Loading...
HomeMy WebLinkAboutSW1230501_Soils/Geotechnical Report_20230612BUNNELL. LAMMIMS E n w N rt E R INC, Client: Davis Civil Solutions Project: Verner Day Care Facility Location: 2586 Riceville Road, Asheville, NC 28805 Specialty - Field Observation Report#. 002 Report Date: 01/12/2023 Project #: 19164-01 Permit #-. Time Spent: 3 hrs Travel Time: 0.75 14rs Standby Time: 2.25 Hrs FIELD DATA Weather; Sunny, partly cloudy, wane Field Activity Date: 01/09/2023 SUNEVIARY OF WORK PERFORMED Hand auger down to find water table Remarks: The undersigned was onsite to perform a check of the seasonal high water table under the storm water detention system located at the entrance to the facility. A hand auger boring was advanced in at the location shown on the attached figure. The ground water in the boring was observed at a depth of 97' below the top of the system (2118S). based on this elevation the groundwater elevation was observed to be 2108.8'. This was 27below the installed bottom of the system at 2111 .5', The seasonal high water table (SHWT) is most likely lower than this as the area received .31 inches of rain in the previous 24 his before samolina. Based on this information the SHWT is more than likely greater than Ybelow the bottorn of the current system. Report Copied to: Gary Davis Representative / Inspecton Ryan Crowell This item has been electronically signed by Sam Interlicchia, on 01/12/2023 1213 PM. Bunnell Lanimons Engineering Inc. fl.� 0"'St"niopi(A of this document are not considered signed and seated and the signature must be verified on any electronic copies. No , As min%nied. a 1('rrcscntzldvr° From ow conipurly ivrkedon site as sdie&ded and pell'ornlcd 111C 911ovetc5l ilie specific log itioiLs nuIeJ rtnd do not replesQnt any otiier lucation fzeporls May not b,° reproduced except in full, \%ilfioui pei-inissioll, 130 Oval Road Suite 2001 Arden I North Carolina 128704 littps://ivAviv,])Iecorp,cotii/ Phone (828) 277-0100 Page I of 2 IM I BUNNELL Specialty- Field Observation W LAM M OWS 191 M ENGINFERINS Report ft: 002 Client: Davis Civil Solutions Report Date: 01/12/2023 Project: Verner Day Care Facility Project 19164-01 Location- 2586 Riceville Road, Asheville, NC 28805 Permit Time Spent: 3 hrs Travel Tirne: 0,75 Hrs Standby Time: 2,25 Hrs Field Report Is] 130 Oval Road Suite 200 1 Arden I North Carolina 128704 littps:/Im,i-%v.blecorp.com/ Phone (828) 277-0100 Page 2 of 2 B2- 35'39W 0z 0 ;u CD TI A \ 0 & � } \ . \ � ` \� � ti k\ In ( ) 00 w 0 0or -0 C) CD }A CD C: 0 (D 82- 35'27'W a)4= 3WX0 31NO720 3940740 3940760 WC780 9P 3.536" W 0 cf) 0 ON z 0 0 82- 3,5'27'W 0 z 0 w X M :3 W > m m a 0 ;2u' 0 11 E Fl 110 0 11 oa w > z 0 n C) m :3 w > m z 0 0 C) gi m � > Q Q 5' Fl aCD CL (D U3 < m 0 or (D 0 -n 0 m a 0 O r 0 m > CL 0 CD n, 0 du of 0 3 w 3: CL cs CD j, 0 --1 K) 0 (n 2 (n co S�, 7 > 11 -a ZZ 0 * co 0 CD o El -0 CD 3' (D 5 g no < o - :� (0 a Lh =� m 11 o C, C) , 0 CL a' 2� 0) �o w CD 0 c > (D '< a c: 0 C W w :3 -In -W CL 0 D 0� m S, c CL c) FT o 0 ol CD nL (D w (D 1) ID > 0 E m C Co F,- CD 0 �! = -0 ID U) 0 C)CS..0 co cr D) (D 0Djr . 3 C� W 0 :3 a 0 En 0 N) (D (D B :1 o (D (D CD C-7 CD C) zmr R p 0 > 't C) (D 0 r- -o 73 c , 0 CD w 0) - m 0 (D 0 0 D- cr o :3 ID w C) u 3 o =r 0 CF �3 a, Q) a < 0 z > W -, s! (hCU CX ID CL :0, (D ro ;:� K) zy Z cy :� 0 (D M G-) (D :3 �T ,.CD cD > C) UO) :3 0 (D om co 9. (D �k 0 U m 3 (D jo 0 �J- CD ID 0- (P --A 0 CD 9 N) 0 -0 oj (D 5 0 0 cn CD 0. 0 0 a f 0 * (� CD ci (D w z n 0 X 0 z 6) 0 z 0 Hydrologic, Soil Group. --Buncombe County, North Carolina Hydrologic Soil Group Verner HSG wrap Map unit symbol Map unit name Elating Acres in AO I Percent of AOI Ct C � Clifton -Urban land B -� � 1.0 _ 16.8% complex, 8 to 15 percent slopes CuD LL Difton-Urban land B .. 0.2 3.3% complex, 15 to 30 percent slopes ExD Evard-Cowee-Urban B 1.6 27.9% land complex, 15 to 30 percent slopes 1 TaC . Tate loam, basin, 8 to 15 B 0.4 7.6% percent slopes Ud Udorthents, loamy C 2.6 44.5% Totals for Area of Interest 5.8 ` 104.0°/4 L S�1 Natural Resources Web Soil Survey 3/30/2023 Conservation Service National Cooperative Soil Survey Page 3 of 4 Hydrologic Soil Group —Buncombe COUnty, North Carolina Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long -duration storms. The soils in the United States are assigned to four grOUPS (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture, These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink -swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas, Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff: None Specified Tie -break Rule.- Higher Verner HSG map us[),\ Natural ReSOUrces Web Soil Survey 313012023 Conservation Service National Cooperative Soil Survey Page 4 of 4