HomeMy WebLinkAboutSite inspectionWetland Inspection Report
Project Num: 20210345 Version: 2 Status: Issued
Project Name: TPB NCDOT - Replace Bridge 3 - Preservation Project Type: Replace bridge with bridge
County: Rowajreatment Bridge 8 (B-4626)
Region: Winston-Salem
Location: TPB NCDOT - Replace Bridge 3 - Preservation Treatment Bride 8 (B-4626)
Latitude: +350 30' 28" Longitude: -80' 11' 07"
SW Plan Location:
Site Owner Name: NC DOT Division 9
Inspection Date: 6/8/2023
Reason for Inspection: Routine
Inspection Type: Site Inspection (DOT)
Inspection Contact Person: Title: Phone:
On -Site Representative(s):
Primary Inspector: Dave Wanucha
Secondary Inspector(s):
Facility Compliance Status: 0 Compliant ❑ Not Compliant
Program Areas: 401 (includes isolated/non-404)
Question Areas:
Permit (401 WQC)
Inspection Summary:
Phone: 336-776-9703
page 1
Site Number: 20210345 Owner: Tippett, Lyndo
Inspection Date: 6/8/2023 Inspection Type: Site Inspection (DOT) Reason for Visit: Routine
Permit (401 WOO Yes No NA NE
Does the impact(s) match what was approved in the 401 WQC or non 404 permit? 0 ❑ ❑ ❑
Are the culverts and/or filled areas installed properly? 0 ❑ ❑ ❑
Is the site compliant with additional conditions of the 401 WQC or non 404 permit? 0 ❑ ❑ ❑
Comment: The project is partially complete. I met with Div 9 DEO, Roadside and on -site staff to review the
project. The bridge has been dismantled but not rebuilt. Instead of a causeway, DOT used barges to
station demo equipment. No issues to report.
page 2