HomeMy WebLinkAboutNCC231694_NOI Application_20230613 Action History (UTC-05:00)Eastern Time(US&Canada)
Submit by Anonymous User 6/1/2023 7:11:53 AM (NCG01 NOI Submission)
Approve by Brooklyn.Broussard 6/1/2023 11:49:45 AM(Review-NOI 144106 Brunswick Forest Phase 3(Sec 4B))
• The task was assigned to DEMLR NCG01 NOI Review Team.The due date is:June 6,2023 5:00 PM
6/1/2023 7:12:05 AM
• The task was assigned to Brooklyn.Broussard by round robin distribution 6/1/2023 7:12:05 AM
Submit by Tev.Holloman 6/13/2023 11:30:30 AM (Payment Verification for NCC231694)
•Hanover Design Services PA
• The task was assigned to DEMLR NCG01 Payment Team.The due date is:July 13,2023 5:00 PM
6/1/2023 11:50:09 AM
• Tev.Holloman assigned the task to Tev.Holloman 6/13/2023 11:29:08 AM
applicationConstruction Stormwater: Notice of Intent (NOI)
National Pollutant Discharge Elimination System(NPDES)
General Permit 1 OOOO:STORMWATER DISCHARGES associated with construction activities
NORTH CAROUNA
Environmental Quality
A. Project Information
Part A.
Project Location and Waterbody Information
...................................................................................................................................................................................................................................................................................................................................................................................................
Are you submitting an NOI that was rejected before?
No
Yes
1a. Project Name*
Brunswick Forest Phase 3(Sec 4B)
1b.Specific Lot Numbers
This field may be used to list specifc lot numbers.
1c.Parcel ID Number(s)(PIN)
List all PINs associated with this project.
0580000758
2.County*
Brunswick
3.Highway or Street Address*
Collingwood Drive
Street name only is acceptable if no address number assigned yet
4.City or Township*
Leland
5.State* NC
6.Zip Code* 28451
7. Latitude* Enter the latitude in decimal degrees
34.1675
8. Longitude* Enter the longitude in decimal degrees(MUST be negative)
-78.0168
If you do not know the latitude and longitude coordinates for this project,you can search the location on this map of North
Carolina. Look for the coordinates in the bottom left corner.
9. Date to Begin* 05/25/2023
Estimated Construction Project Start Date
10.Date to End* 05/31/2026
Estimated Construction Project End Date
11.SIC(Primary)*
Residential,Single Family Houses(SFE)(1521)
Standard Industrial Classification for Development
12.Acres to be 366.00
disturbed* (including off-site borrow and waste areas)
13.Total site area 366.00
(acres)*
14. Post-construction 4.60
impervious area (Estimated)
(acres)*
Project Tracking ID NCC-BRUNS-2023-Brunswick Forest Phase 3(Sec 4B)
Assigned automatically(not used)
Below you must enter waterbody information for surface waters affected by this project. Please consult
DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please enter
only immediate receiving waterbodies-not waters downstream of those unless the project extends there. You may enter
up to 3 waterbodies if needed.
15a.Receiving Waterbody*
Mallory Creek
Name of waterbody into which stormwater runoff will discharge
15b.Waterbody Index No.*
18-78
NC Waterbody Index Number
Stormwater discharges will flow to additional waters*
No
Yes
15c.Additional Receiving Waterbody
Cape Fear River
Waterbody name
15d.Waterbody Index No.
18-(71)
NC Waterbody Index Number
15e.Additional Receiving Waterbody
Waterbody name
15f.Waterbody Index No.
ascheib@hdsilm.com
NC Waterbody Index Number
16a.Is this project subject to the NC Sediment Pollution Control Act?*
Yes
No, not subject to NC SPCA
17. Is this project funded with ARPA(American Rescue Plan Act)grant funds?
No
Yes
This question was added to the eNO1 on 1/26/2023 and will not be answered in applications submitted prior to that date.
B. Permittee Information
Part B.
Permittee Information-Legally Responsible Entity and Individual
......................................................................................................................................................................
Important:The person who signs the NOI Certification Form and signs the Certification in Section E of this application
form must be the same person as listed in THIS SECTION,or an authorized responsible individual within the same
organization. That person must be a responsible corporate officer who owns or operates the construction activity,such as
a president,secretary,treasurer,or vice president,or a manager that is authorized in accordance with Part IV,Section B,
Item(6)of the NCG010000 General Permit. For more information on signatory requirements,see Part IV,Section B,
Item(6)of that permit.
1. Permittee*
Legally Responsible Entity
Funston Land and Timber LLC
If permittee is an individual,enter first and last name in this field.Otherwise,enter organization/business name.
Note: If the permittee is a business,the business must be registered with the INC Secretary of State.You can verify the
registration here. Permittee must be the same entity that is responsible for the land-disturbing activity as listed on the NC
SPCA Financial Responsibility/Ownership(FRO)Form.
2. First Name* Allen
If Corporation,enter Registered Agent First Name
3. Last Name* Earp
If Corporation,enter Registered Agent Last Name
3b.Title Manager
4. Permitee E-mail Address*
jearp@brunswickforest.com
5. Permittee Telephone No.*
910-383-1425
6. Permittee Mailing Address*
Street Address
1007 Evangeline Drive
Address Line 2
City State/Province/Region
Leland INC
Postal/Zip Code Country
28451-7992 us
Check box if the street address the same as mailing address
Yes
7. Permittee Street Address*
Street Address
1007 Evangeline Drive
Address Line 2
City State/Province/Region
Leland NC
Postal/Zip Code Country
28451-7992 us
B.Type of Ownership*
Ownership is only individual if an individual is named in B.1.above.
Non-Government
C. Site Contact Information
Part C.
Project Site Contact Information
................................................................................................................................................................................................................................................................................................................................................................................................
1. Primary Site Contact-First Name*
Reynolds
2. Primary Site Contact-Last Name*
Miars
3.Title
Manager
4.Site Contact E-mail Address*
rmiars@funstonco.com
5.Site Contact Telephone No.*
910-343-3143
6.Organization Name
Funston Company
7.Site Contact Mailing Address*
Street Address
1007 Evangeline Drive
Address Line 2
City State/Province/Region
Leland NC
Postal/Zip Code Country
28451-7992 us
8.Consultant Name
(Optional)
Hanover Design Service, RA
First and Last name
9.Consultant E-mail
ascheib@hdsilm.com
This person will be copied on all correspondence.
10.Consultant Telephone No.
910-343-8002
11. Billing E-mail
(For Annual Fee correspondence)
jearp@brunswickforest.com
Default is legally responsible person e-mail
12. Billing Telephone
(For Annual Fee correspondence)
910-383-1425
Default is legally responsible person telephone
D. E&SC Plan
Part D.
Erosion&Sediment Control(E&SC)Plan Approval Information
......................................................................................................................................................................
1. Date E&SC Plan 05/12/2023
Approved*
2. E&SC Plan Project BRUNS-2005_347
Number/ID* Assigned by agency or local program
3. E&SC Plan State DEQ Office
Approved by* Local Program
4.State DEQ Office* Wilmington(WiRO)
Documentation of E&SC Plan approval and the signed Notice of Intent(NOI)Certification Form is required for a
complete application. Please also upload a site map showing the overall extent of the project(for linear projects,can
include the beginning point and end point coordinates in the"Notes"box below).
5. E&SC Plan PH3SEC4B ECP APPROVE.pdf 242.19KB
Approval letter or Must be PDF format
Grading Permit
6.Signed FRO Financial Responsibility/Ownership Form
Signed Financial Responsiblity Form.pdf 1.53MB
Must be PDF format
7.Site Location Map Must be PDF format(limit 20 MB)
PHASE 3 SEC 4B.pdf 172.64KB
Please do not upload entire set of E&SC plans.
B. Notes(Optional) Provide any additional information that might help the reviewer better understand how uploaded documents
support the application.Include additional waterbodies if necessary.
9. NOI Certification PH3SEC4B ENOIOOO.pdf 199.99KB
Form Must be PDF format
This is an Express No
Review Project* Yes
E. Certification
North Carolina General Statute 143-215.613(1)provides that:
Any person who knowingly makes any false statement,representation,or certification in any application,record,report,plan,or other document
filed or required to be maintained under this Article or a rule implementing this Article;or who knowingly makes a false statement of a material
fact in a rulemaking proceeding or contested case under this Article;or who falsifies,tampers with,or knowingly renders inaccurate any recording
or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Article shall
be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars($10,000).
Under penalty of law, I certify that:
* I am the person responsible for the construction activities of this project,for satisfying
the requirements of this permit,and for any civil or criminal penalties incurred due to
violations of this permit.
* The information submitted in this NOI is,to the best of my knowledge and belief,true,
accurate,and complete based on my inquiry of the person or persons who manage the
system,or those persons directly responsible for gathering the information.
* I will abide by all conditions of the NCG010000 General Permit and the approved
Erosion and Sediment Control Plan.
* I hereby request coverage under the NCG010000 General Permit and understand that
coverage under this permit will constitute the permit requirements for the discharge(s)
and is enforceable in the same manner as an individual permit.
Specify if you are:* The Legally Responsible Person named on this Notice of Intent
Authorized Responsible Person'(signing on behalf of Legally Responsible Person
named in Part B)
Important:The person who electronically signs this Certification above must be the same person who signs the NOI
Certification Form. If that person is signing on behalf of the Permittee,that individual must be an authorized responsible
person within the same organization as the Permittee.
'An authorized individual is a responsible corporate officer who owns or operates the construction activity,such as a
president,secretary,treasurer,or vice president,or a manager that is authorized in accordance with Part IV, Section B,
Item(6)of the NCG010000 General Permit. For more information on signatory requirements,see Part IV,Section B,
Item(6)of that permit.
Signature
C%��&F-4v
Type Name* Jeff Earp
Title Manager
Organization Legally Responsible Entity
Funston Land&timber LLC
Date* 06/01/2023
F. Tracking and COC Info
NOI Tracking No. 144106
NC Reference No. NCG01-2023-1694
Indicates NCG01 or NCG25.Uses NOI number until approved,then uses NUMBER incremented by SP(passed
from workflow if eNOI approved)
Certificate of NCC231694
Coverage(COC)No.* Uses NOI number until approved,then uses NUMBER incremented by SP(formatted and passed from workflow if
eNOI approved)
Initial Invoice No. NCC231694-2023
Invoice Due Date 7/1/2023
Initial Fee $ 100.00
Invoice Status OPEN