Peck, Kaitlin
From:Farkas, Jim J
Sent:Monday, January 30, 2023 3:10 PM
To:shaun@precisioncustomhomesnc.com
Cc:sbrown@4dsitesolutions.com; Lawyer, Mike; Djohnson@harnett.org; Hines, Lee R
Subject:RE: SW6220703 Magnolia Hills Subdivision
Attachments:Cover Letter & Permit 1-30-23.pdf
Good Afternoon,
The Division of Energy, Mineral, and Land Resources (DEMLR), received a complete Stormwater Management Permit
Application for the subject project on November 30, 2023. Staff review of the plans and specifications has determined
that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000 - 1062
rules. We are forwarding Permit No. SW6220703, dated January 30, 2023, for the construction, operation and
maintenance of the subject project and the stormwater system. This permit shall be effective from the date of issuance
and shall be subject to the conditions and limitations as specified therein, and does not supersede any other agency
permit that may be required.
The original signed permit package and approved plans are being mailed to the permittee, Shaun Gardner, at the
following address (NOTE: An electronic version of this permit can be found in our online repository:
https://edocs.deq.nc.gov/WaterResources/Browse.aspx?id=494276&dbid=0&repo=WaterResources):
Galt Land Development, LLC
Attn: Shaun Gardner, Manager
206 Shoreline Drive
Raeford, NC 28376
I will hold onto our hard copies of these projects for 30 days (in case any issues/typos with the permit are noticed and
corrections need to be made) after which point, they will be kept on file at the Fayetteville Regional Office. If you have
any questions, or need additional information concerning this matter, please contact Jim Farkas at
jim.farkas@ncdenr.gov.
Thank you,
Jim Farkas
State Stormwater Engineer
North Carolina Department of Environmental Quality
Office: (919) 707-3646
Jim.farkas@ncdenr.gov
1
From: Tran, Kieu M <kieu.tran@ncdenr.gov>
Sent: Wednesday, July 13, 2022 4:12 PM
To: shaun@precisioncustomhomesnc.com; sbrown@4dsitesolutions.com
Cc: Farkas, Jim J <Jim.Farkas@ncdenr.gov>; Lawyer, Mike <mike.lawyer@ncdenr.gov>
Subject: SW6220703 Magnolia Hills Subdivision
Good afternoon,
We received your post-construction stormwater permit application for the above mentioned project on 7/5/2022.
Reviews under the standard permitting process generally take 45 calendar days, but can take up to 90 calendar days per
statute (our other reviewer, Corey Anen, no longer works for the State, so this review may exceed 45 days). Please
upload all documents that you mailed into our office through the link provided below. Be sure to choose the Central
Office as the Primary Contact office.
https://edocs.deq.nc.gov/Forms/SW-Supplemental-Upload
IMPORTANT NOTE: Please ensure that each file is uploaded under its appropriate file type. Additional file types can be
entered into the electronic form by clicking on the “Add Another Post-Construction File Upload” link directly below the
“State Stormwater Information Uploads” section of the form. Please do not upload entire plan sets through this form,
but rather upload the relevant individual sheets under the appropriate file type. Selecting the correct file type ensures
that the files are properly named in the electronic repository and it helps expedite the review process.
Please type in permit #: SW6220703
If you have any questions, please contact Jim Farkas Jim.Farkas@ncdenr.gov 919-707-3646.
Thank you,
Mrs. Kieu Tran
Stormwater Program Administrative Assistant
Office: (919) 707- 3640
Kieu.Tran@ncdenr.gov
North Carolina Department of Environmental Quality
Division of Energy, Mineral, and Land Resources Stormwater Program
512 N. Salisbury Street, Raleigh, NC 27604 (location)
1612 Mail Service Center, Raleigh, NC 27699-1612 (mailing)
Website: http://deq.nc.gov/about/divisions/energy-mineral-land-resources/stormwater
Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed