HomeMy WebLinkAbout20230839 Ver 1_Site Plan_20230613 (2) kA RIPARIAN BUFF
project Name/address�lL7. s-1,1 s5,
s
Owner, , . 1,.
�#e
Print � .
l rlrrx 49,
The ara r v l is for the urge and design descrie::Ik
y r xp lrcat I �aa s rat irvd€` tad kn the
ppiication is a violAtion of the Buffer Ptuie. site:specffik should be dt-4 in the ppl;cation t5A NCAC
H .O506 and 1 A NCAC 028.f 243(g)j
T,ret%are not aiivived to be rerr* ved from Zone I of the 8ciffer (within 30 ft of the full pond elevation), uniess
a pe d. Ex�ticsn,those trees that are s ere y undermined alongthe i me at shoreline can be removed.
M, ,nimal shapir�and slo izlg on ,the il71 +�"�IatE'shire<Ine is allowed., [tsA 1� C t� .0��#31611
Bee lin . r di In the buffer, not 1 �. Ir ssi disturbance of r r wYer. J15 NCAC- _0243(6)j
Beaches, €rtt erviotved
patios',i� zs at�1 ,etc.are not allowed in tie buffer ur l s s it3 ally a ro
y the Division. There are lira iOn faze f demos. [3SA NCAC .Q'�43$4� and f
Work to be conducted from lam mU-g irtdicatc an access and indicate any trees that Are to be removed. The
work corridor should be described The appfoved Access corridor shall be restof ed. Stating spo-il, construction
material m-u t be outside the b ffef_I15A NCAC 02H .0502 and 15A NCAc€2e.#3 43 (4), 16),j8jj
st r vat+t r cannot be +ed ��eted fr r direct di�ar�e to tf lade, All constsucted storm ater
, f are € st l at a r to t on *n r schar8ed p "to e eo th t f#er directed ci f`f ° or
hW,flow at non-erosive velars t ttm take. 115A NCAC 0 ,0. 3 .
(611
A it wkdgerr nt ii t
There .tate that;i have�n inf red of the Catawba
1, .Ica r s�f Lally saved in tie application and approved
Riparian 8uf'fer Rule. Any r conducted frt�bkuffer,
be
by the ivition of Water Resources DWR),is a violation and subject to en vrcerr�ent. Clue diligence will
taken .uch that the construct ion will be built with n substantial compliance, �rrd rrient of xt����Water
c LualitY certification and luffer iRut ,the approved plan(s) and s eifi t'on(O, a ether sou tttr
�'erial �. r
, tu _