HomeMy WebLinkAboutSW4220301_Email_20220524
Peck, Kaitlin
From:Farkas, Jim J
Sent:Tuesday, May 24, 2022 12:11 PM
To:'Ravindra Bissram'
Cc:'randy@dunstonproperties.com'; 'Randy Dunston'
Subject:RE: \[External\] Woodhaven Subdivision (SW4220301)
You can add those two new lots in now and revise the submission materials to reflect the additional BUA as part of the
resubmission.
-Jim
From: Ravindra Bissram <rbissram@feiconsulting.com>
Sent: Tuesday, May 24, 2022 11:33 AM
To: Farkas, Jim J <Jim.Farkas@ncdenr.gov>
Cc: randy@dunstonproperties.com; Randy Dunston <randydunston@gmail.com>
Subject: \[External\] Woodhaven Subdivision (SW4220301)
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
Report Spam.
Jim:
We are currently working on the revisions to the Woodhaven Subdivision Project per comments sent on May 12, 2022.
One question that the client and I discussed is the potential of converting the 2 common areas into buildable lots. During
rezoning, these two lots were initially planned, but based on a preliminary soils evaluation, it was determined to remove
the lots at that time. Since the submittal, Forsyth County has informed us that they will do an independent evaluation of
the soils to determine the suitability of a septic drain field. Thus, we would like to consider these two common areas as
lots until we are updated by the Health Department for feasibility.
Our preference would be to incorporate the two lots into this resubmittal instead of having a revision to the permit in
the future if it is deemed possible by Forsyth County that the two lots can be considered as buildable. As we are
addressing revisions, can we update the application to incorporate the two additional lots, or should it be modified as a
revision in the future (after approval)?
The attached site plan indicates the two Common Areas that are under consideration.
Thanks,
Rav
Website | Vcard | Map | Email
1
2