Loading...
HomeMy WebLinkAboutNCG140251_2023 DMR_20230421 NCDEQ Division of Energy, Mineral and Land Resources Wastewater Discharge Monitoring Report (DMR) Form for NCG140000 Ready-Mixed Concrete Click here for instructions Complete,sign,scan and submit the DMR via the Stormwater NPDES Permit Data Monitoring Report(DMR) Upload form within 30 days of receiving sampling results. Mail the original,signed hard copy of the DMR to the appropriate DEMLR Regional Office. Mailed in DMRs must contain an original wet signature. Electronic signatures will not be accepted for mailed in DMRs.This is a requirement until the permittee has registered for eDMR for reporting. 1 Certificate of Coverage No. NCG140251 Person Collecting Samples:Nicholas Murphrey Facility Name: Carolina Sunrock-RDU Concrete Laboratory Name: Eurofins Facility County: Wake Laboratory Cert.No.: 269 Discharge during this period:❑■ Yes ❑ No (if no,skip to signature and date) Has your facility implemented mandatory Tier response actions for any benchmark exceedances? ■❑Yes ❑ No If so,which Tier(I, II,or Ill)? A copy of this DMR has been uploaded electronically via https://edocs.deq.nc.gov/Forms/SW-DMR ■❑Yes ❑ No Date Uploaded: Part A:Analytical Monitoring Requirements for Outfalls with Industrial Activities—Effluent Limits in(Red) Parameter Parameter Outfall Outfall Outfall Outfall Outfall Code N/A Receiving Stream Class B; NSW _ f — N/A Date Sample Collected MM/DD/YYYY 03/02/2023 82220 Daily Flow Rate in cfs(50%of 7Q10 — for HQW/ORW) , C0530 TSS in mg/L(30,20,or 10*) 42.4 Settleable Solids in HQW,ORW,SA, 0- 00545 SB,Tr&PNA(5 mL/L) 00400 pH in standard units(6.0-9.0 p.2 freshwater,6.8-8.5 saltwater) O Non-Polar Oil&Grease in mg/L(N/A. ■0 00552 but samples above 15 require tierer responses) " Outfalls to Outstanding Resource Waters(ORW),High Quality Waters(HQW)have a TSS limit of ,outfalls to Trout Waters(Tr)and Primary Nursery Areas(PNA)have a TSS limit of 10 mg/L.All other water classifications have a benchmark of . Notes(optional):TSS of sample taken onMarch 2.20234unng a 0.72 rainfall event was tested to be 42.4 moll in eaceedance of the process water permt limit All other parameters were WOW the benchmark limits.The noncompliant sample can be attnbuted to runoff from upstrear "I certify by my signature below,under penalty of law,that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,true,accurate, and complete.I am aware that here are significant penalties for submitting false information,including the possibility of fines and imprisonment for knowing v' la ions." 4/21/2023 Signature of t ttee or Delegated Authorized Individual Date Carolina Sunrock—RDU Concrete eDMR NCG140251 and RDU Asphalt eDMR NCG160246 for WW Sample Taken Q1 2023 at Stormwater Pond Outfall 001 Action Plan to Reduce TSS Below Benchmark Limits in NPDES General Stormwater Permit (both plants drain to this outfall): TSS of sample taken on March 2, 2023 during a 0.72" rainfall event was tested to be 42.4 mg/I in exceedance of the process water permit limit.All other parameters were below the benchmark limits. The non-compliant sample can be attributed to runoff from upstream roads draining into our site through our site exit carrying sediments and depositing them in our asphalt plant and concrete plant areas. These sediments comingled with sediments from plant wash down into our concrete weir and subsequently to our SW Pond could be contributing to this elevated TSS reading; our action plan is underway to propose the installation of a new water bar/speed bump across our exit driveway to divert offsite stormwater into the City's SW pipe under our site,as well as increase the frequency of our concrete weir cleanouts to reduce TSS in the SW Pond.This action plan will be completed by the end of Q2.