Mr. William Massie, Finance Officer
Randolph County
725 McDowell Road
Asheboro,North Carolina 27205
Subject: Letter of Intent to Fund
American Rescue Plan Act Earmark
Seagrove/Ulah MWSD: Uwharrie Pump Station
Upfit&Force Main Project
DWI Project No(s).: SRP-W-ARP-0205
Dear Mr. Massie:
The Division of Water Infrastructure(Division)has reviewed your Request for Funding and
determined your project is eligible to receive American Rescue Plan Act(ARPA) funding from the State
Fiscal Recovery Fund(SFRF), established in Session Law(S.L.) 2022-74. Projects funded from the
SFRF must meet applicable federal law and guidance for the ARPA funds. The ARPA project grant will
be one-hundred percent(100%) of eligible project costs, up to a maximum of$2,500,000.
The first milestone is the submittal of a bid-and-design package by May 1, 2023. Please note that
this intent to fund is contingent on meeting all the following milestones:
Milestone Date
Apply for all Necessary Permits* ASAP
Bid-and-Design Package Submittal (obtain all permits) May 1, 2023
Bid-and-Design Package Approval September 1, 2023
Advertise Project, Receive Bids, Submit Bid Information, and January 2, 2024
Receive Authority to Award __
Execute Construction Contract(s) February 1,2024
Receive Last Reimbursement- Statutory December 31, 2026
'An engineering alternatives analysis(EAA)may be required on certain projects.
See:hops://deq.nc.gov/about/divisions/water-resources/water-quality-permitting/npdes-wastewater/permitting-process
Failure to meet any milestone may result in the forfeiture of funding for the proposed project.
Note the Division will make no reimbursements of ARPA funds after December 31,2026.
The State Environmental Policy Act exempts projects funded by the State Reserve (such as this
project) from state-mandated environmental review. Federal requirements may still apply. [North
Carolina General Statute (N.C.G.S.) 113A-12(2)h.]
North Carolina Department of Environmental Quality I Division of Water Infrastructure
0,.; 512N Salisbury Street I tb331viail Service Center I (taleigh North Carolina 27b99 1b33
= " '� 919.707.9160
Mr. Massie
Randolph County
04-Jan-23
Page 2 of 2
Upon detailed review of the project during the funding process, it may be determined that
portions of your project are not eligible for funding.
US Treasury Requirements
Projects with an expected total cost of ten million dollars($10,000,000)or more must meet
US Treasury requirements for prevailing-wage rates, project labor agreements, and related requirements.
Recipients can either certify meeting the requirements or provide plans and reports as the SLFRF
Compliance and Reporting Guidance (treasury.gov)specifies.
We are offering a free,permit-assistance service to address any questions you have about
potential permitting requirements,pitfalls, fees, and timelines. If interested, please complete our online
form at https://deq.nc.gov/permits-rules/permit-assistance-and-guidance/permit-assistance-request-form
and a regional environmental coordinator will contact you. When applying for a permit, attach a copy of
this letter to your permit application. We find this helpful to identify ARPA projects to get your permit
to you faster, to assist with meeting the federal expenditure deadline of December 31, 2026.
If you have any questions,please contact Doug Newhouse by phone at 919.707.9053 or by
e-mail at doug.newhouse@ncdenr.gov.
Sincerely,
Jon Risgaard, Chief
State Revolving Fund Section
cc: Bill Lester, P.E., LKC Engineering, PLLC, Consulting Engineer(Aberdeen NC)
Paxton Arthurs, Staff Engineer, Randolph County Public Works(Asheboro NC)
Ken Pohlig,P.E. (DWI, via e-mail)
Doug Newhouse (DWI, via e-mail)
Mark Hubbard, P.E. (DWI, via e-mail)
ARPA Project File(COM—LOW)