HomeMy WebLinkAbout20230830 Ver 1_Agent Authorization_20230613 QJMM RIPARM EFF R Mj1FK&MN FORM
ArOlad Narnaladdr4tgs.M Gl linty: �r
print __ 5ig —-
CoI1irAC�Ir(8gtli�t: '
Print Sfgnat
The aapraval is for tha purpose and design desmbed In your apoilcatlon. tmpec:s not indlcated in the
epplication is a violation of the Buffer Rule.31tespecMc work should be provided in the appilation. jaSA NCRC
02H .C506 and 15A NCAC 023.d243(8)?
Treaa are not allowed to be removed from Zone I of the Buffer(wrthin3C-t oft;�efull pond Nevesion), unless
aoproveC. Etccaption,thase tress that are severely undermined alongthe immedfstesho-eRne can be ramovec_
Minimal shaping and sloping along the frrimediate shoreline is allowed. [15A NCAC 028.024+3(6il
9enching,grad(ng fn the buff s not allowed.Eimusive disturbance of hound eovar.(15A NCAC 028.0243(6)7
UsChss,Impervieus oetio=,rmpervious walkwEys,etc are notallouted intne buffer unlessspecl?caliy?pprov--d
aythe Division. 'i'here are Ifmitatlon on siz=_fordacks. (15A NCACG2B.0Z43{4)and (5)'
Work to be conducted ,-Mm land must indlcats an access and fndicsta any tress that are to be removed. T',e
work corridor should be descrf'bed.The approved access corridor shall be restored.SYging,spoil, comtruct+et
msterfal must be outslde the buffer. , 5A NCAC G2H.0502 and 15A NICAC 02B.G24` i4, [51, (8i
Stormwatar ca�,not be piped or channeled for dYact discnnrjo to Via lake. Ah construz"M5 rrnwatt
drscharps must be at the rstursi elevation ■nd discharged prior to arrtaring the buffer directed as dif/usa G
rhastflow art non-croffiva varodtres to the lekn. WA NCAC 028 A243(5), {6)_1
A ckn c w)adgement of Not:gwtlon
'. Y-�_ � /A� her=by sate that r' h=_ve baen Infa,". Pd of the Catawba
Riparian Buffer huge. l::ny worts conducted in the barffer, not spedflcaIIy s a—zed in tha application and approved
by►the Olvision of Water Resources(OWR), is a violation and sub)actto enforcement. Due dlllgence Will be
talcen such thattrie canstrucdon will be bulltwlthin substan1dal compliance and intent ofti ie 401 Water
Quality:efificutian and Buffer Rules,the approved plan(s) and saeci1catlon(s), and othersupportns
materla;s.
Signature (ow n �� C�:$ �01 Z 3