HomeMy WebLinkAbout20230839 Ver 1_Site Plan_20230613 La ke d
(At Fail Pond/Normal Water Level) "Y
Cammon►� 1• G�
Flog 9
Full Pond/ ,5r5 Llow X !aa° 00fnirnu-(`'Aq
\Z)COJ ramp
Normal Water Level rn.
Shoreline
X IaC)
1 act' �een�h
l
hOUS2.
i
1 _
Please approximately sketch the following information on this plan, length of Shoreline
(provide dimensions for each item,such as loft x too ft)*:
1. All proposed vegetation clearing
2. Location of rip rap or fill to be placed above the Full Pond/(Normal Water Level elevation
I Location of rip rap or fill to be placed below the Full Pond/!Normal Water Level elevation
4. Location of any proposed structures such as buildings, retaining walls, docks, etc.
5. Location of any excavation or dredging below the Full Pond/Normal Water Level elevation
6. Location of construction access corridors
FORM;SSGP 10-2013 Page 3 of 3