Loading...
HomeMy WebLinkAboutSWA000209_Application Form_20230614DEMLR USE ONLY Date Received Fee Paid Permit Number SW Program(s): ❑ Coastal SA-HQW ❑ Coastal SA-ORW ❑ Coastal FW-ORW ❑ Coastal Other ❑ Non -coastal HQW ❑ Non -coastal ORW ❑ Urbanizing Areas ❑ USMP NC DEQ Division of Energy, Mineral and Land Resources Link to Application Instructions A. ELIGIBILITY FOR FAST -TRACK PERMITTING To be considered for a Fast Track ATC Permit, all of the items below must be checked. If any item cannot be checked, then the project must apply under the Standard Permitting Process. ® The project and all SCMs (including existing SCMs associated with the project) will meet all applicable requirements of 15A NCAC 02H .1000 - .1062, including the Minimum Design Criteria (MDC), upon project completion. ® The project is not proposing an alternative design. ® The project is not claiming an exemption from the MDC based on vested rights, a waiver or a Director's Certification. ® The project is not out of compliance with an existing stormwater permit or any other environmental permit. ® The project is not applying for an offsite permit, an exemption, or a minor modification (as defined in 15A NCAC 02H .1002(25)) to an existing state stormwater permit. ® The project application bears the signature and seal of a professional licensed pursuant to either Chapter 89A or 89C of the NC General Statutes. ® I understand that at project completion, an application with the as -built stormwater plans (as described in 15A NCAC 02H .1044 must be submitted, and DEQ will review the as -built stormwater plans to confirm compliance with the MDC. Approval of the as -built stormwater plans will be required before the Erosion and Sedimentation Control Plan for the project may be closed out. ® I understand that the Fast Track ATC Permit will expire five years after the date of issuance. 1 Project Name: 609 UNION WEST BLVD 2. Previous Project Name (if applicable): 3. Location of Project (street address): 609 UNION WEST BLVD City:MATTHEWS County:UNION Zip:28104 4. Directions to project (from nearest major intersection): FROM US HWY 74 GO NE ON STALLINGS RD (SR 1365) THEN RT ON RICHARD BAKER DR THEN LEFT ON UNION WEST BLVD CROSS OVER SHERIN LN GO TO END OF BLVD PROPERTY ON LEFT. 5. Latitude:350 05' 30" N Longitude:800 39' 48" W of the main entrance to the project. 1. Specify whether project is (check one): ® New, no previous application ❑ New, replacing a previous Fast Track ATC Permit -- provide previous permit number: SWA By choosing this option, you are also requesting that DEQ rescind the previous Fast Track ATC Permit upon issuance of the new Fast Track ATC Permit. Stormwater Fast Track ATC Application Form Page 1 of 9 Feb. 10. 2018 ❑ Major Modification, replacing an existing stormwater permit — provide existing permit number: SW Status of construction? ❑ Not Started ❑ Partially Completed ❑ Completed Major modifications must be submitted by the original permittee and are allowed only if the SW permit is not expired. Minor modifications must use Standard Permitting Process. By choosing this option, you are also requesting that DEQ rescind the previous SW Permit upon issuance of the new Fast Track ATC Permit. ❑ Transfer of existing Fast Track ATC Permit — provide existing ATC permit number: SWA, 2. Applicable state stormwater program(s) (check all that apply): ❑ Coastal SA-HQW ® Urbanizing Areas (Phase 2) ❑ Coastal SA-ORW ❑ Non -Coastal HQW Is any portion of the project within 575 feet of SA-ORW waters? ❑ Yes ❑ No ❑ Non -Coastal ORW ❑ Coastal Freshwater ORW ❑ USMP ❑ Coastal — Other 3. Other Permits (as applicable; write "NA" for those permit types that are not applicable): Project Name PermitlAppl Issue Date Other Information No. CAMA Major NA Erosion & 609 UNION WEST UNION- 08/11/22 Disturbed Area 1.92 Sedimentation Control BOULEVARD, LLC SITE 2022-065 acre DEVELOPMENT NPDES Industrial NA; Stormwater 404/401 Permit Proposed Impacts If/ac 4. Local jurisdiction for building permits: UNION COUNTY Point of Contact:MARK GRIFFIN Phone #: (704 ) 283-3643 1. Applicant/Financially Responsible Party (may be an Organization):609 UNION WEST BOULEVARD LLC Signing Official Name & Title:CHARLES E MEEKS Jr Member / Owner Street Address:2210 ALLEN DR City:SALISBURY State:MD Zip:21801 Mailing Address (if different):P.O. BOX 2111 City:SALISBURY State:MD Zip:21802 Phone: (443) 497-0140 Fax: ( ) Email: charlesmeeks(o)-delawareelevator.com or dcordrey(D-delawareelevator.com 2. If the Applicant is a Corporation or LLC (Address must match address on file with NC Dept of the Secretary of State): Name of Registered Agent:JOHN T. BURNS Mailing Address:103 N. Main St. City:MONROE State:NC Zip:28112 Phone: (704) 289-5594 Fax: ( ) Email: john(o)-jtburnslaw.com Stormwater Fast Track ATC Application Form Page 2 of 9 Feb. 10, 2018 3. The Applicant is the (check all that apply): ® Property Owner ❑ Lessee (Attach a copy of the lease agreement & complete Item 4.) ❑ Purchaser (Attach a copy of the pending sales agreement & complete Item 4.) ® Developer (Attach a copy of the development agreement & complete Item 4.) 4. If the Applicant is NOT the Property Owner (skip to Item 5 if the Applicant IS the Property Owner): Property Owner Name/Organization: Signing Official & Ti Street Address: City: State: Zip: Mailing Address (if applicable): City: State: Zip: Phone: ( ) Fax: ( ) Email: 5. The licensed Design Professional that will be retained for the duration of the project, who may provide information on the Applicant's behalf, and who will prepare and certify the as -built package: Consulting Engineer/Landscape Architect:DAVID W. ODOM PE Consulting Firm: ODOM ENGINEERING PLLC Mailing Address:169 OAK ST City:FOREST CITY State:NC Zip:28043 Phone: (828 ) 247-4495 Fax: ( ) Email:davidodom(o)-odomengineering.com 6. [OPTIONAL] If you would like to designate another person to answer questions about the project: Name & Title:B. SCOTT ROACH EIT-PROJECT MANAGER Organization: ODOM ENGINEERING PLLC Mailing Address:169 OAK ST City: FOREST CITY Phone: (828 ) 247-4495 Email:scotW( odomengineering.com 1. Specify the type of project (check one): ❑ Low Density State:NC Zip:28043 Fax: ( ) ® High Density 2. Briefly summarize how the stormwater runoff will be treated/conveyed: Stormwater post developed is directed to a proposed or established Wet Pond for detention & treatment at the rear of the 3. Stormwater runoff from this project drains to the YADKIN PEE DEE River basin(s). 4. Receivina water information (if more than 3 receivina waters. provide additional information on an attached sheet): Receiving Water 1 Receiving Water 2 Receiving Water 3 Receiving Stream Name N FORK CROOKED CRK CROOKED CRK Stream Classification C C Stream Index Number 13-17-20-1 13-17-20 Stormwater Fast Track ATC Application Form Page 3 of 9 Feb. 10, 2018 5. Project area and density information: Total Property Area 90779 sf Total Surface Water Area sf Considered to include: • the normal pool of impounded structures; • the area between the banks of streams and rivers, and • the area below the Normal High Water (NHM line or Mean High Water (MHW) line. Total Coastal Wetlands Area sf Considered to include: coastal wetlands landward from the NHW (or MHM line. Total Project Area 90779 sf Excludes the surface water area and coastal wetland area identified above. May or may not be the same as Property Area. Built -Upon Area (BUA) associated with Existing Development 0 sf "Existing development" means those projects that are built or those projects that have established a vested right under North Carolina law as of the effective date of the state stormwater program or applicable local government ordinance to which the project is subject. Proposed New BUA 45302 Includes proposed new BUA that is not associated with existing development. sf `BUA" is defined in N. C. G. S. 143-214.7(b2). It includes, but is not limited to: buildings, roads, parking areas, sidewalks, and some gravel areas. The design volume of SCMs must take into account the runoff from build out from all surfaces draining to the SCM in accordance with 15A NCAC 02H .1050(1). Project Density w/Existing Development: Project Density = (New BUAj/[Total Project Area — Existing BUA] x 100 or 49.90 % w/o Existing Development: Project Density = [New BUA]/Total Project Area] x 100 6. Anticipated construction start date 06/15/23 7. Is the project located within 5 miles of a public airport? ® No ❑ Yes If'Yes,'see S.L. 2012-200, Part VI: http://www.ncleg.net/Sessions/2011/Bills/Senate/PDF/S229v6.pdfand DEQ Stormwater Design Manual Chapter E-4 Airports. 8. For projects in Union County: Contact DEMLR Central Office Stormwater staff at 919-707-9200 to determine if the project is located within a Threatened & Endangered Species watershed that may be subject to more stringent stormwater requirements per 15A NCAC 02B .0600. Stormwater Fast Tracic ATC Application Form Page 4 of 9 Feb. 10, 2018 F. SUBMITTAL REQUIREMENTS Submit the application package to the appropriate DEMLR Regional Office (Coastal, SA Waters) or DEMLR Central Office (Urbanizing Areas Ph 2, USMP, Non -Coastal HQW/ORW). Only application packages that include all required items listed below will be accepted and reviewed. Initial each item below to indicate that the required information is provided in the application package: Initials BSR 1. Two original signed hard copies and one electronic copy of this State Stormwater Fast Track Process "Authorization to Construct" (ATC) Permit Application Form. CEM_ 2. Permit application processing fee of $505 payable to NCDEQ. BSR 3. Two hard copies and one electronic copy of a USGS map identifying the project location and GPS coordinates for the project. If the receiving water is Class SA or the receiving water drains to Class SA waters within '/Z mile of the project boundary, include the % mile radius on the map. If the project is within 575 feet of Class SA-ORW waters, include the 575-foot radius on the map. BSR 4. Two original signed hard copies and one electronic copy of a site plan depicting the boundary of the project or project phase currently being permitted, including the locations of SCMs, streams, wetlands, and buffers. BSR 5. Two hard copies and one electronic copy of a construction sequence that discusses how any future development on the project may be phased. BSR 6. A copy of the most current property deed. Deed book: 7241 Page No: 636-638 BSR 7. [IF APPLICABLE] When the applicant is a corporation or a limited liability corporation (LLC): Provide two hard copies and one electronic copy of documentation from the NC Secretary of State, or other official documentation, which supports the titles and positions held by the persons listed in Section C.2 per 15A NCAC 2H. 1043(3)(b). The corporation or LLC must be listed as an active corporation in good standing with the NC Department of the Secretary of State; otherwise, the application will be returned. https://www.sosnc.gov/search/index/corp 8. [IF APPLICABLE] When the applicant is a Partnership or other person engaging in business under an assumed name, attach a copy of the Certificate of Assumed Name. 9. [IF APPLICABLE] When the applicant is not the property owner: Provide two hard copies and one electronic copy of lease agreements, affidavits, pending sales agreement, development agreement, or other documents showing that the applicant has obtained legal rights to submit a stormwater permit application within the proposed project area. 10. [IF APPLICABLE] If modifying an existing permit for completed or partially completed projects, a copy of the designer's certification. Stormwater Fast Track ATC Application Form Page 5 of 9 Feb. 10, 2018 The Applicant, who is also the Financially Responsible Party, identified in Section D of this form must sign and have notarized the following guaranty: & Cq ( t,­„ u;- I, (print or type name of Applicant/Financially Responsible Party) CHARLES E. MEEKS Jr. me6w' CW0 & f'C certify that the information included on this permit application form is, to the best of my knowledge, correct and that: 1. the design has been or will be completed in accordance with the MDC as set forth in Rules 15A NCAC 02H .1050 through .1062, to the best of my knowledge; 2. the completed design meets or will meet the MDC and that the percentage BUA that is the basis for the design shall not be exceeded, to the best of my knowledge; and 3. As the applicant, I shall maintain a licensed professional of record for the duration of the project who will prepare and certify the as -built package. If I retain another licensed professional before the project is complete, then I shall provide an updated guaranty with the current licensed professional's seal. A licensed professional shall inform the Division if he is no longer associated with this project. The above information is true and correct to the best of my knowledge and belief and was provided by me under oath I agree to provide corrected information should there be any change in the information provided herein. �1r�Gi 2l-e�� me Wy%22 �.n aw L Type or print e Title or Authority C a" Signature Date 51 Q 1 ,;tcS�3 I, f ��. U -,a Notary Public for the State of A anAI o juk County of CO rO I LO , do hereby certify that ��� � � S L ) personally appeared before me this day of •`�� and acknowledge the due ejxecution of the application for a stormwater permit. Witness my hand and official seal, SEAL My commission expires r °f�naaaaai�� AMY L WALTON Notary Public - State of Maryland Wicomico County My Commission Expires Nov 14, 2026 Stormwater Fast Track ATC Application Form Page 6 of 9 Feb. 10, 2018 To be completed by the Design Professional identified in Section D.S. I, DAVID W. ODOM PE , attest to the following: 1. This application has been reviewed by me and is accurate and complete, to the best of my knowledge; 2. The design has been completed in accordance with the MDC as set forth in Rules 15A NCAC 02H .1050 through .1062, as applicable; 3. The percentage built -upon area that is the basis for the design will not be exceeded; and 4. 1 have the expertise, education, and experience required to design the SCMs proposed in this application in accordance with the MDC as set forth in Rules 15A NCAC 02H .1050 through .1062. 5. 1 will provide all documents and certified as -built plans in hard copy and electronic format related to this permit to a new Applicant/Property Owner and to DEMLR upon transfer of this permit to a new Applicant/Property Owner. Note: In accordance with N.C.G.S. 143-215.6A and 143-215.68, any person who knowingly makes any false statement, representation, or certification in any application shall be guilty of a Class 2 misdemeanor which may include a fine not o exceed $10,000 as well as civil penalties up to $25,000 per violation. In addition, any person who knowingly Ma es any false statement, representation, or certification in any application may be reported to the appropriatepf%�si¢nal licensing board. Signature:_1 � )6� W Date: 5 k I -Z 3 ..`+° N �» S �irr r S L 2113 r .. ®®®�t/O W..•OID����� SEAL Stormwater Fast Track ATC Application Form Page 7 of 9 Feb. 10, 2018 .#. , �t x a.. I, (print or type name of the Property Owner) , certify that I own the property identified in this permit application, and thus give permission to (print or type name of Applicant) with (print or type name of Applicant's organization) to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal, which indicates the party responsible for the operation and maintenance of the stormwater system. As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their lease agreement, or pending sale, responsibility for compliance with the DEMLR Stormwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DEMLR immediately and submit a completed Name/Ownership Change Form within 30 days; otherwise I will be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to $25,000 per day, pursuant to NCGS 143-215.6. Signature: Date: a Notary Public for the State of County of , do hereby certify that personally appeared before me this day of , and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, SEAL My commission Stormwater Fast Track ATC Application Form Page 8 of 9 Feb. 10, 2018 CERTIFICATIONJ. OF CURRENTP: ,.(COMPLETEONLYIF PERMIT TRANSFER REQUESTED) 1, (print or type name of the Current Permittee) am submitting this request for a transfer of Fast Track ATC permit # SWA With the submission of this transfer request I am providing a copy of the most recent permit, all related documents and as - built plans certified by my design professional in hard copy and electronic format to the Proposed Perm ittee/Applicant identified in Section G of this application and to DEMLR . I further attest that this request for a permit transfer is accurate and complete to the best of my knowledge. I assign all rights and obligations as permittee to the proposed permittee named in Section G of this form. Signature: Date: I, , a Notary Public for the State of County of personally appeared before me this , do hereby certify that day of , and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, SEAL My commission expires Stormwater Fast Track ATC Application Form Page 9 of 9 Feb. 10, 2018 °w -44 .... ,. � J p blh ✓00 �n N 4 �QF CUPPED z. 1014 Q w •w �pv FAO SITE �'oZ `f .. `�„ p II 74 LONG: -80.66299 w a wh �a �0 o P � f ,a M ^ Q b Q,l IL nn \ 4, ` f� J pIAN ."_ LtNI(1NVILLElNDF, ILLE UNION fa F ���```777 y t q p v k Au `•., ° .. ° Conder f Cem O 1,10 700 w Red Hill ib FILED UNION COUNTY, NC CRYSTAL D. GILLIARD REGISTER OF DEEDS FILED Apr 14,2022 AT 12:08 pm BOOK 08453 START PAGE 0568 END PAGE 0570 INSTRUMENT # 13927 EXCISE TAX $350.00 if NORTH CAROLINA GENERAL WARRANTY DEED Excise Tax: S,350.00 Parcel Identifier No: 07102297 Mail/Box to: Burns & Gray, PA This instrument was prepared by: John T. Burns / eb Brief escriplion for the Index: 609 Union West Bottlevard, Matthews, NC 28104 THIS DEED inade this Z!f ' day of K4L11L( 2022, by and between GRANTOR Bradley D. Prillaman and wife, Traci T. Prillaman 2117 Keegan Court Matthews, NC 28104 GRANTEE 609 Union West Boulevard, LLC 2210 Allen Dr. Salisbury, Maryland 21801 Enter in appropriate block tbr each party: name, address', and, if appropriate, character ofentity, c.g corporation or partnership. The designation Grantor and Grantee as used herein shall include said parties, their heirs, successols, and assigns, and shall include singular, plural, masculine, feminine or neuter as required by context, WITNESSETH, that the Grantor, for a valuable consideration paid by the Grantee, the receipt of which is hereby acknowledged, has and by these presents does grant, bargain, sell and C0rVeV Unto the Grantee in fee simple, in all that certain lot or pat -eel of land situated in the Vance Township, Union County, North Carolina and more particularly described as follows: See attached Exhibit A The property hereinabove described was acquired by Grantor by instrument recorded in Book 07602, page 737. The sale of this property does not include the seller's primary residence. A map showing a portion of the above described property is recorded in Plat Cabinet File TO HAVE AND TO HOLD the aforesaid lot or parcel of land and all privileges and appurtenances thereto belonging to the Grantee in fee simple. And the Grantor covenants with the Grantee, that Grantor is seized of"the preniises in fee simple, has the right to convey the same in fee simple, that title is marketable and free and clear of all encumbrances, and that Grantor will warrant and defend the title against the lawful claims of all persons whomsoever, other than the following exceptions: All right of ways of roads and utilities that border or cross said property. IN WITNESS WHEREOF, the Grantor has duly executed the foregoing as of the day and year first above written, (SEAL-) 13radL y D. Prillaman ,��Lk J, ---(SEAL) TraciT. Prillaman State of North Carolina - County of UNION 1, the undersigned Notary Public of the County and State aforesaid, certify that Bradley D. Prillaman personally appeared before me this day and acknowledged the (]Lie CXCCUtiOn Of the t,oregfloing Hisjrunient for%pu ses therein expressed. Witness my ]land and Notarial stamp or 01 fC 20 fission Expires: /C LLJ Notary Public JV C0\3 State of North Carolina - County of UNION 1, the undersigned Notary Public of the Count), and State aforesaid, certify that Traci T. Prillaman personally appeared before me this day and acknowledged the due execution Of the foregoing in a vent for 6e put in . poses thereexpressed. Witness my ]land and Notarial stamp or d seal this My Commission Expircs:__A2 Notary Public EXHIBIT "A" Tract 1: BEGINNING at 5/8" existing iron rebar next to a telephone pole, just south of a transformer and northwest of a cable television utility, said existing iron rebar marking the common western comer of subject parcel and that of Lot 29, Union West Business Park, Phase 3, Plat Cabinet K, File No. 332, Union County Registry, and running thence along and with the common property line with said Lot 29, North 72-01-12 East 628.33 feet to another 5/8" existing iron rebar; thence South 52-48-47 East 3.97 feet to a 2 inch existing iron pipe; thence South 3-54-20 West 79.92 feet to a %Z inch new iron rebar; thence back toward Union West Boulevard South 58-54-54 West 239.53 to a NCDOT R/W Disk said line being the northern boundary of the US Highway 74 Bypass; thence with another line forming the continuation of the northern boundary of US 74 Bypass, South 63-13-47 West 324.34 feet to another NCDOT R/W Disk; thence North 15-57-24 West 49.37 feet to a 1/2 inch new iron rebar; and thence with a final call of North 38-19-16 West 140.74 feet to the POINT AND PLACE OF BEGINNING, denominated as "Remainder of Tract 2" and containing 1.807 acres, all according to a"Boundary Survey, Tract 2, Union West Business Park, Phase 3" by Russell L. Whitehurst, NCPLS, Eagle Engineering, and dated August 22, 2018. Tract 2: BEGINNING at a 1" existing iron rebar on the southern margin of the US Highway 74 Bypass, the common corner thereon with that of Smith Properties H, LLC, Book 1819, Page 588, Union County Registry, now or formerly, and running thence with the "Smith" line South 3-54-20 West 33.89 feet to a % inch new iron rebar; thence along and with the common line with Edwards Land Holdings, LLC, Book 5083, Page 497, Union County Registry, South 2-14-44 West 82.75 feet to another % inch new iron rebar, running thence North 87-27-57 West 188.98 feet to another''/2 inch new iron rebar on the southern margin of the US Highway 74 Bypass; thence along and with the southern margin of said Bypass with a final call of North 60-54-21 East 222.41 feet to the POINT AND PLACE OF BEGINNING, also denominated as "Remainder of Tract 2" and containing 0.252 acres, all according to a'Boundary Survey, Tract 2, Union West Business Park, Phase 3" by Russell L. Whitehurst, NCPLS, Eagle Engineering, and dated August 22, 2018. (Said parcels being divided by the new US Highway 74 Bypass and together constituting Tax Parcel ID #07-102-297) SUPPLEMENT-EZ COVER PAGE FORMS LOADED I -PROJECT INFORMATION Project Name 609 UNION BLVD WEST 2 Project Area (ac) 2.08 3 Coastal Wetland Area (ac) 4 Surface Water Area (ac) v 5 Is this project High or Low Density? High 6 Does this project use an off -site SCM? No COMPLIANCE WITH 02H.1003(4) 7 Width of vegetated setbacks provided (feet) Will the vegetated setback remain vegetated? N/A , 9 If BUA is proposed in the setback, does it meet NCAC 02H.1003(4)(c-d)? N/A 10 Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMS: 11 Infiltration System 12 Bioretention Cell 13 Wet Pond 14 Stormwater Wetland 15 Permeable Pavement 16 Sand Filter 17 Rainwater Harvesting (RWH) 18 Green Roof 19 Level Spreader -Filter Strip (LS-FS) 20 Disconnected Impervious Surface (DIS) 21 Treatment Swale 22 Dry Pond 23 StormFiiter 24 Silva Cell 25 Bayfilter 26 Filterra I FORMS LOADED I DESIGNER CERTIFICATION 27 Name and Title: DAVID W. ODOM, PE 28 Organization: ODOM ENGINEERING, PLLC 29 Street address: 169 OAK ST 30 City, State, Zip: FOREST CITY, NC 28043 31 Phone number(s): 828-247-4496 _-- 32 Email: ng.com J davidodom@odomengineering.com Certification Statement I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. Designer C SEAL 211 0 ZZ, n� L) W 0 Signature of Desibner Date DRAINAGE AREAS 1 Is this a high density project? Yes 2 If so, number of drainage areas/SCMs 1 3 Does this project have low density areas? _ No 4 If so, number of low density drainage areas 0 5 Is all/part of this project subject to previous rule versions? No FORMS LOADED DRAINAGE AREA INFORMATION m 4 T e of SCM _ Entire Site WET POND 5 Total draina a areas ft 57499 6 Onsile draina a area (sq ft 57499 7 Offsite drainage area (sq ft) 0 8 Total BUA in project (sq ft) 45302 sf 9 New BUA on subdivided lots (subject to permitting) (sq ft) 7 10permitting) New BUA not on subdivided lots (subject to (so 11 1 Offsite BUA (sq ft) 12 Breakdown of new BUA not on subdivided lots: - Parkin (sq ft) 28126 sf - Sidewalk (sq ft) 1379 sf - Rcof (s ft 12000 sf - Roadway (sq ft) - Future (sq ft) Other, please specify in the comment box below (sq ft 13 New infiltrating permeable pavement on subdivided lots (sq ft 14 New infiltrating permeable pavement not on subdivided lots (sq ft) 15 Existing BUA that will remain (not subject to permitting) (sq ft 16 Existing BUA that is already permitted (sq ft) 17 Existing BUA that will be removed (sq ft 18 Percent BUA 79% 19 Design storm (inches) 2.5 in 20 Design volume of SCM cu ft) _ _ 14525 cf 21 _ Calculation method for design volume ADDITIONAL INFORMATION HYDROCAD 22 Please use this space to provide any additional information about the drainage area(s): i I Drainage area number 1� ERAL 2 Minimum rye wired treatment volume (cu ft) 9948 cf .,,. MDC FROM 02H A050 3 Is the SCM sized to treat he real the SW from all surfaces at bwld-out? Yes r 4 Is the SCM located away from contaminated soils? Yes 5 What are the side slopes of the SCM (H:V)? 3:1 6 Does the SCM have retaining walls, gabion walls or other engineered side slopes? _ _ No Are the inlets, outlets, and receiving stream protected from erosion 7 (10-year storm)? Yes 8 Is there an overflow or bypass for inflow volume in excess of the design volume? No 91 What is the method for dewatering the SCM for maintenance? Pump (preferred) 10 If applicable, will the SCM be cleaned out after construction? Yes 11 Does the maintenance access comply with General MDC (8)? _ Yes 12 Does the drainage easement comply with General MDC (9)? Yes 13 If the SCM is on a single family lot, does (will?) the plat comply with General MDC (10)? No 14 Is there an O&M Agreement that complies with General MDC (11)? Yes 15 Is there an O&M Plan that complies with General MDC (12)? Yes 16 Does the SCM follow the device specific MDC? Yes 17 Was the SCM desi ned bun NC licensed rofessional? WET POND MDC FROM 02H .1053 m 18 Sizing method used Yes mro SA/DA 191 Has a stage/storage table been provided in the calculations? Yes 20 Elevation of the excavated main pool depth (bottom of sediment removal) (fmsi) 21 Elevation of the main pool bottom (top of sediment removal) (fmsl) 677.00 22 Elevation of the bottom of the vegetated shelf (fmsi) 683.00 23 Elevation of the permanent pool (fmsi) 683.00 24 Elevation of the top of the vegetated shelf (fmsl) 683.00 25 Elevation of the temporary pool (fmsl) 683.50 26 Surface area of the main permanent pool (square feet) 2896 27 Volume of the main permanent pool (cubic feet) 10681 cf 28 Average depth of the main pool (feet) 6.00 It 29 Average depth equation used Equation 2 30 If using equation 3, main pool perimeter (feet) 31 If using equation 3, width of submerged veg. shelf (feet) 32 Volume of the forebay (cubic feet) 1602 cf 33 Is this 15-20% of the volume in the main pool? Yes 34 Clean -out depth for forebay (inches) 6 in 35 Design volume of SCM (cu ft) 36 Is the outlet an orifice or a weir? Weir 37 If orifice, orifice diameter (inches) 38 If weir, weir height (inches) 8 in 39 If weir, weir length (inches) 120 in 40 Drawdown time for the temporary pool (days) 1.12 41 Are circuiting? the inlet(s) and outlet located in a manner that avoids short- Yes 42 jAre berms or baffles provided to improve the flow path? No 43 IDepth of forebay at entrance (inches) i 42 in 44 IDepth of forebay at exit (inches) 42 in 45 Does water flow out of the forebay in a non -erosive manner? Yes 46 lWidth of the vegetated shelf (feet) 6 ft 47 ISlope of vegetated shelf (H:V) :1 48 Does the orifice drawdown from below the top surface of the ermanentpool? Yes 49 Does r, the pond minimize impacts to the receiving channel from the 1- 24-hr storm? Yes 50 Are MDC(9) fountains proposed? (If Y, please provide documentation that is met. No 51 Is a trash rack or other device provided to protect the outlet system? Yes 52 Are the dam and embankment planted in non -clumping turf grass? Yes 53 Species of turf that will be used on the dam and embankment FESCUE 54 Hasa `ADDITIONAL 55 Please wet lancing Ian been rovided for the ve etaled shelf? INFORMATION use this space to provide any additional information about the pond(s): Yes Wet Pond 1 3:14 PM 5/1/2023 Project Name: Project Location: 609 UNION WEST BLVD (CHARLES E. MEEKS WAREHOUSE) 609 UNION WEST BLVD, STALLINGS, NC Cover Page Maintenance records shall be kept on the following SCM(s). This maintenance record shall be kept in a log in a known set location. Any deficient SCM elements noted in the inspection will be corrected, repaired, or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the pollutant removal efficiency of the SCM(s). The SCM(s) on this project include (check all that apply & correspo Infiltration Basin Quantity: Infiltration Trench Quantity: Bioretention Cell Quantity: Wet Pond Quantity: 1 Stormwater Wetland Quantity: Permeable Pavement Quantity: Sand Filter Quantity: Rainwater Harvesting Quantity: Green Roof Quantity: Level Spreader - Filter Strip Quantity: Proprietary System Quantity: Treatment Swale Quantity: DryPond Quantity: Disconnected Impervious Surface Present: No User Defined SCM Present: No Low Density Present: No O&M sheets will Location(s). Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Type: oe aaaeo automaucai IREAR OF PROPERTY I I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed for each SCM above, and attached O&M tables. I agree to notify NCDEQ of any problems with the system or prior to any changes to the system or responsible party. Signature: Responsible Party: Title & Organization: Street address: City, state, zip: Phone number(s): Email: CHARLES E. MEEKS, Jr OWNER / DEVELOPER (609 UNION WEST BLVD LLC) 2210 ALLEN DR SALISBURY, MD 21801 800-787-0436 chariesmeeks@delewaree evat c m Date:j a Not Public for the State of e County of �� do hereby certify thatv,h( personally appeared before me this '` �'� day of �f{ILLA C) 2---3 and acknowledge the due execution of the Operations and Maintenance Agreement. Witness my hand and official seal, Seal My commission expires AMY L WALTON Notary Public - State of Maryla]2026 Wicomico County My Commission Expires Nov 14, STORM-EZ 5/1 /2023 Version 1.5 O&M Agreement Paae 1 of 1 Wet Pond Maintenance Requirements (Continued) SCM element: Potential problem: How to remediate the problem: Sediment has accumulated to a depth Search for the source of the sediment and remedy the problem greater than the original if possible. Remove the sediment and dispose of it in a location design sediment storage where it will not cause impacts to streams or the SCM. depth. Algal growth covers over Consult a professional to remove and control the algal growth. The main treatment area 50 /o of the area. Cattails, phragmites or other invasive plants cover Remove the plants by wiping them with pesticide (do not spray). 50% of the basin surface. Best professional practices show that pruning is needed to maintain optimal Prune according to best professional practices. plant health. The vegetated shelf Determine the source of the problem: soils, hydrology, disease, Plants are dead, diseased etc. Remedy the problem and replace plants. Provide a one - or dying. time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. Shrubs have started to Remove shrubs immediately. grow on the embankment. Evidence of muskrat or Consult a professional to remove muskrats or beavers and beaver activity is present. repair any holes or erosion. A tree has started to grow Consult a dam safety specialist to remove the tree. The embankment on the embankment. An annual inspection by an appropriate professional Make all needed repairs immediately. shows that the embankment needs repair. Clogging has occurred. Clean out the outlet device and dispose of any sediment in a location where it will not cause impacts to streams or the SCM. The outlet device outlet device is Repair or replace the outlet device. The damaged. Weeds or volunteer trees Remove the weeds or trees. a re growing on the mat. Floating wetland island (if applicable) The anchor cable is damaged, disconnected or Restore the anchor cable to its design state, missing. Wet Pond Maintenance Reauirements (Continued) [s-CM element: Potential problem: How to remediate the problem: Erosion or other signs of damage have occurred at Repair the damage and improve the flow dissipation structure. the outlet. The receiving water Discharges from the wet pond are causing erosion or sedimentation in the Contact the local NCDEQ Regional Office. receiving water. Wet Detention Pond Design Summary Pretreatment other thanfornbay? Has Veg. Filter? Permanent Pool B. 683 Temporary Pool El: 683 Clean Out Depth: Sediment Removal El 680 Bottom Elevation: 679 Permanent Pool El. 683 Temporary Pool El: 683 Clean Out Depth: 5.5 Sediment Removal El