Loading...
HomeMy WebLinkAboutSW6200404_Attached Image 2_20230614 GSB Wet Pond - Volume Main Pool Project: SOF GSB TEMF Basin Descripti Wet Pond - Main Pool Contour Contour Depth Incremental Cumulative Incremental Cumulative Elevation Area (ft) Volume Volume Volume Volume (sq. ft) Avg. End Avg. End Conic Conic (cu. ft) (cu. ft) (cu. ft) (cu. ft) 237 14,654.00 N/A N/A 0 N/A 0 238 16,259.00 1 15457 15457 15450 15450 239 17,920.00 1 17090 32546 17083 32532 240 19,937.00 1 18929 51475 18920 51452 241 21,411.00 1 20674 72249 20670 72122 242 23,242.00 1 22327 94475 22320 94442 243 25,129.00 1 24186 118661 24179 118621 wni.m,nr-¢vo,m mzdmi s- �mmn, — o �m An�mm mu Wmdo„ Hen 41onO OIL - D / LUII44 ► IOS IV 0I OrmA , [2ro l0 _ 4 x rwa 5 s t re an n t at comp ies W4 Generales 16 Does the SCM fcllaW the tlevice specific MDC7 Ves 17 Was the SUM designed by an NC licensed professional? as WET POND MCC FROM 02N .1053 181 Method used HRT 19 Has a stage/storage table been provided in the calculations? Yes Elevation of the excavated main pool depth (bottom of sediment 20 removal) (fmsl) 236.00 21 Elevation of the main pool bottom{top of sediment removal) (fmsl) 237.00 22 Elevation of the bottom Of the vegetated shelf (fmsl) 243.00 23 Elevation of the permanent pool (fmsl) 242.50 24 Elevation of the top of the vegetated shelf (tonal) 244.00 25 Elevation of the temporary pool (fmsl) 245.50 26 Surface area of the main permanent pool (square feel) 24185:1 27 Volume of the main permanent pool (cubic feet) 118621 ct 28 Average depth of the main pool (feet) 6.00 It 29 Average depth equation usetl Equation 2 30 If using equation 3, main pool perimeter (feet) 31 If using equation 3, vntlth of submerged veg. shelf (feet) 32 Volume of the forebay (cubic feet) 18930 cl 33 Is this 15-20% of the volume in the main pool? Yes 34 Clear-out depth for forebay (inches) 12 in 35 Design volume of SCM (cu ft) 100831 cf 36 Is the outlet an orifice or a "0 Orifice