Loading...
HomeMy WebLinkAboutWQ0031317_Monitoring - 04-2023_20230616FORM NDMR 10-13 NON -DISCHARGE MONITORING REPORT (NDMR) Page 1 of Permit No. W00031317 Facility Name: Global Nuclear Fuel - Americas County: New Hanover Month: APRIL Year: 2023 PPI: 001 Flow Measuring Point. I3 lnnw ■ Eetwm ❑ Na now e-nd Parameter Monitoring Point: ❑ mnwnt N EM-M ❑ Gmundratw Lowerom ❑ Soo -wow Parameter Code --> 50050 31616 00310 00610 00530 00076 C0600 C0665 00630 00625 ❑ Ua 0 fl y. m� pEm h o U. LLo U ❑ m E E a 39 m ono t- �m to .0 r CM c o 0 ��u etc 0 o aV b � i x p �_ o 24-hr hrs GIRD Mf100 mL mWL mWL mWL NTU ma& mall mWL mWL 1 11904 397 2 11904 0.20 3 p6:00 8 11904 3.97 4 06:00 8 13340 <2 <2 1 <0.2 <2.5 3.97 102.0 11.8 102.0 <0.5 5 06:00 8 11549 0.18 6 06:00 a 11935 0.23 7 8311 0.23 8 8311 3.97 9 8311 3.97 10 06:00 8 8311 0.41 It 0600 8 8378 <2 <2 <0.2 <2.5 0.35 12 06:00 8 10538 397 13 06:00 8 1 9314 0.20 14 06:00 8 1 10496 0.20 15 10463 0.19 16 10463 3.97 17 06:00 8 10463 2.30 18 06100 8 11156 <2 <2 0.3 <2.5 165 19 06:00 8 10164 3.97 20 05:00 8 10038 3.72 21 WOO 6 14968 160 22 135M 1.51 23 13580 1.50 24 06:00 a 13580 281 25 06:00 8 9352 <1 <2 <0.2 <.5 3.97 26 06:00 8 11458 2.26 27 0600 8 10180 3.44 28 06:00 7 8728 1.55 29 1 10403 2.06 30 10403 1 40 Average: 10,783 1 0.0 0.1 0.0 2.1 102-0 11.8 102.0 0.0 Daily Maximum: 14.968 <2 <2 0.3 <2.5 3.97 102.0 11.8 102.0 <0.5 Daily Minimum: 8,311 c1 <2 <0.2 <2.5 0.18 102.0 11.8 102.0 <0.5 Sampling Type: Grab Grob Grab Grab Reorder Monthly Ava. Limit: 14 10 4 5 1 _ Daily Limit: 25 15 6 10 10 Sample Frequency: 1 Weeky Weekly Weekly Weekly Cont FORM: NDMR 10-13 NON -DISCHARGE MONITORING REPORT (NDMR) Page 2 of 2 Sampling Person(s) Certified Laboratories Vame. Mike Phipps Name: Environmental Chemists Vame Jeff Hollis Name: Global Nuclear Fuel -Americas Does all monitoring data and sampling frequencies meet the requirements in Attachment A of your permit? E-comoam soar,-Compant tf the facility is non -compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in yourexplanation the dale(s) of the non-compliance and describe the corrective action(s) taken Attach additional sheets if necessary Operator in Responsible Charge (ORC) Certification Permittee Certification ORC: Mike Phipps Permittee: 13yan Huth Certification No.: 986536 Signing Official: Ryan Huth Grade: WW II Phone Number. 910-617-9373 Signing Officlars Title: Wilmington Plant Mananer Phone Number. 828.232.84 0 Permit Expiration: 0913012029 _ Has ORC changed since the previous NDMR? � Yes � No _S-- C/ Date By this signature, I certify that this report Is accurate and complete to the best of my knowledge. Signature Date "1 certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that all qualified personnel property gathered and evaluated the information submitted. Baud on my Inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the Information, the Information submitted is, to tiro best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, Including the possibility of fines and Imprisonment for knowing violations' Mall Original and Two Copies to: Division of Water Resources Information Processing Unit 1617 Mail Service Center Raleigh, NC 27699-1617 wrlcn FORM. NDMR 10-13 NON -DISCHARGE MONITORING REPORT (NDMR) Page 2 of 2 Sampling Person(s) Certified Laboratories Name: Mike Phipps Name: Environmental Chemists Name: Jeff Hollis Name: Global Nuclear Fuel - Americas Dues all monitoring data and sampling frequencies meet the requirements in Attachment A of your permit? R1_ Compliant 11 Non-Comphant If the facility is non•complianl, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective aetion(s) taken. Attach additional sheets if necessary Operator In Responsible Charge (ORC) Certification Permittee Certification ORC: Mike Phipps Certification No.: 986536 Grade: IA W II Has ORC changed since the previous NDMR? Phone Number: 910.617.9373 Yes 0 No Signature Date By this signature, I certify that this report is accurate and complete to the best of my knowledge. Permittee: Ryan Huth Signing Official: Ryan Huth Signing Official's Title: Witmington Plant Manager Phone Number. 828-2324M60 Permit Expiration: 0813012029 L H Signature Data I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision In accordance with a system designed to assure that all qualified personnel property gathered and evaluated the Information submitted. Based on my Inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the Information, the Information submitted Is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of (Irma and imprisonment for knowing violations. Mail Original and Two Copies to: Division of Water Resources Information Processing Unit 1617 Mail Service Center Raleigh, INC 27699-1617 Monitoring Report Submittal Permit Number#* Name of Facility:* Month: * April WQ0031317 Global Nuclear Fuels - Americas Report Information Type * NDMR, NDAR-1, NDAR-2, NDMLR Confirmation Email Address: Name of Submitter: * Signature: Date of submittal: Initial Review Year:* 2023 Upload Document* April 23 ndmr gnfa (002).pdf 169.44KB PDF Only Please upload one PDF containing all applicable monitoring reports (i.e., NDMR, NDAR-1, NDAR-2, NDMLR, GW-59). andrew.reeside@ge.com Drew Reeside OMVIOW�14 Reviewer: Wanda.Gerald 6/16/2023 This will be filled in automatically Is the project number correct?* W00031317 Is the monitoring report accepted?* Yes NO Regional Office* Wilmington Reviewer: _anonymous Review Date: 6/16/2023