HomeMy WebLinkAboutNC0040797_Compliance Evaluation Inspection_20230612ROY COOPER
Governor
ELIZABETH S. BISER
Secretary
RICHARD E. ROGERS, JR.
Director
Shawn Pennell, Public Utilities Director
City of Hickory
P.O. Box 398
Hickory, NC 28603-0398
SUBJECT: Compliance Evaluation Inspection
City of Hickory/Henry Fork WWTP
NPDES Permit No. NCO040797
Catawba County
Dear Mr. Pennell:
NORTH CAROLINA
Environmental Quality
June 12, 2023
Enclosed is a copy of the Compliance Evaluation Inspection (CEI) Report for the inspection conducted at the subject
facility on June 7, 2023, by Mr. Wes Bell of this Office. This Office would like to thank all WWTP staff for their cooperation
and assistance that was provided throughout this inspection. Please advise the facility's Operator -in -Responsible Charge
(ORC) of our findings by forwarding the enclosed report.
Should you have any questions concerning this report, please do not hesitate to contact Mr. Bell at (704) 235-2192 or at
wes.bellgricdenn gov.
Sincerely,
DocuSigned by:
A wNN,uft
F161 F669A2D84A3...
Andrew H. Pitner, P.G.
Regional Supervisor
Water Quality Regional Operations Section
Mooresville Regional Office
Division of Water Resources, NCDEQ
Enclosure:
Inspection Report
Cc: NPDES Program Files - Laserfiche
DEQ�
North Carolina Department of Environmental Quality I Division of Water Resources
Mooresville Regional Office 1 610 East Center Avenue, Suite 301 1 Mooresville, North Carolina 28115
704.663.1699
United States Environmental Protection Agency
Form Approved.
EPA Washington, D.C. 20460
OMB No. 2040-0057
Water Compliance Inspection Report
Approval expires 8-31-98
Section A: National Data System Coding (i.e., PCS)
Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type
1 IN 1 2 u 3 I NCO040797 I11 121 23/06/07 I17 18I � I 19 I s I 201 I
211IIIII 111111III II III III1 I I IIIII IIIIIIIII II r6
Inspection
Work Days Facility Self -Monitoring Evaluation Rating B1 QA ---------------------- Reserved -------------------
67
2.0 701d I 71 I„ I 72 I r., I 71 I 74 79 I I I I I I I80
L—I ty L-1 I I
Section B: Facility Data
Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include
Entry Time/Date
Permit Effective Date
POTW name and NPDES permit Number)
09:20AM 23/06/07
18/09/01
Henry Fork WWTP
4014 River Rd
Exit Time/Date
Permit Expiration Date
Hickory NC 28602
11:20AM 23/06/07
22/07/31
Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s)
Other Facility Data
Robert P Shave r/ORC/828-294-0861/
Name, Address of Responsible Official/Title/Phone and Fax Number
Contacted
Warren Wood,PO Box 398 Hickory NC 286010398//828-323-7412/
No
Section C: Areas Evaluated During Inspection (Check only those areas evaluated)
Permit 0 Flow Measurement Operations & Maintenar Records/Reports
Self -Monitoring Progran 0 Sludge Handling Dispo: Facility Site Review Effluent/Receiving Wate
Laboratory
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers Date
Wes Bell DocuSigned by: DWR/MRO WQ/704-663-1699 Ext.2192/ 6/12/2023
2 re&
A61696D90CC3437...
Signature of Mana eB&Qi&(R"iewer Agency/Office/Phone and Fax Numbers Date
Andrew Pitne A4-4 cx' H P4 MR/MRO WQ/704-663-1699 Ext.2180/ 6/12/2023
EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete.
Page#
NPDES yr/mo/day Inspection Type
NCO040797 I11 12I 23/06/07 117 18 i c i
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
Page#
Permit: NCO040797 Owner -Facility: HenryFork WWTP
Inspection Date: 06/07/2023 Inspection Type: Compliance Evaluation
Permit
Yes
No
NA
NE
(If the present permit expires in 6 months or less). Has the permittee submitted a new
0
❑
❑
❑
application?
Is the facility as described in the permit?
0
❑
❑
❑
# Are there any special conditions for the permit?
M
❑
❑
❑
Is access to the plant site restricted to the general public?
0
❑
❑
❑
Is the inspector granted access to all areas for inspection?
0
❑
❑
❑
Comment: Construction activities are onqoinq for the new bio-solids processing facility. The
projected completion date for the construction activities is Spring of 2025.
The City implements a Division -approved Industrial Pretreatment Program.
The Division received the City's permit renewal package on 6/28/2022.
The last compliance evaluation inspection at this facility was performed by DWR staff
on 2/17/2021.
Record Keeping
Are records kept and maintained as required by the permit?
Is all required information readily available, complete and current?
Are all records maintained for 3 years (lab. reg. required 5 years)?
Are analytical results consistent with data reported on DMRs?
Is the chain -of -custody complete?
Dates, times and location of sampling
Name of individual performing the sampling
Results of analysis and calibration
Dates of analysis
Name of person performing analyses
Transported COCs
Are DMRs complete: do they include all permit parameters?
Has the facility submitted its annual compliance report to users and DWQ?
(If the facility is = or > 5 MGD permitted flow) Do they operate 24/7 with a certified
operator on each shift?
Is the ORC visitation log available and current?
Is the ORC certified at grade equal to or higher than the facility classification?
Is the backup operator certified at one grade less or greater than the facility
classification?
Is a copy of the current NPDES permit available on site?
Facility has copy of previous year's Annual Report on file for review?
Yes No NA NE
• ❑ ❑ ❑
• ❑ ❑ ❑
■ ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
■ ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
■ ❑ ❑ ❑
■ ❑ ❑ ❑
■ ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
Page# 3
Permit: NCO040797
Inspection Date: 06/07/2023
Record Keeping
Owner -Facility: HenryFork WWTP
Inspection Type: Compliance Evaluation
Yes No NA NE
Comment: The records reviewed during the inspection were organized and well maintained.
Discharge Monitoring Reports (eDMRs) were reviewed for the period April 2022
through March 2023. No limit and/or monitoring violations were reported.
Laboratory
Yes
No
NA
NE
Are field parameters performed by certified personnel or laboratory?
0
❑
❑
❑
Are all other parameters(excluding field parameters) performed by a certified lab?
0
❑
❑
❑
# Is the facility using a contract lab?
0
❑
❑
❑
# Is proper temperature set for sample storage (kept at less than or equal to 6.0
0
❑
❑
❑
degrees Celsius)?
Incubator (Fecal Coliform) set to 44.5 degrees Celsius+/- 0.2 degrees?
❑
❑
0
❑
Incubator (BOD) set to 20.0 degrees Celsius +/- 1.0 degrees?
❑
❑
0
❑
Comment: Influent and effluent (including field) analyses are performed under the City's certified
laboratory certification #203. Pace Analytical Services, Statesville Analytical
and ETT
Environmental (chronic toxicity) have all been contracted to provide analytical support.
Influent Sampling
Yes
No
NA
NE
# Is composite sampling flow proportional?
0
❑
❑
❑
Is sample collected above side streams?
■
❑
❑
❑
Is proper volume collected?
0
❑
❑
❑
Is the tubing clean?
0
❑
❑
❑
# Is proper temperature set for sample storage (kept at less than or equal to 6.0
■
❑
❑
❑
degrees Celsius)?
Is sampling performed according to the permit?
0
❑
❑
❑
Comment: The subject permit requires influent BOD and TSS composite samples.
The composite
sampler is checked daily including aliquot verifications and the sampler
is calibrated
monthly (at a minimum).
Effluent Sampling
Yes
No
NA
NE
Is composite sampling flow proportional?
0
❑
❑
❑
Is sample collected below all treatment units?
0
❑
❑
❑
Is proper volume collected?
■
❑
❑
❑
Is the tubing clean?
N
❑
❑
❑
# Is proper temperature set for sample storage (kept at less than or equal to 6.0
0
❑
❑
❑
degrees Celsius)?
Is the facility sampling performed as required by the permit (frequency, sampling type
0
❑
❑
❑
representative)?
Page# 4
Permit: NCO040797
Inspection Date: 06/07/2023
Effluent Sampling
Owner -Facility: HenryFork WWTP
Inspection Type: Compliance Evaluation
Yes No NA NE
Comment: The subject permit requires composite and grab effluent samples. The composite
sampler is checked daily including aliquot verifications and the sampler is calibrated
monthly (at a minimum).
Upstream / Downstream Sampling Yes No NA NE
Is the facility sampling performed as required by the permit (frequency, sampling type, 0 ❑ ❑ ❑
and sampling location)?
Comment:
Operations & Maintenance Yes No NA NE
Is the plant generally clean with acceptable housekeeping? 0 ❑ ❑ ❑
Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable ❑ ❑ ❑
Solids, pH, DO, Sludge Judge, and other that are applicable?
Comment: The wastewater treatment facility appeared to be properly operated and well
maintained. The facility staff incorporate a comprehensive process control program
with all measurements beinq documented and maintained on -site. Detailed operation
& maintenance records are also maintained on -site.
The facility is also equipped with a SCADA system to assist the wastewater staff in
treatment plant operations.
Bar Screens
Yes
No
NA NE
Type of bar screen
a.Manual
❑
b.Mechanical
Are the bars adequately screening debris?
0
❑
❑
❑
Is the screen free of excessive debris?
0
❑
❑
❑
Is disposal of screening in compliance?
■
❑
❑
❑
Is the unit in good condition?
0
❑
❑
❑
Comment: Both bar screens were operational.
Pump Station - Influent
Yes
No
NA NE
Is the pump wet well free of bypass lines or structures?
0
❑
❑
❑
Is the wet well free of excessive grease?
0
❑
❑
❑
Are all pumps present?
0
❑
❑
❑
Are all pumps operable?
■
❑
❑
❑
Are float controls operable?
0
❑
❑
❑
Is SCADA telemetry available and operational?
0
❑
❑
❑
Page# 5
Permit: NCO040797 Owner -Facility: HenryFork WWTP
Inspection Date: 06/07/2023 Inspection Type: Compliance Evaluation
Pump Station - Influent Yes No NA NE
Is audible and visual alarm available and operational? ❑ ❑ 0 ❑
Comment:
Grit Removal Yes No NA NE
Type of grit removal
a.Manual
❑
b.Mechanical
Is the grit free of excessive organic matter?
0
❑
❑
❑
Is the grit free of excessive odor?
0
❑
❑
❑
# Is disposal of grit in compliance?
0
❑
❑
❑
Comment: The grit removal system is in the process of being
repaired. Screenings and grit are
disposed at the County Landfill.
Equalization Basins
Yes
No
NA
NE
Is the basin aerated?
■
❑
❑
❑
Is the basin free of bypass lines or structures to the natural environment?
0
❑
❑
❑
Is the basin free of excessive grease?
0
❑
❑
❑
Are all pumps present?
❑
❑
■
❑
Are all pumps operable?
❑
❑
■
❑
Are float controls operable?
❑
❑
0
❑
Are audible and visual alarms operable?
❑
❑
0
❑
# Is basin size/volume adequate?
❑
❑
❑
Comment: The equalization basin is equipped with six floating aerators. One of the aerators is in
the process of being repaired. The equalization basin effluent flows by
gravity to the
Primary clarifiers.
Primary Clarifier
Yes
No
NA NE
Is the clarifier free of black and odorous wastewater?
0
❑
❑
❑
Is the site free of excessive buildup of solids in center well of circular clarifier?
0
❑
❑
❑
Are weirs level?
0
❑
❑
❑
Is the site free of weir blockage?
0
❑
❑
❑
Is the site free of evidence of short-circuiting?
■
❑
❑
❑
Is scum removal adequate?
0
❑
❑
❑
Is the site free of excessive floating sludge?
0
❑
❑
❑
Page# 6
Permit: NCO040797
Inspection Date: 06/07/2023
Owner -Facility: HenryFork WWTP
Inspection Type: Compliance Evaluation
Primary Clarifier Yes
No
NA
NE
Is the drive unit operational? 0
❑
❑
❑
Is the sludge blanket level acceptable? E
❑
❑
❑
Is the sludge blanket level acceptable? (Approximately'/4 of the sidewall depth)
❑
❑
❑
Comment: One of the two primaries was not in service due to repairs on the clarifier drive
assembly.
Aeration Basins
Yes
No
NA NE
Mode of operation
Ext. Air
Type of aeration system
Diffused
Is the basin free of dead spots?
0
❑
❑
❑
Are surface aerators and mixers operational?
0
❑
❑
❑
Are the diffusers operational?
0
❑
❑
❑
Is the foam the proper color for the treatment process?
0
❑
❑
❑
Does the foam cover less than 25% of the basin's surface?
0
❑
❑
❑
Is the DO level acceptable?
0
❑
❑
❑
Is the DO level acceptable?(1.0 to 3.0 mg/1)
0
❑
❑
❑
Comment: Both aeration basin treatment trains were operation; however, only one train was in
service due to low influent flows. Magnesium hydroxide is added on an as -needed
basis to maintain appropriate alkalinity/pH levels.
Secondary Clarifier
Yes
No
NA
NE
Is the clarifier free of black and odorous wastewater?
0
❑
❑
❑
Is the site free of excessive buildup of solids in center well of circular clarifier?
0
❑
❑
❑
Are weirs level?
0
❑
❑
❑
Is the site free of weir blockage?
■
❑
❑
❑
Is the site free of evidence of short-circuiting?
0
❑
❑
❑
Is scum removal adequate?
0
❑
❑
❑
Is the site free of excessive floating sludge?
■
❑
❑
❑
Is the drive unit operational?
0
❑
❑
❑
Is the return rate acceptable (low turbulence)?
0
❑
❑
❑
Is the overflow clear of excessive solids/pin floc?
0
❑
❑
❑
Is the sludge blanket level acceptable? (Approximately'/4 of the sidewall depth)
0
❑
❑
❑
Comment: Both secondaries were in service.
Page# 7
Permit: NCO040797
Inspection Date: 06/07/2023
Owner -Facility: HenryFork WWTP
Inspection Type: Compliance Evaluation
Pumps-RAS-WAS
Yes
No
NA
NE
Are pumps in place?
0
❑
❑
❑
Are pumps operational?
0
❑
❑
❑
Are there adequate spare parts and supplies on site?
❑
❑
❑
■
Comment:
Disinfection -Gas
Yes
No
NA
NE
Are cylinders secured adequately?
■
❑
❑
❑
Are cylinders protected from direct sunlight?
0
❑
❑
❑
Is there adequate reserve supply of disinfectant?
0
❑
❑
❑
Is the level of chlorine residual acceptable?
0
❑
❑
❑
Is the contact chamber free of growth, or sludge buildup?
■
❑
❑
❑
Is there chlorine residual prior to de -chlorination?
0
❑
❑
❑
Does the Stationary Source have more than 2500 Ibs of Chlorine (CAS No.
❑
❑
❑
7782-50-5)?
If yes, then is there a Risk Management Plan on site?
❑
❑
❑
If yes, then what is the EPA twelve digit ID Number? (1000-
If yes, then when was the RMP last updated?
Comment: One of the two chlorine contact chamber trains was in service due to low flows.
Piedmont Chlorinator has been contracted to service the chlorination and
dechlorination equipment annually. The equipment was last service in June 2022.
De -chlorination
Yes
No
NA
NE
Type of system ?
Gas
Is the feed ratio proportional to chlorine amount (1 to 1)?
0
❑
❑
❑
Is storage appropriate for cylinders?
■
❑
❑
❑
# Is de -chlorination substance stored away from chlorine containers?
0
❑
❑
❑
Comment:
Are the tablets the proper size and type? ❑ ❑ 0 ❑
Are tablet de -chlorinators operational? ❑ ❑ ■ ❑
Number of tubes in use?
Comment:
Flow Measurement - Effluent Yes No NA NE
# Is flow meter used for reporting? 0 ❑ ❑ ❑
Page# 8
Permit: NCO040797 Owner -Facility:
Inspection Date: 06/07/2023 Inspection Type:
HenryFork WWTP
Compliance Evaluation
Flow Measurement - Effluent
Yes
No
NA
NE
Is flow meter calibrated annually?
0
❑
❑
❑
Is the flow meter operational?
0
❑
❑
❑
(If units are separated) Does the chart recorder match the flow meter?
❑
❑
0
❑
Comment: The flow meter is calibrated twice per year and was last calibrated on 1/11/2023 b
Diversified Integration, Inc.
Effluent Pipe
Yes
No
NA NE
Is right of way to the outfall properly maintained?
0
❑
❑
❑
Are the receiving water free of foam other than trace amounts and other debris?
❑
❑
❑
If effluent (diffuser pipes are required) are they operating properly?
❑
❑
❑
Comment: The effluent appeared clear with no floatable solids or foam.
Solids Handling Equipment
Is the equipment operational?
Is the chemical feed equipment operational?
Is storage adequate?
Is the site free of high level of solids in filtrate from filter presses or vacuum filters?
Is the site free of sludge buildup on belts and/or rollers of filter press?
Is the site free of excessive moisture in belt filter press sludge cake?
The facility has an approved sludge management plan?
Yes No NA NE
■ ❑ ❑ ❑
❑ ❑ ■ ❑
■ ❑ ❑ ❑
❑ ❑ ■ ❑
❑ ❑ ■ ❑
❑ ❑ ■ ❑
■ ❑ ❑ ❑
Comment: The facility is equipped with two aerated sludge holding tanks (1-primary sludge and
1-waste activated sludge). The facility was combining the primary sludge with the
waste activated sludge during the ongoing construction activities. All sludge is
transported to the Regional Compost facility (via City personnel) for continued
processing/treatment (Class A product).
Standby Power
Yes
No
NA
NE
Is automatically activated standby power available?
0
❑
❑
❑
Is the generator tested by interrupting primary power source?
0
❑
❑
❑
Is the generator tested under load?
■
❑
❑
❑
Was generator tested & operational during the inspection?
❑
❑
❑
■
Do the generator(s) have adequate capacity to operate the entire wastewater site?
0
❑
❑
❑
Is there an emergency agreement with a fuel vendor for extended run on back-up
0
❑
❑
❑
power?
Is the generator fuel level monitored?
0
❑
❑
❑
Page# 9
Permit: NC0040797
Inspection Date: 06/07/2023
Standby Power
Owner -Facility: HenryFork WWTP
Inspection Type: Compliance Evaluation
Yes No NA NE
Comment: The facility is equipped with two backup generators. Both generators are placed under
load monthly. Power Generation & Control, Inc. has been contracted to service the
generators annually. City staff perform the routine maintenance activities.
Page# 10