Loading...
HomeMy WebLinkAbout20181156 Ver 1_Notice of As-Built ReviewCAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Hello IRT, The below referenced FINAL As-Built/Record Drawing review has been requested by NCDMS. Per Section 332.8(o)(9) of the 2008 Mitigation Rule, this review follows the streamlined review process, which requires an IRT review period of 15 calendar days from this email notification. Please provide any comments by 5 PM on the 15-day comment deadline shown below. When providing comments please indicate if your concerns are great enough that you recommend not issuing the credit release. Comments provided after the 15-day comment deadline (shown below) may not be considered. Please note, if a site visit is requested by the IRT, comments will be due 15-days following the visit. At the conclusion of this comment period, a copy of all comments will be provided to NCDMS and the NCIRT along with District Engineer's intent to approve or disapprove this Final Record Drawing and initial credit release. 15-Day Comment Start Date: June 20, 2023 15-Day Comment Deadline: July 5, 2023 45-Day Credit Release Approval Deadline: August 4, 2023 2023 is Monitoring Year 1 for this project. Project information and location of the FINAL As-Built Baseline Monitoring Report (MY0): Sliver Moon II DMS Project# 100077 RFP# 16-007401—Issued 12/07/2017 Institution Date: 06/15/2018—Full Delivery SAW-2018-01761 DWR# 20181156 Neuse River Basin Cataloging Unit 03020202 Craven County, North Carolina Mitigation Plan Credits: 30.447 Non-Riparian WMUs As-Built-MY0 Credits: 30.447 Non-Riparian WMUs Mitigation Plan Area: 30.447 acres As-Built-MY0 Area: 30.447 acres Please note: Construction was completed in October 2021 and planting was completed in December 2021. The MY0 report was completed in the fall of 2022, but due to an easement encroachment discovered at that time resulting in the need to replant 0.892 acres and install additional easement marking, the MY0 report was delayed to the following spring in 2023. 2023 will be Monitoring Year 1 for this project. There is no change in wetland acreage from mitigation plan to as-built – 30.447 acres – and no change in project credits is requested. Provider: Restoration Systems, LLC, Ray Holz, Raymond.Holz@davey.com <mailto:Raymond.Holz@davey.com> , 919-604-9314 NCDEQ - DMS PM: Jeremiah Dow, jeremiah.dow@deq.nc.gov <mailto:jeremiah.dow@deq.nc.gov> , 919-218-0226 USACE Bank Manager: Todd Tugwell, todd.tugwell@usace.army.mil <mailto:todd.tugwell@usace.army.mil> , (919) 210-6265 USACE Mitigation Specialist: Erin Davis, Erin.B.Davis@usace.army.mil <mailto:Erin.B.Davis@usace.army.mil> , (919) 930-1887 FINAL As-Built Baseline Monitoring Report and Record Drawings can be accessed directly on the RIBITS and DMS SharePoint site here: RIBITS Link: https://ribits.ops.usace.army.mil/ords/f?p=107:278:171517103963:::RP,278:P278_BANK_ID:5271 <https://ribits.ops.usace.army.mil/ords/f?p=107:278:171517103963:::RP,278:P278_BANK_ID:5271> IRT-DMS SharePoint Page: https://ncconnect.sharepoint.com/sites/IRT-DMS/SitePages/Home.aspx <https://ncconnect.sharepoint.com/sites/IRT-DMS/SitePages/Home.aspx> Thank you, Erin Erin B. Davis Mitigation Specialist, Regulatory Division I U.S. Army Corps of Engineers l (919) 930-1887