineff - Pr Cond • Bank Sta - Pr Cond 5000 5200 5400 2405 2400 2395 2390 c 0 a� w 2385 2380 2375 2370 4200 2405 2400 2395 2390 c 0 a� w 2385 2380 2375 Garren Creek LDS - Rankin Plan: 1) Pr Cond 2) Ex Cond RS = 9951 BR Garren_Creek_XS44Structure ID: Bleeker Ln.Approximate Survey S Legend WS 100-year- Ex Cond WS 100-year - Pr Cond Ex Cond Ground - Ex Cond Ineff - Ex Cond • Bank Sta - Ex Cond Pr Cond Ground - Pr Cond Ineff - Pr Cond • Bank Sta - Pr Cond 4400 4600 4800 5000 5200 5400 Station (ft) Garren Creek LDS - Rankin Plan: 1) Pr Cond 2) Ex Cond RS = 9889 Garren Creek XS45 Legend WS 100-year- Ex Cond WS 100-year - Pr Cond Ground - Ex Cond Ineff - Ex Cond • Bank Sta - Ex Cond Ground - Pr Cond Ineff - Pr Cond • Bank Sta - Pr Cond 23701 T T T T 4200 4400 4600 4800 5000 5200 Station (ft) 2410 2400 2390 c 0 .5 a� w 2380 2370 2360 4200 2410 2400 2390 c 0 .5 a� w 2380 2370 2360 4600 4700 4800 Garren Creek LDS - Rankin Plan: 1) Pr Cond RS = 9596 Garren Creek XS48 4400 4600 4800 5000 5200 Station (ft) Garren Creek LDS - Rankin Plan: 1) Pr Cond RS = 9170 Garren Creek XS43 2) Ex Cond Legend WS 100-year- Ex Cond WS 100-year- PrCond Ground - Ex Cond • Bank Sta - Ex Cond Ground - Pr Cond • Bank Sta - Pr Cond 5400 2) Ex Cond 4900 5000 5100 5200 Station (ft) Legend WS 100-year- Ex Cond WS 100-year - Pr Cond Ground - Ex Cond • Bank Sta - Ex Cond Ground - Pr Cond • Bank Sta - Pr Cond 5300 2410 2400 2390 c 0 .5 a� w 2380 2370 2360 4600 2395 2390 2385 2380 c 2375 a� w 2370 2365 2360 2355 4700 Garren Creek LDS - Rankin Plan: 1) Pr Cond 2) Ex Cond RS = 8868 Garren Creek XS41 Legend WS 100-year- Ex Cond WS 100-year- PrCond Ground - Ex Cond • Bank Sta - Ex Cond Ground - Pr Cond • Bank Sta - Pr Cond 4700 4800 4900 5000 5100 5200 Station (ft) Garren Creek LDS - Rankin Plan: 1) Pr Cond 2) Ex Cond RS = 8678 Garren Creek XS39 Legend WS 100-year- Ex Cond WS 100-year - Pr Cond - Ex Cond Ground - Ex Cond Ineff - Ex Cond • Bank Sta - Ex Cond - Pr Cond Ground - Pr Cond Ineff - Pr Cond • Bank Sta - Pr Cond 4800 4900 5000 5100 5200 5300 5400 Station (ft) 2395 2390 2385 2380 c .P 2375 a� w 2370 2365 2360 2355 4700 2390 2385 2380 2375 c 0 a� w 2370 2365 2360 Garren Creek LDS - Rankin Plan: 1) Pr Cond 2) Ex Cond RS = 8634 BR Garren_Creek_XS38Structure ID: Owenby Ridge Rd. Approximate Su Legend WS 100-year- Ex Cond WS 100-year - Pr Cond Ex Cond Ex Cond Ground - Ex Cond Ineff - Ex Cond • Bank Sta - Ex Cond Pr Cond Pr Cond Ground - Pr Cond Ineff - Pr Cond • Bank Sta - Pr Cond 4800 4900 5000 5100 5200 5300 5400 Station (ft) Garren Creek LDS - Rankin Plan: 1) Pr Cond 2) Ex Cond RS = 8578 Garren Creek XS40 Legend WS 100-year- Ex Cond WS 100-year - Pr Cond Ground - Ex Cond Ineff - Ex Cond • Bank Sta - Ex Cond Ground - Pr Cond Ineff - Pr Cond • Bank Sta - Pr Cond 2355 1 1 4700 4800 4900 5000 5100 5200 5300 5400 5500 Station (ft) 2385 2380 2375 c 2370 a� w 2365 2360 2355 4600 2385 2380 2375 2370 c 0 a� w 2365 2360 2355 2350 4600 Garren Creek LDS - Rankin Plan: 1) Pr Cond 2) Ex Cond RS = 8336 Garren Creek XS42 Legend WS 100-year - Ex Cond WS 100-year - Pr Cond Ground - Ex Cond • Bank Sta - Ex Cond Ground - Pr Cond • Bank Sta - Pr Cond 4700 4800 4900 5000 5100 5200 5300 Station (ft) Garren Creek LDS - Rankin Plan: 1) Pr Cond 2) Ex Cond RS = 8032 Garren Creek XS36 Legend WS 100-year - Ex Cond WS 100-year - Pr Cond - Ex Cond Ground - Ex Cond • Bank Sta - Ex Cond - Pr Cond Ground - Pr Cond • Bank Sta - Pr Cond 4700 4800 4900 5000 5100 5200 5300 Station (ft) 2400 2390 2380 c 0 .5 a>i w 2370 2360 2350 4600 2400 2390 2380 c 0 .5 a� w 2370 2360 2350 4600 4700 4800 Garren Creek LDS - Rankin Plan: 1) Pr Cond RS = 7955 Garren Creek XS35 2) Ex Cond Legend WS 100-year- Ex Cond WS 100-year- PrCond Ground - Ex Cond Ineff - Ex Cond • Bank Sta - Ex Cond Ground - Pr Cond Ineff - Pr Cond • Bank Sta - Pr Cond 4700 4800 4900 5000 5100 5200 5300 Station (ft) Garren Creek LDS - Rankin Plan: 1) Pr Cond 2) Ex Cond RS = 7911 BR Garren_Creek_XS33Structure ID: Kirstein Rd. SR-2832Approximate 4900 5000 5100 5200 Station (ft) Legend WS 100-year- Ex Cond WS 100-year- PrCond Ex Cond Ex Cond Ground - Ex Cond Ineff - Ex Cond • Bank Sta - Ex Cond Pr Cond Pr Cond Ground - Pr Cond Ineff - Pr Cond • Bank Sta - Pr Cond 5300 Garren Creek LDS - Rankin Plan: 1) Pr Cond 2) Ex Cond RS = 7869 Garren Creek XS34 2385 2380 2375 2370 c .P 2365 aa) w 2360 2355 2350 2345 4600 4700 4800 4900 5000 5100 5200 5300 5400 Station (ft) Garren Creek LDS - Rankin Plan: 1) Pr Cond 2) Ex Cond RS = 7661 Garren Creek XS37 2385 2380 2375 2370 c 2365 w 2360 2355 2350 2345 4700 4800 4900 5000 5100 5200 5300 Station (ft) Legend WS 100-year- Ex Cond WS 100-year- PrCond - Ex Cond Ground - Ex Cond Ineff - Ex Cond • Bank Sta - Ex Cond - Pr Cond Ground - Pr Cond Ineff - Pr Cond • Bank Sta - Pr Cond Legend WS 100-year- Ex Cond WS 100-year - Pr Cond Ground - Ex Cond • Bank Sta - Ex Cond Ground - Pr Cond • Bank Sta - Pr Cond Garren Creek LDS - Rankin Plan: 1) Pr Cond 2) Ex Cond RS = 7410 Garren Creek XS31 2385 2380 2375 2370 c .P 2365 aa) w 2360 2355 2350 2345 4600 4700 4800 4900 5000 5100 5200 5300 5400 Station (ft) Garren Creek LDS - Rankin Plan: 1) Pr Cond 2) Ex Cond RS = 7342 Garren Creek XS30 2390 2380 2370 0 > ai 2360 2350 2340 4600 4700 4800 4900 5000 5100 5200 5300 5400 Station (ft) Legend WS 100-year- Ex Cond WS 100-year- PrCond - Ex Cond - Ex Cond Ground - Ex Cond Ineff - Ex Cond • Bank Sta - Ex Cond - Pr Cond - Pr Cond Ground - Pr Cond Ineff - Pr Cond • Bank Sta - Pr Cond Legend WS 100-year- Ex Cond WS 100-year- PrCond - Ex Cond Ground - Ex Cond Ineff - Ex Cond • Bank Sta - Ex Cond - Pr Cond Ground - Pr Cond Garren Creek LDS - Rankin Plan: 1) Pr Cond 2) Ex Cond RS = 7286 BR Garren Creek XS28Structure ID: Private Dr. off of Garren Creek 2390 2380 2370 0 15 a>i w 2360 2350 2340 4600 4700 4800 4900 5000 5100 5200 5300 5400 Station (ft) Garren Creek LDS - Rankin Plan: 1) Pr Cond 2) Ex Cond RS = 7240 Garren Creek XS29 2380 2375 2370 2365 c 2360 > ai w 2355 2350 2345 2340 4600 4700 4800 4900 5000 5100 5200 5300 5400 Station (ft) Legend WS 100-year- Ex Cond WS 100-year- PrCond - Ex Cond - Ex Cond Ground - Ex Cond Ineff - Ex Cond • Bank Sta - Ex Cond - Pr Cond - Pr Cond Ground - Pr Cond Ineff - Pr Cond • Bank Sta - Pr Cond Legend WS 100-year- Ex Cond WS 100-year- PrCond - Ex Cond Ground - Ex Cond Ineff - Ex Cond • Bank Sta - Ex Cond - Pr Cond Ground - Pr Cond Ineff - Pr Cond • Bank Sta - Pr Cond 2380 2375 2370 2365 c .P 2360 a� w 2355 2350 2345 2340 4600 2410 2400 2390 2380 c 2370 a� w 2360 2350 2340 Garren Creek LDS - Rankin Plan: 1) Pr Cond 2) Ex Cond RS = 6965 Garren Creek XS32 Legend WS 100-year- Ex Cond WS 100-year- PrCond Ground - Ex Cond • Bank Sta - Ex Cond Ground - Pr Cond • Bank Sta - Pr Cond 4700 4800 4900 5000 5100 5200 5300 Station (ft) Garren Creek LDS - Rankin Plan: 1) Pr Cond 2) Ex Cond RS = 6587 Garren Creek XS27 Legend WS 100-year- Ex Cond WS 100-year - Pr Cond Ground - Ex Cond • Bank Sta - Ex Cond Ground - Pr Cond • Bank Sta - Pr Cond 2330 1 1 4600 4700 4800 4900 5000 5100 5200 5300 5400 Station (ft) 2365 2360 2355 2350 c 0 a� w 2345 2340 2335 Garren Creek LDS - Rankin Plan: 1) Pr Cond 2) Ex Cond RS = 6307 Garren Creek XS24 Legend WS 100-year- Ex Cond WS 100-year- PrCond - Ex Cond Ground - Ex Cond Ineff - Ex Cond • Bank Sta - Ex Cond - Pr Cond Ground - Pr Cond Ineff - Pr Cond • Bank Sta - Pr Cond 2330 4700 4800 4900 5000 5100 5200 5300 5400 Station (ft) Garren Creek LDS - Rankin Plan: 1) Pr Cond 2) Ex Cond RS = 6256 BR Garren_Creek_XS22Structure ID: Buckner WayApproximate Survey S 2370 2365 2360 2355 c .P 2350 a� w 2345 2340 2335 Legend WS 100-year- Ex Cond WS 100-year- PrCond Ex Cond Ex Cond Ground - Ex Cond Ineff - Ex Cond • Bank Sta - Ex Cond Pr Cond Pr Cond Ground - Pr Cond Ineff - Pr Cond • Bank Sta - Pr Cond 2330 4700 4800 4900 5000 5100 5200 5300 5400 Station (ft) 2380 2370 2360 c 0 .5 a>i w 2350 2340 2330 4700 2390 2380 2370 c 2360 a� w 2350 2340 2330 4700 Garren Creek LDS - Rankin Plan: 1) Pr Cond 2) Ex Cond RS = 6216 Garren Creek XS23 Legend WS 100-year- Ex Cond WS 100-year- PrCond Ground - Ex Cond Ineff - Ex Cond • Bank Sta - Ex Cond Ground - Pr Cond Ineff - Pr Cond • Bank Sta - Pr Cond 4800 4900 5000 5100 5200 5300 5400 Station (ft) Garren Creek LDS - Rankin Plan: 1) Pr Cond 2) Ex Cond RS = 5993 Garren Creek XS26 4800 4900 5000 Station (ft) Legend WS 100-year- Ex Cond WS 100-year - Pr Cond Ground - Ex Cond • Bank Sta - Ex Cond Ground - Pr Cond • Bank Sta - Pr Cond 5100 5200 5300 2380 2370 2360 c 0 .5 a>i w 2350 2340 2330+-- 4700 2380 2370 2360 c 0 .5 a� W 2350 2340 2330 4700 4800 4900 Garren Creek LDS - Rankin Plan: 1) Pr Cond RS = 5785 Garren Creek XS19 2) Ex Cond Legend WS 100-year- Ex Cond WS 100-year- PrCond Ground - Ex Cond Ineff - Ex Cond • Bank Sta - Ex Cond Ground - Pr Cond Ineff - Pr Cond • Bank Sta - Pr Cond 4800 4900 5000 5100 5200 5300 5400 Station (ft) Garren Creek LDS - Rankin Plan: 1) Pr Cond 2) Ex Cond RS = 5754 Culy Garren_Creek_XS17Structure ID: Whittaker Ln. Approximate Surve 5000 5100 5200 5300 Station (ft) Legend WS 100-year - Ex Cond WS 100-year - Pr Cond Ex Cond Ex Cond Ground - Ex Cond Ineff - Ex Cond • Bank Sta - Ex Cond Pr Cond Pr Cond Ground - Pr Cond Ineff - Pr Cond Bank Sta! Pr Cond 5400 2380 2370 2360 c 0 .5 a>i w 2350 2340 2330 4700 2400 2390 2380 2370 c 2360 a� w 2350 2340 2330 2320 4700 Garren Creek LDS - Rankin Plan: 1) Pr Cond 2) Ex Cond RS = 5721 Garren Creek XS18 Legend WS 100-year- Ex Cond WS 100-year- PrCond Ground - Ex Cond Ineff - Ex Cond • Bank Sta - Ex Cond Ground - Pr Cond Ineff - Pr Cond • Bank Sta - Pr Cond 4800 4900 5000 5100 5200 5300 5400 Station (ft) Garren Creek LDS - Rankin Plan: 1) Pr Cond 2) Ex Cond RS = 5469 Garren Creek XS21 4800 4900 5000 Station (ft) Legend WS 100-year- Ex Cond WS 100-year - Pr Cond Ground - Ex Cond • Bank Sta - Ex Cond Ground - Pr Cond • Bank Sta - Pr Cond 5100 5200 5300 2390 2380 2370 2360 c 0 a� w 2350 2340 2330 2320 4600 2380 2370 2360 c .P 2350 a� w 2340 2330 2320 4400 Garren Creek LDS - Rankin Plan: 1) Pr Cond 2) Ex Cond RS = 4758 Garren Creek XS15 Legend WS 100-year- Ex Cond WS 100-year- PrCond - Ex Cond - Ex Cond Ground - Ex Cond Ineff - Ex Cond • Bank Sta - Ex Cond - Pr Cond - Pr Cond Ground - Pr Cond Ineff - Pr Cond • Bank Sta - Pr Cond 4800 5000 5200 5400 5600 Station (ft) Garren Creek LDS - Rankin Plan: 1) Pr Cond 2) Ex Cond RS = 4555 Garren Creek XS14 Legend WS 100-year- Ex Cond WS 100-year - Pr Cond Ground - Ex Cond Ineff - Ex Cond • Bank Sta - Ex Cond Ground - Pr Cond Ineff - Pr Cond • Bank Sta - Pr Cond 4600 4800 5000 5200 5400 5600 5800 Station (ft) 2380 2370 2360 c .� 2350 a� w 2340 2330 2320 4400 2380 2370 2360 c .� 2350 a� w 2340 2330 Garren Creek LDS - Rankin Plan: 1) Pr Cond 2) Ex Cond RS = 4499 BR Garren_Creek_XS12Structure ID: Whitaker Rd. SR-2820Approximate Legend WS 100-year- Ex Cond a WS 100-year - Pr Cond Ex Cond Ex Cond Ex Cond Ground !Ex Cond Ineff - Ex Cond • Bank Sta - Ex Cond Pr Cond Pr Cond Pr Cond Ground - Pr Cond Ineff - Pr Cond • Bank Sta - Pr Cond 4600 4800 5000 5200 5400 5600 5800 Station (ft) Garren Creek LDS - Rankin Plan: 1) Pr Cond 2) Ex Cond RS = 4462 Garren Creek XS13 Legend WS 100-year- Ex Cond WS 100-year - Pr Cond Ground - Ex Cond Ineff - Ex Cond • Bank Sta - Ex Cond Ground - Pr Cond Ineff - Pr Cond • Bank Sta - Pr Cond 2320 1 1 4200 4400 4600 4800 5000 5200 5400 5600 5800 Station (ft) Garren Creek LDS - Rankin Plan: 1) Pr Cond 2) Ex Cond RS = 4227 Garren Creek XS16 2420 2400 2380 c .P 2360 aa) w 2340 2320 2300 4400 4600 4800 5000 5200 5400 5600 Station (ft) Garren Creek LDS - Rankin Plan: 1) Pr Cond 2) Ex Cond RS = 3783 garren crk b 2480 2460 2440 2420 0 2380 w 2360 2340 2320 2300 4400 4600 4800 5000 5200 5400 5600 Station (ft) Legend WS 100-year- Ex Cond WS 100-year - Pr Cond - Ex Cond Ground - Ex Cond Bank Sta - Ex Cond - Pr Cond Ground - Pr Cond • Bank Sta - Pr Cond Legend WS 100-year- Ex Cond WS 100-year - Pr Cond Ground - Ex Cond • Bank Sta - Ex Cond Ground - Pr Cond • Bank Sta - Pr Cond 2400 2380 2360 c 0 .5 a� w 2340 2320 2300+-- 4400 2360 2350 2340 c 0 .5 a� w 2330 2320 2310-�-- 4400 Garren Creek LDS - Rankin Plan: 1) Pr Cond 2) Ex Cond RS = 3328 Garren Creek XS11 Legend WS 100-year- Ex Cond WS 100-year- PrCond - Ex Cond Ground - Ex Cond Ineff - Ex Cond • Bank Sta - Ex Cond - Pr Cond Ground - Pr Cond Ineff - Pr Cond • Bank Sta - Pr Cond 4600 4800 5000 5200 5400 5600 Station (ft) Garren Creek LDS - Rankin Plan: 1) Pr Cond 2) Ex Cond RS = 3002 Garren Creek XS10 4600 4800 5000 5200 5400 Station (ft) Legend WS 100-year- PrCond WS 100-year - Ex Cond Ground - Ex Cond • Bank Sta - Ex Cond Ground - Pr Cond • Bank Sta - Pr Cond 5600 Garren Creek LDS - Rankin Plan: 1) Pr Cond 2) Ex Cond RS = 2604 Garren Creek XS9 2350 2340 2330 0 w 2320 2310 2300 4900 4950 5000 5050 5100 5150 5200 5250 5300 Station (ft) Garren Creek LDS - Rankin Plan: 1) Pr Cond 2) Ex Cond RS = 2187 Garren Creek XS8 2360 2350 2340 c .P 2330 wA. 2320 2310 2300 4800 4900 5000 5100 5200 5300 5400 5500 Station (ft) Legend WS 100-year- Ex Cond WS 100-year- PrCond Ground - Ex Cond • Bank Sta - Ex Cond Ground - Pr Cond • Bank Sta - Pr Cond Legend WS 100-year- Ex Cond WS 100-year- PrCond - Ex Cond Ground - Ex Cond Ineff - Ex Cond • Bank Sta - Ex Cond - Pr Cond Ground - Pr Cond Ineff - Pr Cond • Bank Sta - Pr Cond fAyli 2320 2315 c 0 .5 a� w 2310 2305 2300-�-- -150 2360 2350 2340 c .P 2330 a� w 2320 2310 2300 4600 Garren Creek LDS - Rankin Plan: 1) Pr Cond 2) Ex Cond RS = 1953 Add XSC Legend WS 100-year- Ex Cond WS 100-year- PrCond Ground - Ex Cond • Bank Sta - Ex Cond Ground - Pr Cond • Bank Sta - Pr Cond -100 -50 0 50 100 150 200 250 Station (ft) Garren Creek LDS - Rankin Plan: 1) Pr Cond 2) Ex Cond RS = 1735 Garren Creek XS7 4800 5000 5200 Station (ft) Legend WS 100-year- Ex Cond WS 100-year - Pr Cond Ground - Ex Cond • Bank Sta - Ex Cond Ground - Pr Cond • Bank Sta - Pr Cond 5400 5600 5800 2312 2310 2308 2306 c 0 a� w 2304 2302 2300 2298 -200 2380 2360 2340 c 0 .5 a� w 2320 2300 2280-�-- 4600 Garren Creek LDS - Rankin Plan: 1) Pr Cond 2) Ex Cond RS = 1479 Added XSC Legend WS 100-year- Ex Cond WS 100-year- PrCond Ground - Ex Cond • Bank Sta - Ex Cond Ground - Pr Cond • Bank Sta - Pr Cond -150 -100 -50 0 50 100 150 200 Station (ft) Garren Creek LDS - Rankin Plan: 1) Pr Cond 2) Ex Cond RS = 1409 garren crk a Legend WS 100-year- Ex Cond WS 100-year - Pr Cond Ground - Ex Cond • Bank Sta - Ex Cond Ground - Pr Cond • Bank Sta - Pr Cond 4800 5000 5200 5400 5600 Station (ft) Garren Creek LDS - Rankin Plan: 1) Pr Cond 2) Ex Cond RS = 1163 Added XSC 2312 2310 2308 2306 0 w 2300 2298 2296 2294 -150 -100 -50 0 50 100 150 200 Station (ft) Garren Creek LDS - Rankin Plan: 1) Pr Cond 2) Ex Cond RS = 1113 Garren Creek XS5 2360 2350 2340 2330 0 w 2320 2310 2300 2290 4600 4800 5000 5200 5400 5600 Station (ft) Legend WS 100-year- Ex Cond WS 100-year- Pr Cond Ground - Ex Cond • Bank Sta - Ex Cond Ground - Pr Cond • Bank Sta - Pr Cond Legend WS 100-year- Ex Cond WS 100-year - Pr Cond Ground - Ex Cond • Bank Sta - Ex Cond Ground - Pr Cond • Bank Sta - Pr Cond Garren Creek LDS - Rankin Plan: 1) Pr Cond 2) Ex Cond RS = 966 Garren Creek XS4 2370 2360 2350 2340 c .P 2330 aa) w 2320 2310 2300 2290 4400 4600 4800 5000 5200 5400 5600 5800 6000 Station (ft) Garren Creek LDS - Rankin Plan: 1) Pr Cond 2) Ex Cond RS = 911 BR Garren_Creek_XS2Structure ID: Church Rd. SR-2816Approximate Su 2370 2360 2350 2340 c .P 2330 aa) w 2320 2310 2300 4400 4600 4800 5000 5200 5400 5600 5800 6000 Station (ft) Legend WS 100-year- Ex Cond WS 100-year- PrCond - Ex Cond - Ex Cond Ground - Ex Cond Ineff - Ex Cond • Bank Sta - Ex Cond - Pr Cond - Pr Cond Ground - Pr Cond Ineff - Pr Cond • Bank Sta - Pr Cond Legend WS 100-year- Ex Cond WS 100-year- PrCond - Ex Cond - Ex Cond - Ex Cond Ground - Ex Cond Ineff - Ex Cond • Bank Sta - Ex Cond - Pr Cond - Pr Cond - Pr Cond Ground - Pr Cond Ineff - Pr Cond • Bank Sta - Pr Cond 2370 2360 2350 2340 c .P 2330 a� w 2320 2310 2300 2290 4400 2420 2400 2380 2360 c 0 .5 a� w 2340 2320 2300 Garren Creek LDS - Rankin Plan: 1) Pr Cond 2) Ex Cond RS = 872 Garren Creek XS3 Legend WS 100-year- Ex Cond WS 100-year- PrCond Ground - Ex Cond Ineff - Ex Cond • Bank Sta - Ex Cond Ground - Pr Cond Ineff - Pr Cond • Bank Sta - Pr Cond 4600 4800 5000 5200 5400 5600 5800 Station (ft) Garren Creek LDS - Rankin Plan: 1) Pr Cond 2) Ex Cond RS = 573 Garren Creek XS6 Legend WS 100-year- Ex Cond WS 100-year - Pr Cond Ground - Ex Cond • Bank Sta - Ex Cond Ground - Pr Cond • Bank Sta - Pr Cond 2280 1 1�������� 4600 4800 5000 5200 5400 5600 5800 6000 6200 6400 Station (ft) Garren Creek LDS - Rankin Plan: 1) Pr Cond 2) Ex Cond RS = 357 Garren Creek XS1 2400 2380 2360 c 2340 w 2320 2300 2280 4500 5000 5500 6000 6500 Station (ft) Legend WS 100-year- Ex Cond WS 100-year- PrCond Ground - Ex Cond • Bank Sta - Ex Cond Ground - Pr Cond • Bank Sta - Pr Cond /_1:2 :2 =1 L, I Q PA C CONSTRUCTION PLANS 4 C: 0 m m m Om n m 4-1 U) m C) a) L- _r_ m < -0 — m 0 E z M= .0 4--1 a) 0 4--1 " 4-0 U) 0 co co U") -2 a ) -2 m -0 -m C: E 0 m C: 42, 0 m (/) 0 4--1 C/) C: 4--1 M m CL c 0 L)4-0 0 4-0 m L) 0 o - 06 C: C) jr; z LLj C: n -0 �7- 0 z 0 C) CN CIO M-1 co 0 LU 0 Of a_ a_ LU F 0 zzozi� ZZOd�S zzoz/s aa�os . P@Aoiddd saryo75 -� Paryaay� 9ea oaa of„o of Y,—N '1(1-3 ag--,S7 uoiFoz %�4aJ5 �Iuogcuoaa;5 Ma�� Ll[��� s3,YN 'doses aoinaas uoQenaasuo:) saoanosad Iean�eN I a' o `o aanjjn�u6y ma jojuawaaedaa ZdOd�S a o 94aM %�aa>/ol5� Pau 6isaQ ���� u1�u�� H�CI^, Sa4eaS Paa!Ufl c ♦GSrI i�o in T ti' A A p 'O m m o o v ca ° ti ro y _c� o ca c 0 `o .ti 0 `m y C FloY� o C i � o m o G reeK o Gore o � � o � 0 a o by Ems° o� �o oa t w �'o a 0 O � oa o k` 40 Cl� o O � o °oa \�y o 3C� � o k ZZOZ/S ano�ddy uugo�u,� y/�o/y '.Ounog aq� ooung S92/N °YOSO aninaaS uol�enaasuo� uogo?L�9o1S �uogruoa�lg saoanosad jean4eN � pa�oay� zzoz/s sa,�o�s � UMo,a u0140as ssoaO puD aIiJoad ma zzozis 99aM �o aaan�lnala6y uawaaedaa Za oZ/S 99aM %/sal/o15 pau6isa4 U.la D _j U I� U D� sa7eis Paalun ♦asl l 0 3 in O N M o M o O 01 M O N O co N v N N N N N O O oo O O � 1 Oo lf] I o N a O 1 vJ W oo V O ° W av W� + W J/ \ o O v 0 ° c c ° O C +.21 0 a ' o I o I a C4 N � a N I ` Q U �d a W N CC O Q I\ O U a m o oo _ vi o o °oo oo O W � C !=� O pLO BOO .O OJQ } O C�.0 Lam^ O ° W O O O O O ^ o Ce] UCH No o] o] 30i1ry�°j° h O3°O ^Q * y ro * N M N r) N N N N N W v l v o W M O W N 41 arN oaa�