Loading...
HomeMy WebLinkAboutSite inspectionWetland Inspection Report Project Num: 20210345 Version: 2 Status: Issued Project Name: TPB NCDOT - Replace Bridge 3 - Preservation Project Type: Replace bridge with bridge County: Rowajreatment Bridge 8 (B-4626) Region: Winston-Salem Location: TPB NCDOT - Replace Bridge 3 - Preservation Treatment Bride 8 (B-4626) Latitude: +350 30' 28" Longitude: -80' 11' 07" SW Plan Location: Site Owner Name: NC DOT Division 9 Inspection Date: 6/8/2023 Reason for Inspection: Routine Inspection Type: Site Inspection (DOT) Inspection Contact Person: Title: Phone: On -Site Representative(s): Primary Inspector: Dave Wanucha Secondary Inspector(s): Facility Compliance Status: 0 Compliant ❑ Not Compliant Program Areas: 401 (includes isolated/non-404) Question Areas: Permit (401 WQC) Inspection Summary: Phone: 336-776-9703 page 1 Site Number: 20210345 Owner: Tippett, Lyndo Inspection Date: 6/8/2023 Inspection Type: Site Inspection (DOT) Reason for Visit: Routine Permit (401 WOO Yes No NA NE Does the impact(s) match what was approved in the 401 WQC or non 404 permit? 0 ❑ ❑ ❑ Are the culverts and/or filled areas installed properly? 0 ❑ ❑ ❑ Is the site compliant with additional conditions of the 401 WQC or non 404 permit? 0 ❑ ❑ ❑ Comment: The project is partially complete. I met with Div 9 DEO, Roadside and on -site staff to review the project. The bridge has been dismantled but not rebuilt. Instead of a causeway, DOT used barges to station demo equipment. No issues to report. page 2