HomeMy WebLinkAbout510048_Compliance Evaluation Inspection_20230609j 0 Division of Water Resources
Facility Number - ® 0 Division of Soil and Water Conservation
0 Other Agency
Type of Visit: rRoutine
liance Inspection Operation Review 0 Structure Evaluation 0 Technical Assistance
Reason for Visit: 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access
Date of Visit: Arrival Time: Jo oa Departure Time: J1 : 3 o County: , A�SiO,J Region:
Farm Name: _0/14Ky 7•-/L).... Owner Email: N)- 3 7IL Z- �4t(s -/
t - t r
Owner Name: , j T Phone: ql y • 2 Z z-
Mailing Address:
Physical Address: 4 17Z �1 rJ � P,� 14A0 ✓E RI AlGrN G /-) J ,kV V r
Facility Contact:
Onsite Representative:
Certified Operator:
Back-up Operator:
Location of Farm:
Design Current
Swine Capacity Pop.
Wean to Finish
Wean to Feeder
Feeder to Finish
1.+{ p
_
Farrow to Wean
Farrow to Feeder
Farrow to Finish
Gilts
Boars
Other
Title:
Latitude:
Phone:
Integrator: fKE_�-TA6-€
Certification Number:
Certification Number:
Design Current
Wet Poultry Capacity Pop.
La er
Non -La er
Design Current
Dry Poultry Capacity Pon.
Layers
Non -La ers
Pullets
Turkeys
Turkey Poults
Other
Discharges and Stream Impacts
I. Is any discharge observed from any part of the operation?
Discharge originated at: ❑ Structure ❑ Application Field ❑ Other:
a. Was the conveyance man-made?
b. Did the discharge reach waters of the State? (If yes, notify DWR)
c. What is the estimated volume that reached waters of the State (gallons)?
Longitude:
Design Current
Cattle Capacity Pop.
Dairy Cow
Dairy Calf
Dai Heifer
Dry Cow
.Non -Dairy
Beef Stocker
Beef Feeder
Beef Brood Cow
❑ Yes ❑ No ❑ NA ❑ NE
❑ Yes
❑ No
❑ NA
❑ NE
❑Yes
❑No
❑NA
❑NE
d. Does the discharge bypass the waste management system? (If yes, notify DWR)
2. Is there evidence of a past discharge from any part of the operation?
3. Were there any observable adverse impacts or potential adverse impacts to the waters
of the State other than from a discharge?
❑ Yes
❑ No
❑ NA
❑ NE
❑ Yes
D No
❑ NA
❑ NE
[]Yes
❑ No
❑ NA
❑ NE
Page 1 of 3 511212020 Continued
Facilit Number: Y I - 4 $ jDate of Inspection:
Waste Collection & Treatment
4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes ❑ No ❑ NA ❑ NE
a. If yes, is waste level into the structural freeboard? []Yes ❑ No ❑ NA ❑ NE
Structure I Structure 2 Structure 3 Structure 4
Structure 5
Structure 6
Identifier: LA&,oe2 ,I l
Spillway?:
Designed Freeboard (in): ,r
Observed Freeboard (in):
5. Are there any immediate threats to the integrity of any of the structures observed?
❑ Yes
❑ No
❑ NA
❑ NE
(i.e., large trees, severe erosion, seepage, etc.)
6. Are there structures on -site which are not properly addressed and/or managed through a
❑ Yes
❑ No
❑ NA
❑ NE
waste management or closure plan?
If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat,
notify DWR
7. Do any of the structures need maintenance or improvement?
❑ Yes
❑ No
❑ NA
❑ NE
8. Do any of the structures lack adequate markers as required by the permit?
❑ Yes
❑ No
❑ NA
❑ NE
(not applicable to roofed pits, dry stacks, andlor wet stacks)
9. Does any part of the waste management system other than the waste structures require
❑ Yes
❑ No
❑ NA
❑ NE
maintenance or improvement?
Waste Application
10. Are there any required buffers, setbacks, or compliance alternatives that need
❑ Yes
❑ No
❑ NA
❑ NE
maintenance or improvement?
11. Is there evidence of incorrect land application? If yes, check the appropriate box below.
[:]Yes
❑ No
❑ NA
❑ NE
❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.)
❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate ManurelSludge into
Bare Soil
❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application
Outside of Approved Area
12. Crop Type(s):
13. Soil Type(s):
14. Do the receiving crops differ from those designated in the CAWMP?
❑ Yes
❑ No
❑ NA
❑ NE
15. Does the receiving crop and/or land application site need improvement?
[] Yes
❑ No
❑ NA
❑ NE
16. Did the facility fail to secure and/or operate per the irrigation design or wettable
❑ Yes
❑ No
❑ NA
❑ NE
acres determination?
17. Does the facility lack adequate acreage for land application?
❑ Yes
[] No
❑ NA
[] NE
18. Is there a lack of properly operating waste application equipment?
❑ Yes
[] No
❑ NA
❑ NE
Required Records & Documents
19. Did the facility fail to have the Certificate of Coverage & Permit readily available?
❑ Yes
❑ No
❑ NA
❑ NE
20. Does the facility fail to have all components of the CAWMP readily available? If yes, check
❑ Yes
[] No
❑ NA
❑ NE
the appropriate box.
❑ WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other:
21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes ❑ No
❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers
❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1 " Rainfall Inspections
22. Did the facility fail to install and maintain a rain gauge? ❑ Yes ❑ No
23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? []Yes ❑ No
❑ NA ❑ NE
❑ Weather Code
❑ Sludge Survey
❑ NA ❑ NE
❑ NA ❑ NE
Page 2 of 3 511212020 Continued
z3
Facility Number: j - Date of Inspection:
24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes 0 No ❑ NA ❑ NE
25. is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes ❑ No ❑ NA ❑ NE
the appropriate box(es) below.
❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels
❑ Non -compliant sludge levels in any lagoon
List structure(s) and date of first survey indicating non-compliance:
26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes ❑ No ❑ NA ❑ NE
27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ❑ No ❑ NA ❑ NE
Other Issues
28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document
and report mortality rates that were higher than normal?
29. At the time of the inspection did the facility pose an odor or air quality concern?
If yes, contact a regional Air Quality representative immediately.
30. Did the facility fail to notify the Regional Office of emergency situations as required by the
permit? (i.e., discharge, freeboard problems, over -application)
31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below.
❑ Application Field ❑ Lagoon/Storage Pond ❑ Other:
32. Were any additional problems noted which cause non-compliance of the permit or CAWMP?
33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative?
34. Does the facility require a follow-up visit by the same agency?
❑ Yes ❑ No ❑ NA ❑ NE
❑ Yes ❑ No ❑ NA ❑ NE
❑ Yes ❑ No ❑ NA ❑ NE
❑ Yes ❑ No ❑ NA ❑ NE
[:]Yes [:]No
❑ Yes [:]No
❑ Yes ❑ No
❑ NA ❑ NE
❑NA ❑NE
❑ NA ❑ NE
Comments (refer to question #): Explain any YES answers and/or any additional recommendations or any other comments.
Use drawings of facility to better explain situations (use additional pages as necessary).
.slob Gc 5tt It v
a
i�RSit �-
L
b
n�
Reviewer/Inspector Name-
Reviewer/Inspector Signature:
Page 3 of 3
curtis.tyree@ncdenr.gov
work cell: 919-810-2691
Phone: IH-7g I - Y2 Sl
Date: 2 - 2-,3
511212020