HomeMy WebLinkAboutBridge 480179_Iredell Co_DWR Scoping CommentsROY COOPER Governor ELIZABETH S. BISER Secretary RICHARD E. ROGERS, JR. Director MEMORANDUM NORTH CAROLINA Environmental Quality June 13, 2023 To: Jimmy Terry, Project Manager, TGS Engineers on behalf of NCDOT Division 12 Oterry-%r^engineers.com) From: Dave Wanucha, NC Division of Water Resources, Transportation Permitting Branch �J� 6/13/2023 Subject: Comments on proposed replacement of Bridge 480179 on Fort Dobbs Road (SR 1930) over Fourth Creek in Iredell County. Reference correspondence dated June 8, 2023, in which you requested comments for the referenced project. Preliminary analysis of the project reveals the potential for impacts to streams and jurisdictional wetlands in the project. More specifically, impacts to: Stream Name River Basin Stream Classifications Stream Index Number 303(d) Listing Fourth Creek Yadkin Pee Dee C 12-108-20 No Further investigations at a higher resolution should be undertaken to verify the presence of other streams and/or jurisdictional wetlands in the area. If any jurisdictional areas are identified, the Division of Water Resources requests that NCDOT consider the following environmental issues for the proposed project. Project Specific Comments: General Project Comments: Future documentation, including the 401 Water Quality Certification Application, shall continue to include an itemized listing of the proposed wetland and stream impacts with corresponding mapping. 2. Environmental impact statement alternatives shall consider design criteria that reduce the impacts to streams and wetlands from storm water runoff. These alternatives shall include road designs that allow for treatment of the storm water runoff through BMPs as detailed in the most recent version of the North Carolina Department of Transportation Stormwater Best Management Practices Toolbox manual, such as grassed swales, buffer areas, preformed scour holes, retention basins, etc. 3. In accordance with the Environmental Management Commission's Rules (15A NCAC 21-1.0506[c]), mitigation will be required for impacts of greater than 300 linear feet to any perennial stream. If mitigation is required, the mitigation plan shall be designed to replace appropriate lost functions and values. The North Carolina Division of Mitigation Services may be available for assistance with stream mitigation. teo E� North Carolina Department of Environmental Quality I Division of Water Resources 512 North Salisbury Street 11617 Mail Service Center I Raleigh, North Carolina 27699-1617 919.707.9000 4. In accordance with the Environmental Management Commission's Rules (15A NCAC 2H.0506[c]), mitigation will be required for impacts of greater than one tenth acre to wetlands. If mitigation is required, the mitigation plan shall be designed to replace appropriate lost functions and values. North Carolina Division of Mitigation Services may be available for assistance with wetland mitigation. 5. NCDWR is very concerned with sediment and erosion impacts that could result from this project. NCDOT shall address these concerns by describing the potential impacts that may occur to the aquatic environments and any mitigating factors that would reduce the impacts. 6. NCDOT is respectfully reminded that all impacts, including but not limited to, bridging, fill, excavation and clearing, and rip rap to jurisdictional wetlands, streams, and riparian buffers need to be included in the final impact calculations. These impacts, in addition to any construction impacts, temporary or otherwise, also need to be included as part of the 401 Water Quality Certification Application. 7. Where streams must be crossed, NCDWR prefers bridges be used in lieu of culverts. However, we realize that economic considerations often require the use of culverts. Please be advised that culverts should be countersunk to allow unimpeded passage by fish and other aquatic organisms. Moreover, in areas where high quality wetlands or streams are impacted, a bridge may prove preferable. When applicable, NCDOT should not install the bridge bents in the creek, to the maximum extent practicable. 8. Bridge deck drains shall not discharge directly into the stream. Stormwater shall be directed across the bridge and pre-treated through site -appropriate means (grassed swales, pre -formed scour holes, vegetated buffers, etc.) before entering the stream. Please refer to the most recent version of the North Carolina Department of Transportation Stormwater Best Management Practices Toolbox manual for approved measures. 9. Sediment and erosion control measures should not be placed in wetlands or streams 10. Borrow/waste areas should avoid wetlands to the maximum extent practical. Impacts to wetlands in borrow/waste areas will need to be presented in the 401 Water Quality Certification and could precipitate compensatory mitigation. 11. The 401 Water Quality Certification application will need to specifically address the proposed methods for stormwater management. More specifically, stormwater shall not be permitted to discharge directly into streams or surface waters. Please refer to the most recent version of the North Carolina Department of Transportation Stormwater Best Management Practices Toolbox manual for approved measures. 12. If temporary access roads or detours are constructed, the site shall be graded to its preconstruction contours and elevations. Disturbed areas shall be seeded or mulched to stabilize the soil and appropriate native woody species shall be planted. When using temporary structures, the area shall be cleared but not grubbed. Clearing the area with chain saws, mowers, bush -hogs, or other mechanized equipment and leaving the stumps and root mat intact allows the area to re -vegetate naturally and minimizes soil disturbance. 13. Unless otherwise authorized, placement of culverts and other structures in waters and streams shall be placed below the elevation of the streambed by one foot for all culverts with a diameter greater than 48 inches, and 20 percent of the culvert diameter for culverts having a diameter less than 48 inches, to allow low flow passage of water and aquatic life. Design and placement of culverts and other structures including temporary erosion control measures shall not be conducted in a manner that may result in dis-equilibrium of wetlands or streambeds or banks, adjacent to or upstream and downstream of the above structures. The applicant is required to provide evidence that the equilibrium is being maintained if requested in writing by NCDWR. If this condition is unable to be met due to bedrock or other limiting features encountered during construction, please contact NCDWR for guidance on how to proceed and to determine whether or not a permit modification will be required. 14. If multiple pipes or barrels are required, they shall be designed to mimic natural stream cross section as closely as possible including pipes or barrels at flood plain elevation, floodplain benches, and/or sills may be required where appropriate. Widening the stream channel should be avoided. Stream channel widening at the North Carolina Department of Environmental Quality I Division of Water Resources a:E 512 North Salisbury Street 11617 Mail Service Center I Raleigh, North Carolina 27699-1617 919.707.9000 inlet or outlet end of structures typically decreases water velocity causing sediment deposition that requires increased maintenance and disrupts aquatic life passage. 15. Sediment and erosion control measures sufficient to protect water resources must be implemented and maintained in accordance with the most recent version of North Carolina Sediment and Erosion Control Planning and Design Manual. 16. All work in or adjacent to stream waters shall be conducted in a dry work area. Approved BMP measures from the most current version of NCDOT Construction and Maintenance Activities manual such as sandbags, rock berms, cofferdams and other diversion structures shall be used to prevent excavation in flowing water. 17. Heavy equipment should be operated from the bank rather than in stream channels in order to minimize sedimentation and reduce the likelihood of introducing other pollutants into streams. This equipment shall be inspected daily and maintained to prevent contamination of surface waters from leaking fuels, lubricants, hydraulic fluids, or other toxic materials. 18. Riprap shall not be placed in the active thalweg channel or placed in the streambed in a manner that precludes aquatic life passage. Bioengineering boulders or structures should be properly designed, sized and installed. 19. Riparian vegetation (native trees and shrubs) shall be preserved to the maximum extent possible. Riparian vegetation must be reestablished within the construction limits of the project by the end of the growing season following completion of construction. Thank you for requesting our input at this time. NCDOT is reminded that issuance of a 401 Water Quality Certification (or applicable General Certification) requires that appropriate measures be instituted to ensure that water quality standards are met, and designated uses are not degraded or lost. If you have any questions or require additional information, please contact Dave Wanucha at (336) 403-5655 or Dave.Wanucha@ncdenr.gov. Electronic copy: File Q7: > North Carolina Department of Environmental Quality I Division of Water Resources a:E 512 North Salisbury Street 11617 Mail Service Center I Raleigh, North Carolina 27699-1617 919.707.9000