Loading...
HomeMy WebLinkAbout20230866 Ver 1_Sketch_20230619N 7 Lake (At Full Pend/ Normal Water Level) to C Eo N Side View LL- FORM: 55GP 09-2020 Page 5 of 6 b. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation c. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation d. Location of any proposed structures such as buildings, retaining walls, docks, etc. e. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation La ke (At Full Pond/ Normal Water Level) Full Pond/ Normal Water Level Q � Shoreline Plan View Lake (At Full Pond/ Normal Water Level) Existing Dock /30Rx 7f[ r �rr.rrrb rr. • «��trr�t� rr ff Full Pond/ Normal Water Level E AMP E Plan View t North Carolina Department of Environmental Quality I Division of Water Resources e��D—E 512 North Salisbury Street 1 1617 Mail Sensice Center I Raleigh, North Carolina 27699-1617 :a-..n,r�:�r�"r.,:ro!uxn�a!t3usfity 919.707.9000 ,