Loading...
HomeMy WebLinkAboutWQ0029945_Monitoring - 04-2023_20230524FORM: NDMR 03-12 NON -DISCHARGE MONITORING REPORT (NDMR) Page i of f Permit No.: WQ0029945 Facility Name: Summerhouse Water Reclamation Facility County: Onslow Month: April Year: 2023 PPI: 001 Flow Measuring Point: ❑ Influent 0 effluent ❑ No flow generated Parameter Monitoring Point: ❑ Influent Effluent ❑ E] Groundwater Lowering ❑surface Water Parameter Code 0 50050 00076 00400 50060 00310 31616 00610 00625 00620 00600 00665 00530 70300 00940 00680 m m m ¢£ O~ O m E; 1- fn O 3 ° V- p F x a m e :°°_'' ° a° ~ d' U Ln p O m E °o m= LL U a o E Q r ° D a a) CD Y 2 O Z d Z Mrn o o ~ Z t°t ° a ~_ a v v aeo o m CL ~ 7 N co o d �a?v °° ~ ° ° o () y c m a rno a O U F 24-hr hrs GPD NTU su mg/L mg/L #/100 mL mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L 1 17,268 0.281 2 20,704 0.192 3 08:00 6 20,758 8 7.91 0.04 <2.00 <1.00 <0.500 1.05 <0.250 <1.25 0.48 <2.50 4 06:30 5 20,956 8 7.84 0.02 2.3 <1.00 <0.500 1.09 <0.250 <1.25 0.715 <2.50 5 06:45 9.25 24,496 1 8 7.9 0.1 6 12:30 0.25 22,780 5.167 7.91 0.06 7 H H 22,457 3.626 7.84 0.07 8 19,620 5.063 9 16,811 1.76 10 10:00 5 15,341 0.253 7.94 0.02 <2.00 <1.00 <0.500 <1.00 2.29 2.33 0.623 <2.50 11 07:00 4 15,365 1.039 7.84 0.06 4.3 <1.00 1 <0.500 <1.00 3.02 3.06 0.656 <2.50 12 07:00 8 14,298 1.63 7.65 0.05 13 04:00 8.25 15,270 0.587 7.82 0.05 14 07:00 8 14,918 0.45 7.65 0.06 15 16,753 0.46 16 6,124 0.279 17 07:00 9 12,463 0.858 7.44 0.05 3.2 <1.00 <0.500 <1.00 0.326 1 <1.25 <0.250 <2.50 18 06:30 12 4,558 0.771 8.07 0.14 6.2 <1.00 1 <0.500 <1.00 0.489 <1.25 0.756 <2.50 19 04:30 11.5 67,329 1.939 7.8 0.04 20 07:00 8 73,974 0.09 7.87 0 21 08:00 6.5 70,390 0.059 7.91 0 22 74,207 0.07 23 69,052 0.05 24 06:30 8 54,408 0.975 7.02 0.02 3.2 <1.00 16.2 16.7 5.67 5.97 0.599 <2.50 25 06:00 9 39,311 0.09 7.09 0.01 4.3 <1.00 1 13 16 6.56 6.96 0.643 <2.50 26 10:00 5 51,393 0.202 7.04 0 27 07:00 8 66,274 0.079 7.03 0.01 28 07:00 6 52,555 0.058 7.1 0.05 29 06:30 4 103,355 0.058 30 06:15 4 63,737 0.059 31 Average: 36,231 1.67 0.04 2.94 1.00 3.65 4.36 2.29 2.29 0.56 0.00 Daily Maximum: 103,355 8.00 8.07 0.14 6.20 1.00 1 16.20 16.70 6.56 6.96 0.76 2.50 Daily Minimum: 4,558 0.05 7.02 0,00 2.00 1.00 0.50 1.00 0.25 1.25 0.25 2.50 Sampling Type: Recorder Recorder Grab Grab Composite Grab Composite Composite Composite Composite Composite Composite Composite Composite Composite Monthly Avg. Limit,11 400,000 j 10 14 4 10 2 5 Daily Limit: 10 6 -- 9 15 25 6 10 Sample Frequency: FORM: NDMR 03-12 NON -DISCHARGE MONITORING REPORT (NDMR) Page _I of 4 Permit No.: •11 ••45 Facility Name: Summerhouse Water Reclamation. Onslow Month:April1 • • MEW, 11---------------- FORM: NDMR 03-12 NON -DISCHARGE MONITORING REPORT (NDMR) Page --�> of Permit No.: �•11 •••5 Facility Name: Summerhouse Water Reclamation. Onslow. �• 1 11 '� ■ ■mail■ �. MON& ■ ..• 11 1 11 .:1 11 •.1 ® 11. � 11. 1 11�11 1 11 _-_--___ • • FORM: NDMR 03-12 NON -DISCHARGE MONITORING REPORT (NDMR) Page __q_ of 4_1 Sampling Person(s) Certified Laboratories Name: Kary Herndon, Tracy Fisher, Rayne Rockwell Name: Onwasa Laboratory Cert# 539 Name: Name: Envirochem Cert# 94 Does all monitoring data and sampling frequencies meet the requirements in Attachment A of your permit? ❑ Compliant ❑� Non -Compliant If the facility is non -compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective action(s) taken. Attach additional sheets if necessary. ad an exceedance for daily ammonia on 4/24 and 4/25. This was due to the reduction in aeration from the colder months and the membranes having reduced filtrate potential prior to replacement on 4/18/23. 1 have reduced recirculation rates and increased aeration in the biological tank. All other parameters were compliant for the month. Operator in Responsible Charge (ORC) Certification Permittee Certification ORC: Kary Herndon Permittee: Onslow Water and Sewer Authority Certification No.: WW4: 1012918 Signing Official: Dave Mohr Grade: 3 Phone Number: 910-650-7883 Signing Officials Title: Chief Operations Officer Has the ORC changed since t revious NDMR? ❑ Yes ❑ No Phone Number: 910-937-7523 Permit Expiration: 12/31/25 Z3 t;- Z3 Signature Date Signature Date By this signature, I certify that this report is accurrale and complete to the best of my knowledge. I certify, under penally of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that all qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. Mail Original and Two Copies to: Division of Water Resources Information Processing Unit 1617 Mail Service Center Raleigh, North Carolina 27699-1617 FORM: NDAR-2 10-13 NON -DISCHARGE APPLICATION REPORT (NDAR-2) Page ( off Permit No.: WQ0029945 Facility Name: Summerhouse Water Reclamation Facility County: Onslow Month: April Year: 2023 Did infiltration occur at Site Name: I13-1 Site Name: I13-2 Site Name: Site Name: this facility? Area (acres): 5.04 Area (acres): 2.09 Area (acres): Area (acres): ❑� YES ❑ NO Rate (GPD/ft): 1.099 Rate (GPD/ft): 1.099 Rate (GPD/ft2): Rate (GPD/ft2): Weather Freeboard Site Infiltrated? ❑ YES El NO Site Infiltrated? 0 YES ❑ NO Site Infiltrated? ❑ YES ❑ NO Site Infiltrated? ❑ YES ❑ NO ❑,��, m C.Co°v) a Fw- c ° ° a}`_o - om o 2❑ N a�m CLM 2 p. A u1 _ E o v 0 0) in o J v mp°v o LLm> E o i - - o o O LL m O C Q y EL JC cm � CU lL m EE C` _ °� cOC, MU)CL N LL m °F in ft ft gal min GPD/ft2 ft gal min GPD/ft2 ft gal min GPD/ft2 ft I gal min GPD/ft2 ft 1 C 1 49 0 1.5 0 0 0.00 4.80 17,268 1,440 0.19 3.80 2 C 39 0 1.5 0 0 0.00 4.80 20,704 1,440 0.23 3.80 3 R 53 0.1 1.5 0 0 0.00 4.80 20,758 1,440 0.23 3.80 4 C 62 0 1.5 0 0 0.00 4.80 20,956 1,440 0.23 3.80 5 C 66 0 1.9 0 0 0.00 4.80 24,496 1,440 0.27 3.80 6 C 67 0 2.2 0 0 0.00 4.80 22,780 1,440 0.25 3.80 7 R 65 0.25 2.5 0 0 0.00 4.60 22,457 1,440 0.25 3.80 8 R 48 2.05 2.4 0 0 0.00 4.40 19,620 1,440 0.22 3.80 9 R 46 0.08 2.3 0 0 0.00 3.80 16,811 1,440 0.18 4.00 10 C 42 1 0 1.9 0 0 0.00 3.80 15,341 1,440 0.17 4.00 11 C 50 0 1.8 0 0 0.00 3.80 15,365 1,440 0.17 4.00 12 C 48 0 1.8 0 0 0.00 3.80 14,298 1,440 0.16 4.00 13 R 46 0.07 1.8 0 0 0.00 3.80 15,270 1,440 0.17 4.00 14 C 66 0.4 1.8 0 0 0.00 3.80 14,918 1,440 0.16 4.00 15 C 64 0 1.8 0 0 0.00 3.80 16,753 1,440 0.18 4.00 16 C 64 1 0 1.8 0 0 0.00 3.80 6,124 1,440 0.07 4.00 17 C 68 0 1.8 0 0 0.00 1 3.80 12,163 1,440 0.13 1 4.00 18 C 48 0 1.5 0 0 0.00 3.80 4,558 1,440 0.05 4.00 19 C 58 0 1.7 0 0 0.00 3.80 67,329 1,440 0.74 4.00 20 C 77 0 2 0 0 0.00 3.80 73,974 1,440 0.81 4.00 21 C 76 0 2 0 0 0.00 4.00 70,390 1,440 0.77 4.00 22 R 69 0.67 2.1 0 0 0.00 4.00 74,207 1,440 0.82 4.00 23 C 53 0 2.1 0 0 0.00 4.00 69,052 1,440 0.76 3.90 24 C 60 0 2.2 0 0 0.00 4.00 54,408 1,440 0.60 3.70 25 C 61 0 2.3 0 0 0.00 4.00 39,311 1,440 0.43 3.50 26 R 59 2.1 1 2.4 0 0 0.00 4.00 51,393 1,440 0,56 3.50 27 R 60 0.1 2.5 0 0 0.00 4.00 66,274 1,440 0.73 3.70 28 R 65 0.05 2.6 0 0 0.00 4.00 52,555 1,440 0.58 3.50 29 R 65 0.12 2.7 0 0 0.00 3.90 103,355 1,440 1.14 3.40 30 R 67 0.3 2.8 0 0 0.00 3.80 63,737 1,440 0.70 3.20 31 Monthly Loading (GPD/ft2) '� 0.00 yf y 0 40 ' 0 ✓ r t i F #DIV/0� #DIV/01 ✓/ 4 Year to Date Loadin (GPD/ft2 :, n�i� ,. ", �� 0.00 �., „ .�. ., ., . �✓ i58 �h ,,,�� 4.Y� , ���b°:�d I-z l FORM: NDAR-2 10-13 NON -DISCHARGE APPLICATION REPORT (NDAR-2) Page 2 of Z Did the application rates exceed the limits in Attachment B of your permit? 0 Compliant ❑ Non -Compliant If not a basin, were the sites kept free of vegetation and raked? [Z Compliant ❑ Non -Compliant If not a basin, were there any instances of effluent ponding in or runoff from the sites? FZ] Compliant ❑ Non -Compliant If a basin, were there any instances of breakout from the berms? ❑' Compliant ❑ Non -Compliant Was the onsite automatically activated standby power source tested and operational? 2 Compliant ❑ Non -Compliant If the facility is non -compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective taken. Attacn additional sheets if necessary. Operator in Responsible Charge (ORC) Certification Permittee Certification ORC: Kary Herndon Permittee: Onslow Water and Sewer Authority Certification No.: WW4: 1012918 Signing Official: Dave Mohr Grade: 3 Phone Number: 910-650-7883 Signing Official's Title: Chief Operations Officer Has the ORC changed since th previous NDAR-2? ❑ Yes E] No Phone Number: 910-937-7521 Permit Exp.: 12/31/25 � OS 18 ac2 Signature Date Signature ate By this signature, I certify that this report is accurrate and complete to the best of my knowledge. I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that all qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. Mail Original and Two Copies to: Division of Water Resources Information Processing Unit 1617 Mail Service Center Raleigh, North Carolina 27699-1617 Monitoring Report Submittal ................................................... Permit Number#* WQ0029945 Name of Facility:* Onslow Water and Sewer Authority - Summerhouse Water Reclamation Facility Month: * April Year: * 2023 Report Information Type* Upload Document* NDMR, NDAR-1, NDAR-2, NDMLR Summerhouse NDAR & NDMR April 2023.pdf 3.35MB PDF Only Please upload one PDF containing all applicable monitoring reports (i.e., NDMR, NDAR-1, NDAR-2, NDMLR, GW-59). Confirmation Email Address: * sjones@onwasa.com Name of Submitter: * Sherry Jones Signature: Date of submittal: 5/24/2023 This will be filled in automatically Initial Review Reviewer: Wanda.Gerald Is the project number correct?* W00029945 Is the monitoring report accepted?* Yes NO Regional Office* Wilmington Reviewer: _anonymous Review Date: 6/15/2023