Loading...
HomeMy WebLinkAboutSW1170501_review checklist_20220217 Application Completeness Review Checklist Project Name: Acopi� 8,.jj Date Delivered to CO: BIMS Received/Accepted Date: Project County/Location: i SIB 0 PWy *BIMS Acknowledged Date: Rule(s): Phase II E]OWR/HQW OWSWS Goose NSW Other Permit Action: New Major Mo /Minor Mod/Renewal/ -ra isfer **New Permit#: Permit Type: HD Apv LD Overall/HD &LD Combo Existing Permit#: 311///4,59 General Permit/Offsite/Exempt/ Rescission FIPE Cert on File? SCM Type(s): j& �s Offsite to SW: Development Type: Commercial1s:i1e:n�t:iia>lOther Master PE Cert on File? Subdivided?: n r Sin le For New or Transfers d ermits Permittee is: Stream Class: Property Owner(s) DDeveloper Lessee OPurchaser❑HOA EISA Map DORW Map Paperwork Emailed Engineer on: F—Tupplement(s) (1 original per BMP) ®0&M with correct/original signatures (1 original per BMP except LS/VFS and swales) LLJApplication with correct/original signatures ®Email Address: Design Engineer ®Corp or LLC: Sig.Auth. per SoS or Signature Authorization letter or report Email Address: Property Owner [7$505 (within 6mo) Check#(s): q3`/,5 E]No Fee ®Deed ®Soils Report: w/SHWT or General Report Email Address: Lessee Lia-iCalculations (signed/sealed) Lease Agreement Deed Restrictions, if subdivided: Email Address: Purchaser F-1**Signed & Notarized Template Purchase Agreement Correct Template (Comm/Res & HD/LD) or Dec. Covenants & Rest. Email Address: Developer Recorded Covenants Email Address: HOA Representative ❑Recorded Plats F-150%or more Lots Sold List Project Narrative MUSGS Map Plans ®2 Sets ��Wetlands` elineated r No Wetlands Vicinity Map 'rlProject Boundaries ®Legend ®Layout (proposed BUA dimensions) FTA Maps ®Details (roads, cul-de-sacs, curbs,sidewalks, BMPs, Buildings, etc) ©Existing Conditions Landscape Plan "Grading ©PE Seal REVIEWER NAME: NOTES TO REVIEWER: *Enter BIMS Acknowledged Date on this Sheet **FOR NEW Projects-Enter New Permit#on �' �(.✓ .S Supplements & Deed Restiction Templates. G:WQ\\\Reference Libra ry\Procedures\Checklists\Completeness Review Checklist_2018 03 13