HomeMy WebLinkAboutSW1170501_Email_20230327
Peck, Kaitlin
From:Farkas, Jim J
Sent:Monday, March 27, 2023 1:41 PM
To:'Mark Brooks'
Cc:ehutchison@brooksea.com; clyda@hendersoncountync.gov; Darnell, Russell H; Smith,
Mike M
Subject:SW1170501; Acony Bell Community – Major Modification for Phase 3
Attachments:Cover Letter & Permit 3-27-23.pdf
Good Afternoon,
The Division of Energy, Mineral, and Land Resources (DEMLR), received a complete Stormwater Management Permit
Major Modification Application for the subject project on January 11, 2023. We are forwarding modified, updated, and
reissued Permit No. SW1170501, dated March 27, 2023, for the construction, operation and maintenance of the subject
project and the stormwater system. This permit shall be effective from the date of issuance and shall be subject to the
conditions and limitations as specified therein, and does not supersede any other agency permit that may be required.
The original signed permit package and approved plans are being mailed to the permittee, Mark Brooks, at the following
address (NOTE: An electronic version of this permit can be found in our online repository:
https://edocs.deq.nc.gov/WaterResources/Browse.aspx?id=494276&dbid=0&repo=WaterResources):
Acony Bell of WNC, LLC
Attn: Mark Brooks, Manager
17 Arlington Street
Asheville, NC 28801
I will hold onto our hard copies of these projects for 30 days (in case any issues/typos with the permit are noticed and
corrections need to be made) after which point, they will be kept on file at the Asheville Regional Office. If you have any
questions, or need additional information concerning this matter, please contact Jim Farkas at jim.farkas@ncdenr.gov.
Thank you,
Jim Farkas
State Stormwater Engineer
North Carolina Department of Environmental Quality
Office: (919) 707-3646
Jim.farkas@ncdenr.gov
1