HomeMy WebLinkAbout20230866 Ver 1_Sketch_20230619N
7
Lake
(At Full Pend/ Normal Water Level)
to
C
Eo
N
Side View
LL-
FORM: 55GP 09-2020 Page 5 of 6
b. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation
c. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation
d. Location of any proposed structures such as buildings, retaining walls, docks, etc.
e. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation
La ke
(At Full Pond/ Normal Water Level)
Full Pond/ Normal Water Level Q �
Shoreline
Plan View
Lake
(At Full Pond/ Normal Water Level)
Existing Dock
/30Rx 7f[
r �rr.rrrb rr.
• «��trr�t�
rr
ff
Full Pond/ Normal Water Level
E AMP E
Plan View
t
North Carolina Department of Environmental Quality I Division of Water Resources
e��D—E 512 North Salisbury Street 1 1617 Mail Sensice Center I Raleigh, North Carolina 27699-1617
:a-..n,r�:�r�"r.,:ro!uxn�a!t3usfity 919.707.9000 ,