HomeMy WebLinkAboutSW6220804_comments_20220707 D
ENGINEERING
July 5,2022
Mr.Jim Farkas
Environmental Engineer
North Carolina Department of Environmental Quality
Division of Energy,Mineral and Land Resources
1612 Mail Service Center
512 North Salisbury Street
Raleigh,NC 27699-1612
Re: South River Electric Membership Corporation
Rebekah Evans 230 KV POD
Cumberland County,NC
Dear Mr.Farkas:
Enclosed is a stormwater management permit application package submittal for the Rebekah Evans 230 KV POD substation. South
River Electric Membership Corporation("SRI MC")of Dunn,NC is planning to construct a new electrical substation in Cumberland
County,NC on an existing parcel that they own.Pike Engineering,LLC,is contracted to develop construction plans for the facility.
The substation is necessary to provide capacity to meet the growing demand for electrical energy in the region. The submittal is
inclusive of the items identified in in section VI Submittal Requirements on the application form
Thank you in advance for your review of this critical energy supply project.Please do not hesitate to contact me if you have questions
or need additional information.The contact information is below.
Sincerely,
Joe Ervin,PE
RECEIVED
Pike Engineering,LLC ,
(843)697-0606 ��J�. ��
jervin pike.com
DEMf.R-Stormwater ProM
Attachments
123 North White Street•Fort Mill,SC 29715
P:803-835-6151 •www.pike.com