Loading...
HomeMy WebLinkAboutSW6220804_comments_20220707 D ENGINEERING July 5,2022 Mr.Jim Farkas Environmental Engineer North Carolina Department of Environmental Quality Division of Energy,Mineral and Land Resources 1612 Mail Service Center 512 North Salisbury Street Raleigh,NC 27699-1612 Re: South River Electric Membership Corporation Rebekah Evans 230 KV POD Cumberland County,NC Dear Mr.Farkas: Enclosed is a stormwater management permit application package submittal for the Rebekah Evans 230 KV POD substation. South River Electric Membership Corporation("SRI MC")of Dunn,NC is planning to construct a new electrical substation in Cumberland County,NC on an existing parcel that they own.Pike Engineering,LLC,is contracted to develop construction plans for the facility. The substation is necessary to provide capacity to meet the growing demand for electrical energy in the region. The submittal is inclusive of the items identified in in section VI Submittal Requirements on the application form Thank you in advance for your review of this critical energy supply project.Please do not hesitate to contact me if you have questions or need additional information.The contact information is below. Sincerely, Joe Ervin,PE RECEIVED Pike Engineering,LLC , (843)697-0606 ��J�. �� jervin pike.com DEMf.R-Stormwater ProM Attachments 123 North White Street•Fort Mill,SC 29715 P:803-835-6151 •www.pike.com