HomeMy WebLinkAbout510046_Compliance Evaluation Inspection_20230605GrDivision of Water Resources
Facility Number 1 - ® O Division of Soil and Water Conservation
O Other Agency
Type of Visit: 0 Com Hance Inspection Operation Review O Structure Evaluation O Technical Assistance
Reason for Visit: Routine O Complaint O Follow-up 0 Referral Q Emergency O Other O Denied Access
Date of Visit: s`' 2-3 1 Arrival Time: Departure Time: / Z _ oA rk County:' Region: qxo
Farm Name: _. AAJ,6! (rC feAR Owner Email:
Owner Name:/ % C .S�t C ��O Phone:
Mailing Address:
Physical Address: )el. CD.d iL 0AX
Facility Contact: Title: Phone:
Onsite Representative: Integrator:
Certified Operator: Certification Number:
Back-up Operator: Certification Number:
Location of Farm: Latitude: Longitude:
Swine
Design Current Design Current
Capacity Pop. Wet Poultry Capacity Pop.
La er
Non -La er
Wean to Finish
Wean to Feeder
Feeder to Finish
Farrow to Wean
GO 'q
► D
Farrow to Feeder
Farrow to Finish
Gilts
Boars
Other
Non-L
Pullets
Other
Poults
Design Current
Design Current
Cattle Capacity Pop.
Dairy Cow
Dairy Calf
Dairy Heifer
Dry Cow
.Non -Dairy
Beef Stocker
Beef Feeder
Beef Brood Cow
OWN
Dischar es and Stream Impacts
1. Is any discharge observed from any part of the operation?
❑ Yes
ENo
❑ NA
❑ NE
Discharge originated at: ❑ Structure ❑ Application Field ❑ Other:
a. Was the conveyance man-made?
❑ Yes
❑ No
NA
❑ NE
b. Did the discharge reach waters of the State? (If yes, notify DWR)
❑ Yes
❑ No
Ej NA
❑ NE
c. What is the estimated volume that reached waters of the State (gallons)?
d. Does the discharge bypass the waste management system? (If yes, notify DWR)
❑ Yes
❑ No
NA
❑ NE
2. Is there evidence of a past discharge from any part of the operation?
❑ Yes
No
❑ NA
❑ NE
3. Were there any observable adverse impacts or potential adverse impacts to the waters
❑ Yes
/ No
❑ NA
❑ NE
of the State other than from a discharge?
Page I of 3 511212020 Continued
Facility Number: ,S - Date of Inspection:
Waste Collection & Treatment
4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate?
❑ Yes
EfNo
❑ NA
❑ NE
a. If yes, is waste level into the structural freeboard?
❑ Yes
❑ No
E--NA
❑ NE
Structure I Structure 2 Structure 3 Structure 4
Structure 5
Structure 6
Identifier: /
Spillway?: pl
Designed Freeboard (in):
Observed Freeboard (in):
5. Are there any immediate threats to the integrity of any of the structures observed?
❑ Yes
No
❑ NA
❑ NE
(i.e., large trees, severe erosion, seepage, etc.)
6. Are there structures on -site which are not properly addressed and/or managed through a
[] Yes
No
❑ NA
❑ NE
waste management or closure plan?
If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR
7. Do any of the structures need maintenance or improvement? ❑ Yes ]� o ❑ NA ❑ NE
8. Do any of the structures lack adequate markers as required by the permit? [] Yes No ❑ NA ❑ NE
(not applicable to roofed pits, dry stacks, and/or wet stacks)
9. Does any part of the waste management system other than the waste structures require [:]Yes eNo ❑ NA ❑ NE
maintenance or improvement?
Waste Application
10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes No ❑ NA [] NE
maintenance or improvement?
11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes dNo ❑ NA ❑ NE
❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.)
❑ PAN [] PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil
❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area
12. Crop Type(s):
13. Soil Type(s):
14. Do the receiving crops differ from those designated in the CAWMP?
❑ Yes o
❑ NA
❑ NE
15. Does the receiving crop and/or land application site need improvement?
❑ Yes WVo
❑ NA
❑ NE
16. Did the facility fail to secure and/or operate per the irrigation design or wettable
❑ Yes o
❑ NA
❑ NE
acres determination?
17. Does the facility lack adequate acreage for land application?
❑ Yes l �J °
❑ NA
❑ NE
18. Is there a lack of properly operating waste application equipment?
❑ Yes No
❑ NA
❑ NE
Required Records & Documents
19. Did the facility fail to have the Certificate of Coverage &Permit readily available?
❑Yes
❑ NA
❑ NE
20. Does the facility fail to have all components of the CAWMP readily available? If yes, check
❑ Yes rNo
❑ NA
❑ NE
the appropriate box.
❑WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements
❑Other:
21. Does record keeping need improvement? If yes, check the appropriate box below.
❑ Yes Ej No
❑ NA
❑ NE
❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis
❑ Waste Transfers
❑ Weather Code
❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey
22. Did the facility fail to install and maintain a rain gauge?
[:]Yes o
❑ NA
❑ NE
23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment?
❑ Yes No
❑ NA
❑ NE
Page 2 of 3 511212020 Continued
Facility Number: $ - Date of Inspection: I, 5e - 2- 3
24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes ❑ No
25. Is the facility out of compliance with permit conditions related to sludge? if yes, check [:]Yes ❑ No
the appropriate box(es) below.
❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels
❑ Non -compliant sludge levels in any lagoon
List structure(s) and date of first survey indicating non-compliance:
26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes EJ�No
27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes VfNo
Other Issues
28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document
and report mortality rates that were higher than normal?
29. At the time of the inspection did the facility pose an odor or air quality concern?
If yes, contact a regional Air Quality representative immediately.
30. Did the facility fail to notify the Regional Office of emergency situations as required by the
permit? (i.e., discharge, freeboard problems, over -application)
31, Do subsurface tile drains exist at the facility? If yes, check the appropriate box below.
❑ Application Field ❑ Lagoon/Storage Pond ❑ Other:
32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes [3 No ❑ NA ❑ NE
33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? [] Yes ED"No ❑ NA ❑ NE
34. Does the facility require a follow-up visit by the same agency? ❑ Yes No ❑ NA ❑ NE
Comments (refer to question #): Explain any YES answers and/or any additional recommendations or any other comments.
Use drawings of facility to better explain situations (use additional pages as necessary).
3
.51LL,b AG SKRJiy �1a yz) 0.
I.,, I-P- 5
z.
Aal , .'�,O{f' M FPM
GeaA* 1,tAl' - sgtfi g0"t
qOp, -7 8 irP
s)hs-� ��kr ys;s - �- z� 2-3 -
y-zt-x3 - 1..1
❑ NA ❑ NE
❑ NA ❑ NE
❑ NA ❑ NE
❑ NA ❑ NE
J1�c 1a7����t=s
Reviewer;'Inspector Name:
Reviewer,'Inspector Signature:
Page 3 of 3
[:]Yes Ef No ❑ NA ❑ NE
[:]Yes
0No
❑ NA
❑ NE
[:]Yes
ONo
❑ NA
❑ NE
❑ Yes ffNo ❑ NA ❑ NE
Phone: 911491- 0 39
Date: z 3
511212020