Loading...
HomeMy WebLinkAbout20230831 Ver 1_Agent Authorization_20230613 Pray Na rte)uddraeVAAA :� srint :7 iartatu . Ccl7it'aC�JrI?rgA/lt: ?�nt - re l �e aoQraval is for the purpose and design described In your application. Impacts not Indicated In tip: appircation is 8 vlolatton of the Buffer Rule_Site specift work should be provided in`the application. j1SA NCA- 02 H .0506 and 15A:NCAC 02B.0z43(8]] -yeas are not allowed to be removed from Zone 1 of the Sufffer jwithln 30 ft of the full pane eleirtIon), unless approved. Excapt'.on,thosatreas that sm severely undermined along:frig Immediate shoreline can be removed. Mfnlmal shaoing and sloping alongthe irsmediate shoreline is allowed. (15A NCAC 028.0243t'S j Benching, ;riding in the buffer Is not allowed. Ercers':e disturbance of ground cover_VISA NCAC 028.0243 (6)] oasd•,es,impervious patios,impervious:walkways,e`c.sre not allowed In the buffer unlea specM, caliy approved by tie Division. There are Urnttatton on size for docks. (_SA NCAC 028 .0243(4) and (6)) 4`dork;o be conducted from land must indicate an a•cess and indicste arn'treas that are to be removed. The work corridor should be described.The approved access corridor sh=11 be restore::. frill, constrvctler. material must be outsidethe buffer. (15A NCAC 02N.0502 and 15A I ICAC 02B.0243 '4), (5), (81) Storm water cannot bs piped or cnannsled for dire discherya to tie 12ke. All conssruLcted stor rrvAmter discharga_s must be at the natiral alatir*tfon and discharged prior to anteing the buffer directed es di use or sheet flow at non-eresrva velocides ro the take. (15h NCAC 02B.0243(S), (6j) AckrioMgdgament of Notifrcatfon hs-+ahustate that I hava been inforrm:ed cfttie Cataiwba Nparlan buffer Rule. Any Whorl:eonducftd ir the buffer, not spectftcailu stated in the application and :pprovad by the Division of Water Resources (LWRI, is a vioteton and subject tic enforcement Due diligence wtl! be `taken such thatthe construction will be buiitwithin substantlaJ compliance and interTt of the 401 Water Quallty Certification and Buffer Rules,the approved plan(s) and specification(s),and other supporting �t aterias. . signature(owns , 0m: 3