Loading...
HomeMy WebLinkAbout20201292 Ver 1_Crane_100165_MY0_2023_Combined_DMSResponse_20230612ID#* 20201292 Version* 1 Select Reviewer: Maria Polizzi Initial Review Completed Date 06/12/2023 Mitigation Project Submittal - 6/12/2023 Is this a Prospectus, Technical Proposal or a New Site?* Yes No Type of Mitigation Project:* Stream Wetlands Buffer Nutrient Offset (Select all that apply) Project Contact Information Contact Name: * Email Address: Matthew Harrell matthew.harrell@davey.com Project Information ID#: * 20201292 Version:* 1 Existing ID# Existing Version Project Type: DMS Mitigation Bank Project Name: Crane Mitigation Site County: Lee Document Information Mitigation Document Type:* Mitigation As -Built Plans File Upload: Crane _100165_MYO_2023_Combined_DMSResp... 82.3MB Please upload only one PDF of the complete file that needs to be submitted... Signature Print Name:* Signature: * Matthew Harrell e%w'?em"'r' �;/"'?t till Restoration Systems, LLC 1101 Haynes St. Suite 211 Raleigh, North Carolina Ph: (919) 755-9490 Fx: (919) 755-9492 1101 Haynes St., Suite 211 • Raleigh, NC 27604 • www.restorationsystems.com • Ph 919.755.9490 • Fx 919.755.9492 Response to DMS Comments DMS Project ID No. 100165 Full Delivery Contract No. 0302-01 RFP No. 16-20190302 USACE Action ID No. SAW-2020-01401 DWR Project No. 20201292 DMS Comments Received (Black Text) & Responses (Blue Text) 1. Title Page(s) – The RFP date of issue is incorrect. Please correct to 12/20/2019 or omit the issue date completely. The RFP issue date was corrected. 2. Section 1.1 – 2nd paragraph states site design was completed in February 2023. This should presumably be 2022. The site design completion date was corrected. 3. Table 1 – All original mit plan stream lengths and as-built stream lengths are identical. Please report the actual surveyed lengths in the as-built column. Table was revised to include the surveyed as-built stream lengths. 4. Table 2 – The report is generally using the latest DMS monitoring report template tables. For consistency, please update Table 2 with the latest version of the table. Updating Table 2 would make Section 1.2 and Table C redundant, and those sections could be removed. Table 2 was updated to the latest DMS template, and Section 1.2 (Table A) and Table C were removed. 5. Section 4.0 – For the MY0 report, it would be useful to discuss or list construction deviations (red lines) here, i.e, the vane arm not constructed and the change to seed mix. Construction deviation discussions were added to this section- stream deviation (omitted vane arm) in Section 4.1 and seed mix changes in section 4.3. 6. Were 1m x 1m herbaceous plots proposed in the mit plan completed, or will those begin with MY1? As-built monitoring was performed in February, just after the Site was planted, before significant herbaceous vegetation had established. Herbaceous plots will be surveyed beginning in MY1. 7. Figure 1 – Please differentiate purpose of stream gauges, i.e., crest gauge vs. flow gauge. Figure 1 was updated to differentiate crest gauges from flow gauges. 8. Appendix C – Recommend removing BHR calculation from pool cross sections. BHR calculation was removed from all pool cross-sections. As-Built/Record Drawings: 9. Sheet C5.00 – Please verify whether the riffle at UT1 Sta. 6+94 was surveyed. If not, please survey constructed riffles in the future. Constructed riffles will be surveyed moving forward- we apologize for missing this one. Page 2 of 2 10. Please add in-stream crest and flow gauges to the drawings if they were surveyed (one is shown on Sheet C5.12, but not on any others). Stream gauges are shown in the revised 5/2/23 as-built drawings. 11. Sheet C5.04 & Sheet L2.01 – Gravel access path and bridge are called out in red text. Was this a construction deviation, and if so, what was the deviation? If not, recommend calling out in black. Callouts have been modified to appear black on paper. Site Visit: 12. A small area along the fence line on the left side of the UT1 EII area may not have been planted. Please verify. This area was checked and has been planted. 13. Ditch above start of UT3 is still very deep, and there is concern about its effect on the adjacent re-establishment wetlands. The short section of ditch that remains open is expected to fill with organic material as the site matures and serve as a headwater feature for the surrounding wetlands to the restored stream. This wetland headwater stream transition is observed in the sandhills ecoregion where surrounding wetlands discharge along the toe of slope to headwater forest wetlands found at stream origins. As observed in reference conditions this type of complex maintains wetland hydrology as hydrology discharges at the soil surface along the edges of the depressional feature. We understand the concern for potential effects to adjacent wetland re-establishment assets. Given this type of complex in this ecoregion we propose to visually monitor the area for three years (MY1-3) to evaluate any potential effects to adjacent wetland assets. Annual visual monitoring of this area will include 4 fixed photo points of the ditch and surrounding area to document developments. During MY3 a delineation of the area including a minimum of three wetland delineation forms will be performed to identify any potential areas not meeting wetland re-establishment requirements. MY0 FINAL MONITORING REPORT    CRANE STREAM AND WETLAND MITIGATION SITE  Lee County, North Carolina  Cape Fear River Basin   Cataloging Unit 03030002    DMS Project No. 100165  Full Delivery Contract No. 0302‐01  DMS RFP No. 16‐20190302 (issued 12/20/2019)  USACE Action ID No. SAW‐2020‐01401  DWR Project No. 20201292    Data Collection: December 2022‐February 2023  Submission: April 2023      Prepared for:    NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY  DIVISION OF MITIGATION SERVICES  1652 MAIL SERVICE CENTER  RALEIGH, NORTH CAROLINA 27699‐1652      MY0 FINAL MONITORING REPORT    CRANE STREAM AND WETLAND MITIGATION SITE  Lee County, North Carolina  Cape Fear River Basin   Cataloging Unit 03030002    DMS Project No. 100165  Full Delivery Contract No. 0302‐01  DMS RFP No. 16‐20190302 (issued 12/20/2019)  USACE Action ID No. SAW‐2020‐01401  DWR Project No. 20201292    Data Collection: December 2022‐February 2023  Submission: April 2023    Prepared for:    NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY  DIVISION OF MITIGATION SERVICES  1652 MAIL SERVICE CENTER  RALEIGH, NORTH CAROLINA 27699‐1652        Prepared by:        And        Restoration Systems, LLC Axiom Environmental, Inc.  1101 Haynes Street, Suite 211 218 Snow Avenue  Raleigh, North Carolina 27604 Raleigh, North Carolina 27603  Contact: Raymond Holz Contact: Grant Lewis  919‐755‐9490 (phone) 919‐215‐1693 (phone)  919‐755‐9492 (fax)     Final MY0 Monitoring Report (Project No. 100165) Table of Contents  Crane Stream and Wetland Mitigation Site Restoration Systems, LLC  Lee County, North Carolina April 2023  TABLE OF CONTENTS  1 PROJECT SUMMARY .......................................................................................................................................... 1  1.1 PROJECT BACKGROUND, COMPONENTS, AND STRUCTURE ..................................................................................... 1  2 AS‐BUILT CONDITION (BASELINE) ..................................................................................................................... 5  3 PROJECT MONITORING – METHODS ................................................................................................................ 5  3.1 MONITORING ............................................................................................................................................... 5  4 MONITORING YEAR 0 – DATA ASSESSMENT ..................................................................................................... 6  4.1 STREAM ASSESSMENT .................................................................................................................................... 6  4.2 HYDROLOGY ASSESSMENT .............................................................................................................................. 6  4.3 VEGETATIVE ASSESSMENT ............................................................................................................................... 6  4.4 MONITORING YEAR 0 SUMMARY ..................................................................................................................... 6  5 REFERENCES ...................................................................................................................................................... 7      LIST OF REPORT TABLES  Table 1. Project Mitigation Quantities and Credits ....................................................................................................... 2  Table 2. Summary: Goals, Performance, and Results .................................................................................................... 3  Table 3. Project Attribute Table ..................................................................................................................................... 4  Table A. Monitoring Schedule ....................................................................................................................................... 5      APPENDICES  Appendix A. Visual Assessment Data  ‐ Figure 1. Current Conditions Plan View  ‐ Table 4A‐E. Visual Stream Morphology Stability  Assessment Table  ‐ Table 5. Vegetation Condition Assessment Table  ‐ Vegetation Plot Photographs  ‐ Photo Log    Appendix B. Vegetation Plot Data  ‐ Table 6A. Planted Bare‐Root Woody Vegetation  ‐ Table 6B. Permanent Seed Mix  ‐ Table 7. Vegetation Plot Counts and Densities  ‐ Table 8. Vegetation Plot Data Table from Vegetation  Data Entry Tool    Appendix C. Stream Geomorphology Data  ‐ Cross‐Sections with Annual Overlays  ‐ Longitudinal Profile  ‐ Table 9A‐D. Baseline Stream Data Summary Tables  ‐ Table 10A‐B. Cross‐Section Morphology Monitoring  Summary     Appendix D. Hydrologic Data  ‐ Groundwater Gauge Soil Profiles    Appendix E: Project Timeline and Contact Info  ‐ Table 11. Project Timeline  ‐ Table 12. Project Contacts    Appendix F. Record Drawings (As‐built Survey)  ‐ As‐built Drawings  ‐ As‐built Survey      Final MY0 Monitoring Report (Project No. 100165) Page 1  Crane Stream and Wetland Mitigation Site Restoration Systems, LLC  Lee County, North Carolina April 2023  1 PROJECT SUMMARY  Restoration Systems, LLC has established the North Carolina Division of Mitigation Services (NCDMS)  Crane Stream and Wetland Mitigation Site (Site). The Site is on three land parcels along unnamed  tributaries to Little Crane Creek in the Sandhills Ecoregion of North Carolina. Located in the Cape Fear  River Basin, cataloging unit 03030002, the Site is in the Targeted Local Watershed (TLW) 03030004070010  and North Carolina Division of Water Resources (NCDWR) subbasin number 03‐06‐14. The Site is located  within a Local Watershed Plan (LWP), Hydrology Targeted Resource Area (TRA), and Water Quality TRA  due to modifications/stressors in the watershed. Site hydrology drains to unnamed tributaries and into  Little Crane Creek (Stream Index Number 18‐23‐16‐4), assigned a Best Usage Classification of WS‐III  (NCDWR 2021). Little Crane Creek is not listed on the NCDENR draft 2018 or final 2016 303(d) lists (NCDEQ  2018a, NCDEQ 2018b).  Site watershed sizes range from approximately 0.02 square miles (12.2 acres) on  UT3 to 0.15 square miles (97.5 acres) on UT 1 at the outfall.     1.1 Project Background, Components, and Structure  Located approximately 2 miles southwest of Lemon Springs, 8 miles southwest of Sanford, NC, and west  of Rocky Fork Church Road (SR 1179) in Lee County, the Site encompasses 27.7 acres. Mitigation work  within the Site included 1) stream restoration, 2) stream enhancement (Level II), 3) wetland  reestablishment, 4) wetland rehabilitation, 5) wetland enhancement, and 6) vegetation planting. The Site  is expected to provide 3,533 Stream Mitigation Units (SMUs) and 14.593 Riparian Wetland Mitigation  Units (WMUs) by closeout (Table 1, Page 2). A conservation easement was granted to the State of North  Carolina and recorded at the Lee County Register of Deeds on June 22, 2021.    Before construction, land use at the Site was characterized by livestock pasture and disturbed forest. Site  design was completed in February 2022. Construction started on June 6, 2022 and ended within a final  walkthrough on July 15, 2022. The Site was planted on February 3, 2023. Completed project activities,  reporting history, completion dates, and project contacts are summarized in Tables 11‐12 (Appendix E).                        Space Purposefully Left Blank     Original Mitigation Original Original Original Plan As‐Built Mitigation Restoration Mitigation Project Segment Ft/Ac Ft/Ac Category Level Ratio (X:1) Credits Comments Stream UT 1, Reach 1 694 694 Warm EII 2.5 237.600 Straight‐line valley length used for credit calculation at request of IRT UT 1, Reach 2 (above crossing)1335 1330 Warm R 1.0 1335.000 60 foot easement break for crossing UT 1, Reach 2 (below crossing)267 265 Warm R 1.0 267.000 UT 1, Reach 3 232 233 Warm EII 2.5 93.200 UT 2, Reach 1 437 425 Warm R 1.0 437.000 UT 2, Reach 2 88 88 Warm EII 2.5 35.200 UT 3 463 451 Warm R 1.0 463.000 UT 4 422 414 Warm R 1.0 422.000 UT 5 243 241 Warm R 1.0 243.000 Total: 3533.000 Wetland Wetland Reestablishment 8.815 8.815 R REE 1.00000 8.815 Wetland Rehabilitation 0.683 0.683 R RH 1.50000 0.455 Wetland Enhancement 10.646 10.646 R E 2.00000 5.323 Total: 14.593 Project Credits Riparian Non‐Rip Coastal Warm Cool Cold Wetland Wetland Marsh Restoration 3167.000 0.000 0.000 0.000 0.000 0.000 Re‐establishment 8.815 0.000 0.000 Rehabilitation 0.455 0.000 0.000 Enhancement 5.323 0.000 0.000 Enhancement I 0.000 0.000 0.000 Enhancement II 366.000 0.000 0.000 Creation 0.000 0.000 0.000 Preservation 0.000 0.000 0.000 0.000 0.000 Totals 3,533.000 0.000 0.000 14.593 0.000 0.000 Total Stream Credit 3,533.000 Total Wetland Credit 14.593 Wetland Mitigation Category Restoration Level CM Coastal Marsh P Preservation R Riparian E Wetland Enhancement NR Non-Riparian EII Stream Enhancement II EI Stream Enhancement I C Wetland Creation RH Wetland Rehabilitation REE Wetland Re-establishment R Restoration Table 1. Crane Mitigation Site (ID‐100165) Project Mitigation Quantities and Credits Restoration Level Stream Objective/Treatment Likely Functional Uplift Performance Criteria Measurement Cumulative Monitoring  Results Reconstruct stream channels with appropriate  bankfull dimensions and depth relative to the  existing floodplain. Remove overburden to  reconnect with adjacent wetlands. Dispersion of high flows on the  floodplain, an increase in  biogeochemical cycling within  the system, and recharging of  riparian wetlands. •  The stream shall remain stable, and all other performance  standards shall be met through four separate bankfull events,  occurring in separate years, during the monitoring years 1‐7. 2 crest gauges (pressure  transducers) on UT1 and  UT2, and documentation of  visual/physical evidence of  bankfull events To be determined Construct stream channels that will maintain  stable cross‐sections, patterns, and profiles over  time. Reduction in sediment inputs  from bank erosion, reduction  of shear stress, and improved  overall hydraulic function. •  All streams must maintain an Ordinary High‐Water Mark  (OHWM), per RGL 05‐05. •  Bank height ratio (BHR) cannot exceed 1.2 at any measured  cross‐section. •  BHR at any measure riffle cross‐section should not change by  more than 10% from baseline condition during any given  monitoring period. •  Intermittent streams will demonstrate at least 30‐days  consecutive flow annually. Total of 16 cross‐sections on  restored channels and  surface flow gauges on UT2,  UT3, UT4, and UT5. Site streams are stable,  functioning as designed, and  stream measurements are within  design parameters. Plant native tree and understory species in  riparian zones and plant appropriate species on  streambanks. Reduction in floodplain  sediment inputs from runoff,  increased bank stability,  increased LWD and organic  material in streams, increased •  Within planted portions of the Site, a minimum of 320 stems  per acre must be present at year 3; a minimum of 260 stems  per acre must be present at year 5; and a minimum of 210  stems per acre must be present at year 7. •  Trees must average 7 feet in height at year 5 and 10 feet in  height at year 7 in each plot.  •  Planted and volunteer stems are counted, provided they are  included in the approved planting list for the Site; natural  recruits not on the planting list may be considered by the IRT on  a case‐by‐case basis. Natural recruits can only be counted  toward success after they have been in the ground for 2 years. •  Areas of herbaceous vegetation establishment will have a  minimum of four species present. 17 permenant vegetation  plots, 6 random vegetation  plots, and 3 random  herbaceous plots spread  across the Site All plots meeting performance  criteria during MY0. Herbaceous  plots will be surveyed beginning  MY1 to allow time for herbaceous  vegetation to establish. Reduce channel depth in incised stream  reaches, fill drainage ditches, and alleviate soil  compaction from agriculture activities. Particulate and pollution  conversion, groundwater  storage and reduced  downstream flooding, habitat  diversification, and vegetative  composition conversion.  •  Annual saturation or inundation within the upper 12 inches of  the soil surface for, at a minimum, 12 percent of the growing  season during average climatic conditions. 15 groundwater gauges  spread throughout restored  wetlands To be determined Goal Reconnect channels with floodplains and  riparian wetlands to allow a natural  flooding regime. Restore and enhance native floodplain  and streambank vegetation. Improve stability of stream channels. Restore and enhance groundwater  hydrology to drained or impacted hydric  soil areas. Table 2: Summary: Goals, Performance and Results  Note: Onsite rain data will be collected throughout each monitoring period.  UT 1UT 2UT 3 UT4 UT5 2170 489 345 373 319 2429 525 463 421 243 Rosgen Type VIII and III Rosgen Type VIII and III Rosgen Type VIII Rosgen Type VIII Rosgen Type VIII 97.5 22.6 12.2 13.2 47.4 Perennial Intermittent Intermittent Intermittent Intermittent/Perennial Eg 5G 5Eg 5Eg 5Ge 5 Ce 5Ce 5Ce 5Ce 5Ce 5 III/IV IV IV II/III IV Applicable? Yes Yes Yes Yes No Yes No Historic Preservation Act Existing Evolutionary Stage (Simon and Hupp 1986) Pre‐project (acres) Wetland Summary Information Wetlands 11.330 20.146 Parameters Riparian riverine Parameters Hydric Soil Status Mapped Soil Series Endangered Species Act Regulatory Considerations Water of the United States ‐ Section 401 Water of the United States ‐ Section 404 Yes Yes Reach Summary Information Project Drainage Area Percentage of Impervious Area   Land Use Classification  NCDWR Water Quality Classification Post‐project length of reach (linear feet) Post‐project (acres) Valley Classification & Confinement Drainage Area (acres) Perennial, Intermittent, Ephemeral Existing Morphological Description (Rosgen 1996) WS III Parameters Managed Herbaceous Cover & Hardwood Swamps Resolved? 3030004070010 03‐06‐14 River Basin NCDWR Sub‐basin Pre‐project length of reach (linear feet) 120.1 <2% Project Drainage Area (acres) Table 3. Project Attribute Table Crane Mitigation Site  Lee County, North Carolina 27.66 35.367351ºN, 79.222369ºW Project Name County Project Area (acres)  Project Coordinates (latitude and longitude decimal degrees) Project Watershed Summary Information Sand Hills Cape Fear Yes Supporting Docs? Section 401 Certification Section 404 Permit CE Document CE Document Yes Physiographic Province USGS Hydrologic Unit 14‐digit Wetland Type (non‐riparian, riparian) Wehadkee Hydric Proposed Morphological Description (Rosgen 1996) NA FEMA Mapping Essential Fisheries Habitat  ‐‐ NA  ‐‐  YesFEMA Floodplain Compliance Coastal Zone Management Act (CZMA or CAMA)   Final MY0 Monitoring Report (Project No. 100165) page 5  Crane Stream and Wetland Mitigation Site Restoration Systems, LLC  Lee County, North Carolina April 2023  2 AS‐BUILT CONDITION (BASELINE)  Construction started on June 6, 2022 and ended within a final walkthrough on July 15, 2022. The Site was  planted on February 3, 2023. As‐built and MY0 data collection occurred between January 2023 and February  2023.    In general, no significant issues arose during the construction of the Site. A sealed half‐size set of record  drawings are provided in Appendix F, which includes the post‐construction survey, alignments, structures,  and monitoring features. These include redlines for any significant field adjustments made during  construction that differ from the design plans.    Additional activities that occurred at the Site included the following.   Planting 26.2 acres of the Site with 23,550 stems on February 3, 2023 – planted species are included  in Table 6A (Appendix B).    Applying seed mix across the Site. A species list is included in Table 6B (Appendix B).    3 PROJECT MONITORING – METHODS   Monitoring will be conducted by Axiom Environmental, Inc. Annual monitoring reports of the data collected  will be submitted to the NCDMS by Restoration Systems no later than December 31st of each monitoring  year data is collected. The monitoring schedule is summarized in the following table.    Table A. Monitoring Schedule  Resource Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7  Streams X X X  X  X  Wetlands X X X X X X X  Vegetation X X X  X  X  Visual Assessment X X X X X X X  Report Submittal X X X X X X X      3.1 Monitoring  The monitoring parameters are summarized in Table 2.                     Space Purposefully Left Blank    Final MY0 Monitoring Report (Project No. 100165) Page 6  Crane Stream and Wetland Mitigation Site Restoration Systems, LLC  Lee County, North Carolina April 2023  4 MONITORING YEAR 0 – DATA ASSESSMENT  Annual monitoring and site visits were conducted between October 2022 and February 2023 to assess the  condition of the project. Stream, wetland, and vegetation criteria for the Site follow the approved success  criteria presented in the Mitigation Plan and summarized in Section 1.2; monitoring methods are detailed  in Section 3.0.     4.1 Stream Assessment  Morphological surveys for MY0 were conducted on January 26, 2023. All streams within the Site are stable  and functioning as designed. Refer to Appendix A for the Visual Stream Morphology Stability Assessment  Table and Stream Photographs. Refer to Appendix C for Stream Geomorphology Data. No stream areas of  concern were identified during MY0.    One field adjustment was made during construction that differs from the design plans. A vane arm was  not constructed on a cross vane on UT 1 at the confluence with UT 5. The vane arm would have extended  into the UT 5 streambed, and it was determined in the field to be unnecessary (Sheet C5.02, Appendix F).    4.2 Hydrology Assessment  15 groundwater monitoring gauges were installed throughout the Site’s wetlands. Hydrologic data will be  collected and reported during MY1 (2023).    4.3 Vegetative Assessment  The MY0 vegetative survey was completed on February 8, 2023. Vegetation monitoring resulted in a  sitewide stem density average of 600 planted stems per acre, above the interim requirement of 320 stems  per acre required at MY3. All 23 vegetation plots, including 17 fixed vegetation plots and 6 temporary  vegetation plots, met the interim success criteria. Please refer to Appendix A for Vegetation Plot  Photographs and the Vegetation Condition Assessment Table, and Appendix B for Vegetation Plot Data.  No vegetation areas of concern were identified during MY0.    All twenty planted species were included in the approved Mitigation Plan planting list. Species approved  in the Mitigation Plan were selected based on Reference Forest Ecosystem (RFE) data, on‐site  observations, and community descriptions from Classification of the Natural Communities of North  Carolina (Schafale and Weakley 2012) – Coastal Plain Bottomland Hardwood Forest. Table 6A (Appendix  B) summarizes planted species and their individual quantities in total.    Several changes were made to the Site seed mixes based on seed availability at the time of construction.  Grain Rye (Secale cereale) was omitted from the temporary seed mix, and Brown Top Millet (Urochloa  ramosa) was applied site‐wide instead. In the permanent seed mix, Agrostis perennans, Carex vulpinoidea,  Eupatorium coelestinum, Eupatorium perfoliatum, Juncus effusus, Juncus tenuis, and Lespedeza capitata  were omitted and replaced with equivalent quantities of Eupatorium fistulosum, Panicum  dichotomiflorum, Panicum rigidulum, and Pycnanthemum tenuifolium. See sheet L5.01 (Appendix F) for  details regarding as‐built seed mixes.    4.4 Monitoring Year 0 Summary  Overall, the Site looks good, is performing as intended, and is on track to meet success criteria. All  vegetation plots are on track to exceed the MY3 interim requirement of 320 planted stems per acre, and  all streams within the Site are stable and are meeting project goals.       Final MY0 Monitoring Report (Project No. 100165) Page 7  Crane Stream and Wetland Mitigation Site Restoration Systems, LLC  Lee County, North Carolina April 2023  5 REFERENCES    Lee, M.T., R.K. Peet, S.D. Roberts, and T.R. Wentworth.  2008.  CVS‐EEP Protocol for Recording  Vegetation.  Version 4.2.  North Carolina Department of Environment and Natural Resources,  Ecosystem Enhancement Program.  Raleigh, North Carolina.    North Carolina Department of Environmental Quality (NCDEQ). 2018a. Final 2016 Category 5  Assessments ‐303(d) List (online). Available:  https://files.nc.gov/ncdeq/Water%20Quality/Planning/TMDL/303d/2016/2016_NC_Category_5 _303d_list.pdf (February 4, 2019).     North Carolina Department of Environmental Quality (NCDEQ). 2018b. Draft 2018 North Carolina 303(d)  List (online). Available:  https://files.nc.gov/ncdeq/Water%20Quality/Planning/TMDL/303d/2018/2018‐DRAFT‐NC‐303‐ d‐‐ListwCover.pdf (February 4, 2019).     North Carolina Division of Mitigation Services (NCDMS).  2014.  Stream and Wetland Mitigation  Monitoring Guidelines. North Carolina Department of Environmental Quality, Raleigh, North  Carolina.    North Carolina Interagency Review Team (NCIRT). 2016. Wilmington District Stream and Wetland  Compensatory Mitigation Update. October 24, 2016.    North Carolina Stream Functional Assessment Team.  (NC SFAT 2015).  N.C. Stream Assessment Method  (NC SAM) User Manual. Version 2.1.    North Carolina Wetland Functional Assessment Team.  (NC WFAT 2010).  N.C. Wetland Assessment  Method (NC WAM) User Manual. Version 4.1.    Schafale, M.P. and A.S. Weakley. 2012.  Classification of the Natural Communities of North Carolina:  Fourth Approximation. North Carolina Natural Heritage Program, Division of Parks and  Recreation, North Carolina Department of Environment, Health, and Natural Resources.   Raleigh, North Carolina.   Final MY0 Monitoring Report (Project No. 100165)  Appendices  Crane Stream and Wetland Mitigation Site Restoration Systems, LLC  Lee County, North Carolina April 2023  Appendix A: Visual Assessment Data    Figure 1. Current Conditions Plan View  Table 4A‐E. Visual Stream Morphology Stability Assessment Table  Table 5. Visual Vegetation Condition Assessment Table  Vegetation Plot Photographs  Photo Log    !( !( !( !( !( !( !(!(!( !( !( !( !(!( !( ^_ ## # # # # ^_ ^_ ^_ ^_ ^_ ^_ ^_ ^_ ^_ ^_ ^_ ^_ ^_ ^_ ^_ ^_ ^_ GF GF 1 6 5 4 3 2 XS-8 XS-7 XS-1 XS - 1 2 X S -9 X S - 5 XS-11 XS-2 XS-13 XS-14 X S -1 6 XS-15 XS-6 987 4 6 3 2 1 15 14 13 12 11 10 8 7 6 9 3 5 1 4 2 XS-3 XS-10 XS- 4 11 12 16 14 17 10 13 15 FIGU R E Dra wn b y: Da te: Sca le : Pro jec t N o.: BEF APR 2023 1:2700 20-032 Tit le: Pro jec t: Pre pa red fo r: Lee C ounty, NC CRANEMITIGATIO NSITE CUR RE NTCONDITIONSPLAN VIEW 1 ³ Le g en d Cra n e E a se me nt = 2 7.7 a cStream R es tor atio nStream E nh an cem e nt (Le vel II)Str eam G en era tin g N o Cre di t We tla nd R e-e st ab lis hm e ntWetland R eh ab ilit at ionWetland E nh an ce me ntPermanent Ve ge tat io n P lo ts M ee tin g Su cc es s C ri ter ia (1 7)Te mp or ary Veg et at ion Tra ns ec ts Me et in g S uc ce ss C rit er ia (6 )Cro ss -S ec tio n s (16 ) !(Gr ou nd wa te r G a ug es (1 5) ^_Ra in Ga u ge #Str ea m Fl ow G au ge s (4 ) #Str ea m Cr es t G a ug es (2 ) ^_Ve ge tat io n P lo t O ri gin s GF Per ma ne nt Ph oto Po in ts (2) 0 500 1,00 0250Feet RockyForkChurchRoad N ote : B a se ma p i s a eri al orth oi ma g ery fro m 2 02 1 N C On e Ma p. U T-1 UT-2 UT-3 U T-5 U T -4 Table 4A.  Visual Stream Stability Assessment Reach UT 1, Reach 2 Assessed Stream Length 1602 Assessed Bank Length 3204 Bank Surface Scour/Bare  Bank Bank lacking vegetative cover resulting simply from poor growth  and/or surface scour 0 100% Toe Erosion Bank toe eroding to the extent that bank failure appears likely.   Does NOT include undercuts that are modest, appear sustainable  and are providing habitat. 0 100% Bank Failure Fluvial and geotechnical ‐ rotational, slumping, calving, or collapse 0 100% 0 100% Structure Grade Control Grade control structures exhibiting maintenance of grade across  the sill. 35 35 100% Bank Protection Bank erosion within the structures extent of influence does not  exceed 15%. (See guidance for this table in DMS monitoring  guidance document)  35 35 100% % Stable,  Performing as  IntendedMajor Channel Category Metric Number  Stable,  Performing as  Intended Total Number  in As‐built Amount of  Unstable  Footage                                                                                                                                  Totals   Table 4B.  Visual Stream Stability Assessment Reach UT 2, Reach 1 Assessed Stream Length 437 Assessed Bank Length 874 Bank Surface Scour/Bare  Bank Bank lacking vegetative cover resulting simply from poor growth  and/or surface scour 0 100% Toe Erosion Bank toe eroding to the extent that bank failure appears likely.   Does NOT include undercuts that are modest, appear sustainable  and are providing habitat. 0 100% Bank Failure Fluvial and geotechnical ‐ rotational, slumping, calving, or collapse 0 100% 0 100% Structure Grade Control Grade control structures exhibiting maintenance of grade across  the sill. 19 19 100% Bank Protection Bank erosion within the structures extent of influence does not  exceed 15%. (See guidance for this table in DMS monitoring  guidance document)  19 19 100% Number  Stable,  Performing as  Intended Total Number  in As‐built Amount of  Unstable  Footage % Stable,  Performing as  Intended                                                                                                                                  Totals   Major Channel Category Metric Table 4C.  Visual Stream Stability Assessment Reach UT 3 Assessed Stream Length 480 Assessed Bank Length 960 Bank Surface Scour/Bare  Bank Bank lacking vegetative cover resulting simply from poor growth  and/or surface scour 0 100% Toe Erosion Bank toe eroding to the extent that bank failure appears likely.   Does NOT include undercuts that are modest, appear sustainable  and are providing habitat. 0 100% Bank Failure Fluvial and geotechnical ‐ rotational, slumping, calving, or collapse 0 100% 0 100% Structure Grade Control Grade control structures exhibiting maintenance of grade across  the sill. 22 22 100% Bank Protection Bank erosion within the structures extent of influence does not  exceed 15%. (See guidance for this table in DMS monitoring  guidance document)  22 22 100% % Stable,  Performing as  IntendedMajor Channel Category Metric Number  Stable,  Performing as  Intended Total Number  in As‐built Amount of  Unstable  Footage                                                                                                                                  Totals   Table 4D.  Visual Stream Stability Assessment Reach UT 4 Assessed Stream Length 427 Assessed Bank Length 854 Bank Surface Scour/Bare  Bank Bank lacking vegetative cover resulting simply from poor growth  and/or surface scour 0 100% Toe Erosion Bank toe eroding to the extent that bank failure appears likely.   Does NOT include undercuts that are modest, appear sustainable  and are providing habitat. 0 100% Bank Failure Fluvial and geotechnical ‐ rotational, slumping, calving, or collapse 0 100% 0 100% Structure Grade Control Grade control structures exhibiting maintenance of grade across  the sill. 14 14 100% Bank Protection Bank erosion within the structures extent of influence does not  exceed 15%. (See guidance for this table in DMS monitoring  guidance document)  14 14 100% % Stable,  Performing as  Intended                                                                                                                                  Totals   Major Channel Category Metric Number  Stable,  Performing as  Intended Total Number  in As‐built Amount of  Unstable  Footage Table 4E.  Visual Stream Stability Assessment Reach UT 5 Assessed Stream Length 248 Assessed Bank Length 496 Bank Surface Scour/Bare  Bank Bank lacking vegetative cover resulting simply from poor growth  and/or surface scour 0 100% Toe Erosion Bank toe eroding to the extent that bank failure appears likely.   Does NOT include undercuts that are modest, appear sustainable  and are providing habitat. 0 100% Bank Failure Fluvial and geotechnical ‐ rotational, slumping, calving, or collapse 0 100% 0 100% Structure Grade Control Grade control structures exhibiting maintenance of grade across  the sill. 8 8 100% Bank Protection Bank erosion within the structures extent of influence does not  exceed 15%. (See guidance for this table in DMS monitoring  guidance document)  8 8 100% % Stable,  Performing as  Intended                                                                                                                                  Totals   Major Channel Category Metric Number  Stable,  Performing as  Intended Total Number  in As‐built Amount of  Unstable  Footage Table 5.  Visual Vegetation Assessment Planted acreage 26.2 Bare Areas Very limited cover of both woody and herbaceous material. 0.10 acres 0.00 0.0% Low Stem Density Areas Woody stem densities clearly below target levels based on current MY stem count criteria. 0.10acres 0.00 0.0% 0.00 0.0% Areas of Poor Growth Rates Planted areas where average height is not meeting current MY Performance Standard. 0.10 acres 0.00 0.0% 0.00 0.0% Easement Acreage 27.66 Invasive Areas of Concern Invasives may occur outside of planted areas and within the easement and will therefore be calculated  against the total easement acreage. Include species with the potential to directly outcompete native,  young, woody stems in the short‐term or community structure for existing communities.  Species  included in summation above should be identified in report summary.   0.10 acres 0.00 0.0% Easement Encroachment Areas Encroachment may be point, line, or polygon. Encroachment to be mapped consists of any violation of restrictions specified in the conservation easement. Common encroachments are mowing, cattle access, vehicular access. Encroachment has no threshold value as will need to be addressed regardless of impact area.  none 0 Encroachments noted Combined  Acreage % of Easement  AcreageVegetation Category Definitions Mapping  Threshold % of Planted  Acreage                                                                                                                                                                                                                                                                   Total                                                                                                                                                                 Cumulative Total Vegetation Category Definitions Mapping  Threshold Combined  Acreage Crane Mitigation Site MY0 (2023) Vegetation Monitoring Photographs (taken February 8, 2023) Crane Mitigation Site Appendix A: Visual Assessment Data MY0 Monitoring Report – February 2023 Plot 7 Plot 1 Plot 2 Plot 3 Plot 4 Plot 5 Plot 6 Plot 8 Crane Mitigation Site MY0 (2023) Vegetation Monitoring Photographs (taken February 8, 2023) Crane Mitigation Site Appendix A: Visual Assessment Data MY0 Monitoring Report – February 2023 Plot 15 Plot 9 Plot 10 Plot 11 Plot 12 Plot 13 Plot 14 Plot 16 Crane Mitigation Site MY0 (2023) Vegetation Monitoring Photographs (taken February 8, 2023) Crane Mitigation Site Appendix A: Visual Assessment Data MY0 Monitoring Report – February 2023 Plot 17 Crane Mitigation Site As-Built (2023) Photo Log Photo 1: CCPV Permanent Photo Point 1 UT 1 Crossing, facing upstream MY0 (2023) Monitoring Report (Project No. 100165)Appendices Crane Mitigation Site Stream and Wetland Mitigation Site Restoration Systems, LLC Photo 2: CCPV Permanent Photo Point 2 UT 1 Crossing, facing downstream Crane Mitigation Site As-Built (2023) Photo Log Photo 3: Easement Fencing MY0 (2023) Monitoring Report (Project No. 100165)Appendices Crane Mitigation Site Stream and Wetland Mitigation Site Restoration Systems, LLC Photo 4: West of GW-10 facing East within the easement Crane Mitigation Site As-Built (2023) Photo Log Photo 5: UT-1 facing North MY0 (2023) Monitoring Report (Project No. 100165)Appendices Crane Mitigation Site Stream and Wetland Mitigation Site Restoration Systems, LLC Photo 6: UT-2 facing West Crane Mitigation Site As-Built (2023) Photo Log MY0 (2023) Monitoring Report (Project No. 100165)Appendices Crane Mitigation Site Stream and Wetland Mitigation Site Restoration Systems, LLC Photo 8: Wetland GA near UT-2 and UT-4 confluence Photo 7: UT-2 facing Southeast Crane Mitigation Site As-Built (2023) Photo Log Photo 9: UT-4 facing South MY0 (2023) Monitoring Report (Project No. 100165)Appendices Crane Mitigation Site Stream and Wetland Mitigation Site Restoration Systems, LLC Photo 10: UT-3 facing South Crane Mitigation Site As-Built (2023) Photo Log Photo 11: GW-8 MY0 (2023) Monitoring Report (Project No. 100165)Appendices Crane Mitigation Site Stream and Wetland Mitigation Site Restoration Systems, LLC Photo 12: UT-1 Log Vanes Crane Mitigation Site As-Built (2023) Photo Log Photo 13: Easement Signage MY0 (2023) Monitoring Report (Project No. 100165)Appendices Crane Mitigation Site Stream and Wetland Mitigation Site Restoration Systems, LLC   Final MY0 Monitoring Report (Project No. 100165)  Appendices  Crane Stream and Wetland Mitigation Site Restoration Systems, LLC  Lee County, North Carolina April 2023  Appendix B: Vegetation Data    Table 6A. Planted Bare‐Root Woody Vegetation  Table 6B. Permanent Seed Mix  Table 7. Vegetation Plot Counts and Densities  Table 8. Vegetation Plot Data Table from Vegetation Data Entry Tool   Final MY0 Monitoring Report (Project No. 100165)  Appendices  Crane Stream and Wetland Mitigation Site Restoration Systems, LLC  Lee County, North Carolina April 2023  Table 6A. Planted Bare Root Woody Vegetation  Crane Stream and Wetland Mitigation Site  Vegetation Association  Coastal Plain  Bottomland Hardwood  Forest*  Coastal Plain Small  Stream Swamp* Stream‐side Assemblage** TOTAL  Area (acres) 8 15.4 2.8 26.2  Species Indicator  Status  #  planted* % of total # planted* % of total # planted** % of total # planted  Swamp black gum (Nyssa biflora) OBL 0 0.0% 1000 9.5% 0 0.0% 1000  Bald cypress (Taxodium distichum) OBL 500 9.2% 1000 9.5% 0 0.0% 1500  Tupelo gum (Nyssa aquatica) OBL 0 0.0% 1000 9.5% 0 0.0% 1000  Black gum (Nyssa sylvatica) FAC 500 9.2% 1000 9.5% 700 9.2% 2200  Silky dogwood (Cornus amomum) FACW 0 0.0% 0 0.0% 1500 19.7% 1500  Sweetbay (Magnolia virginiana) FACW 0 0.0% 1000 9.5% 0 0.0% 1000  Red bay (Persea borbonia) FAC 250 4.6% 500 4.8% 0 0.0% 750  River birch (Betula nigra) FACW 500 9.2% 500 4.8% 1500 19.7% 2500  Hackberry (Celtis occidentalis) FACW 300 5.5% 500 4.8% 400 5.3% 1200  American elm (Ulmus americana) FACW 300 5.5% 500 4.8% 800 10.5% 1600  Tulip poplar (Liriodendron tulipifera) FAC 300 5.5% 500 4.8% 800 10.5% 1600  Sycamore (Platanus occidentalis) FACW 300 5.5% 500 4.8% 800 10.5% 1600  Swamp chestnut oak (Quercus michauxii) FACW 300 5.5% 500 4.8% 0 0.0% 800  Water oak (Quercus nigra) FAC 500 9.2% 300 2.9% 400 5.3% 1200  Laurel oak (Quercus larifolia) FACW 300 5.5% 500 4.8% 0 0.0% 800  Cherrybark oak (Quercus pagoda) FAC 200 3.7% 0 0.0% 400 5.3% 600  Willow oak (Quercus phellos) FACW 300 5.5% 500 4.8% 0 0.0% 800  Shumard oak (Quercus shumardii) FACW 300 5.5% 500 4.8% 0 0.0% 800  Shagbark hickory (Carya ovata) FACU 300 5.5% 0 0.0% 0 0.0% 300  Bitternut hickory (Carya cordiformis) FAC  300 5.5% 200 1.9% 300 3.9% 800  TOTAL 5450  10500  7600  23550  * Planted at a density of 680 stems/acre.  ** Planted at a density of 2720 stems/acre.    Final MY0 Monitoring Report (Project No. 100165)  Appendices  Crane Stream and Wetland Mitigation Site Restoration Systems, LLC  Lee County, North Carolina April 2023  Table 6B. Permanent Seed Mix  Crane Stream and Wetland Mitigation Site  Temporary Seed (Erosion and Sediment Control)  Species Application Rate Application Date Notes  Urochloa ramosa (Brown Top Millet) 40 lbs. per acre May ‐ September All disturbed soil      Permanent Seed‐ Sitewide @ 2lbs /acre  Latin Species Common Name Indicator %  Agrostis hyemalis Winter bentgrass FAC 3  Bidens aristosa Bur‐marigold FACW 0.6  Carex albolutescens Greenwhite Sedge FACW 2  Carex lupulina Hop Sedge OBL 2  Chamaecrista fasciculata Partridge Pea FACU 6  Chamaecrista nictitans Sensitive Pea FACU 3  Coreopsis lanceolata Lance‐leaved Coreopsis NI 5  Coreopsis tinctoria Plains Coreopsis FAC 5  Desmodium canadense Showy ticktrefoil FAC 5  Echinacea purpurea Coneflower NI 5  Elymus virginicus Virginia Wildrye FACW 7  Eupatorium fistulosum Joe Pye Weed FACW 0.1  Helianthus angustifolius Narrowleaved Sunflower FACW 2  Heliopsis helianthoides Oxeye sunflower UPL 5  Hibiscus moscheutos Crimsoneyed rosemallow OBL 0.1  Liatris spicata Marsh Blazing Star FAC 0.1  Monarda fistulosa Wild Bergamot FACU 1  Panicum anceps Beaked panicgrass FAC 5  Panicum clandestinum Deertongue FAC 10  Panicum dichotomiflorum Smooth panicgrass FACW 8  Panicum rigidulum Redtop Panicgrass FACW 2  Pycnanthemum tenuifolium Narrowleaf mountainmint FACW 0.1  Rudbeckia hirta Black eyed Susan FACU 5  Senna hebecarpa Wild Senna FAC 2  Tridens flavus Purpletop FACU 10  Verbena hastata Blue vervain FACW 6       Final MY0 Monitoring Report (Project No. 100165)  Appendices  Crane Stream and Wetland Mitigation Site Restoration Systems, LLC  Lee County, North Carolina April 2023  Table 7. Planted Vegetation Totals  Laurel Springs Stream and Wetland Mitigation Site  Plot # Planted Stems/Acre Success Criteria Met?  1 405 Yes  2 526 Yes  3 648 Yes  4 607 Yes  5 607 Yes  6 607 Yes  7 486 Yes  8 607 Yes  9 324 Yes  10 526 Yes  11 688 Yes  12 607 Yes  13 445 Yes  14 526 Yes  15 607 Yes  16 607 Yes  17 729 Yes  R‐1 607 Yes  R‐2 729 Yes  R‐3 607 Yes  R‐4 364 Yes  R‐5 891 Yes  R‐6 1053 Yes  Average Planted Stems/Acre 600 Yes  https://ncdms.shinyapps.io/Veg_Table_Tool Table 8. Vegetation Plot Data Table from Vegetation Data Entry Tool 26.2 2023-02-04 NA 2023-03-15 2023-03-15 0.0247 Planted Total Planted Total Planted Total Planted Total Planted Total Planted Total Planted Total Planted Total Planted Total Planted Total Betula nigra river birch Tree FACW 1 1 1 1 2 2 Carya cordiformis bitternut hickory Tree FAC 1 1 Carya ovata shagbark hickory Tree FACU 1 1 Celtis occidentalis common hackberry Tree FACU Cornus amomum silky dogwood Shrub FACW Liriodendron tulipifera tuliptree Tree FACU 1 1 3 3 3 3 Magnolia virginiana sweetbay Tree FACW 1 1 1 1 3 3 1 1 Nyssa aquatica water tupelo Tree OBL 1 1 5 5 1 1 1 1 1 1 3 3 1 1 1 1 2 2 Nyssa sylvatica blackgum Tree FAC 1 1 1 1 2 2 2 2 1 1 2 2 1 1 4 4 Persea borbonia redbay Tree FACW 7 7 Platanus occidentalis American sycamore Tree FACW 2 2 1 1 3 3 3 3 3 3 4 4 Quercus alba white oak Tree FACU Quercus laurifolia laurel oak Tree FACW 2 2 3 3 4 4 1 1 2 2 Quercus michauxii swamp chestnut oak Tree FACW 1 1 1 1 1 1 1 1 2 2 1 1 1 1 1 1 Quercus nigra water oak Tree FAC 2 2 1 1 1 1 Quercus pagoda cherrybark oak Tree FACW 3 3 1 1 5 5 1 1 1 1 1 1 Quercus phellos willow oak Tree FACW 1 1 Quercus rubra northern red oak Tree FACU 2 2 1 1 Quercus shumardii Shumard's oak Tree FAC 2 2 1 1 1 1 2 2 Taxodium distichum bald cypress Tree OBL 1 1 3 3 2 2 5 5 2 2 Ulmus americana American elm Tree FAC Sum Performance Standard 10 10 13 13 16 16 15 15 15 15 15 15 12 12 15 15 8 8 13 13 10 13 16 15 15 15 12 15 8 13 405 526 648 607 607 607 486 607 324 526 6 8 7 8 6 9 7 8 4 7 30 38 44 20 33 27 33 20 62 31 1 0 0 0 1 1 1 0 1 1 0 0 0 0 0 0 0 0 0 0 10 13 16 15 15 15 12 15 8 13 405 526 648 607 607 607 486 607 324 526 6 8 7 8 6 9 7 8 4 7 30 38 44 20 33 27 33 20 62 31 1 0 0 0 1 1 1 0 1 1 0 0 0 0 0 0 0 0 0 0 Dominant Species Composition (%) Average Plot Height (ft.) Post Mitigation Plan Performance Standard % Invasives 1). Bolded species are proposed for the current monitoring year, italicized species are not approved, and a regular font indicates that the species has been approved. 2). The "Species Included in Approved Mitigation Plan" section contains only those species that were included in the original approved mitigation plan. The "Post Mitigation Plan Species" section includes species that are being proposed through a mitigation plan addendum for the current monitoring year (bolded) , species that have been approved in prior monitoring years through a mitigation plan addendum (regular font), and species that are not approved (italicized). 3). The "Mitigation Plan Performance Standard" section is derived only from stems included in the original mitigation plan, whereas the "Post Mitigation Plan Performance Standard" includes data from mitigation plan approved, post mitigation plan approved, and proposed stems. Current Year Stem Count Stems/Acre Species Count Species Included in Approved Mitigation Plan Mitigation Plan Performance Standard Current Year Stem Count Stems/Acre Species Count Dominant Species Composition (%) Average Plot Height (ft.) % Invasives Veg Plot 8 F Veg Plot 9 F Veg Plot 10 FVeg Plot 7 FScientific Name Common Name Tree/S hrub Indicator Status Veg Plot 1 F Veg Plot 2 F Veg Plot 3 F Veg Plot 4 F Veg Plot 5 F Veg Plot 6 F Plot size (ACRES) Planted Acreage Date of Initial Plant Date(s) of Supplemental Plant(s) Date(s) Mowing Date of Current Survey https://ncdms.shinyapps.io/Veg_Table_Tool Table 8. Vegetation Plot Data Table from Vegetation Data Entry Tool (cont.) 26.2 2023-02-04 NA 2023-03-15 2023-03-15 0.0247 Veg Plot 1 R Veg Plot 2 R Veg Plot 3 R Veg Plot 4 R Veg Plot 5 R Veg Plot 6 R Planted Total Planted Total Planted Total Planted Total Planted Total Planted Total Planted Total Total Total Total Total Total Total Betula nigra river birch Tree FACW 2 2 2 2 Carya cordiformis bitternut hickory Tree FAC 1 1 2 1 Carya ovata shagbark hickory Tree FACU 1 1 Celtis occidentalis common hackberry Tree FACU 2 2 Cornus amomum silky dogwood Shrub FACW 1 3 Liriodendron tulipifera tuliptree Tree FACU 3 2 1 1 1 1 1 7 2 Magnolia virginiana sweetbay Tree FACW 3 3 2 2 2 2 1 1 1 1 1 1 3 Nyssa aquatica water tupelo Tree OBL 1 1 1 1 3 4 Nyssa sylvatica blackgum Tree FAC 2 2 1 1 1 1 2 2 1 1 2 2 4 1 2 Persea borbonia redbay Tree FACW 1 2 3 3 Platanus occidentalis American sycamore Tree FACW 1 1 3 3 1 1 2 2 1 1 1 1 1 Quercus alba white oak Tree FACU 2 2 2 2 Quercus laurifolia laurel oak Tree FACW 4 4 4 4 9 9 1 2 2 Quercus michauxii swamp chestnut oak Tree FACW 4 4 1 1 1 1 2 2 1 1 3 Quercus nigra water oak Tree FAC 1 1 2 2 6 6 3 3 4 1 2 1 Quercus pagoda cherrybark oak Tree FACW 2 3 2 1 1 1 3 Quercus phellos willow oak Tree FACW 2 2 1 1 1 1 2 3 1 Quercus rubra northern red oak Tree FACU 3 3 2 2 2 2 2 2 Quercus shumardii Shumard's oak Tree FAC 1 1 2 2 2 2 2 1 Taxodium distichum bald cypress Tree OBL 1 1 1 1 1 1 1 1 8 Ulmus americana American elm Tree FAC 3 Sum Performance Standard 17 17 10 15 9 11 13 13 15 15 15 15 18 18 15 18 15 9 22 26 17 15 11 13 15 15 18 15 18 15 9 22 26 688 607 445 526 607 607 729 607 729 607 364 891 1053 9 9 5 7 11 5 6 9 11 8 6 9 8 18 20 36 31 13 40 50 27 17 27 33 32 31 0 0 1 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 17 15 11 13 15 15 18 15 18 15 9 22 26 688 607 445 526 607 607 729 607 729 607 364 891 1053 9 9 5 7 11 5 6 9 11 8 6 9 8 18 20 36 31 13 40 50 27 17 27 33 32 31 0 0 1 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Veg Plot 14 F Veg Plot 15 F Species Included in Approved Mitigation Plan Mitigation Plan Performance Standard Current Year Stem Count Stems/Acre Species Count Dominant Species Composition (%) Average Plot Height (ft.) % Invasives Veg Plot 11 F Veg Plot 12 F Veg Plot 13 F Veg Plot 16 F Veg Plot 17 F 1). Bolded species are proposed for the current monitoring year, italicized species are not approved, and a regular font indicates that the species has been approved. 2). The "Species Included in Approved Mitigation Plan" section contains only those species that were included in the original approved mitigation plan. The "Post Mitigation Plan Species" section includes species that are being proposed through a mitigation plan addendum for the current monitoring year (bolded) , species that have been approved in prior monitoring years through a mitigation plan addendum (regular font), and species that are not approved (italicized). 3). The "Mitigation Plan Performance Standard" section is derived only from stems included in the original mitigation plan, whereas the "Post Mitigation Plan Performance Standard" includes data from mitigation plan approved, post mitigation plan approved, and proposed stems. Current Year Stem Count Stems/Acre Species Count Dominant Species Composition (%) Average Plot Height (ft.) Indicator Status Post Mitigation Plan Performance Standard % Invasives Plot size (ACRES) Scientific Name Common Name Tree/S hrub Planted Acreage Date of Initial Plant Date(s) of Supplemental Plant(s) Date(s) Mowing Date of Current Survey   Final MY0 Monitoring Report (Project No. 100165)  Appendices  Crane Stream and Wetland Mitigation Site Restoration Systems, LLC  Lee County, North Carolina April 2023  Appendix C: Stream Geomorphology Data    Cross‐Sections with Annual Overlays  Longitudinal Profile  Table 9A‐E. Baseline Stream Data Summary Tables  Table 10A‐B. Cross‐Section Morphology Monitoring Summary     Station Elevation 0.0 388.7 388.48 2.8 388.6 NA 5.0 388.5 387.36 6.5 388.1 388.48 7.1 387.8 1.12 7.7 387.6 5.1 8.4 387.4 9.4 387.4 10.5 387.4 11.3 387.9 13.2 388.7 14.8 388.9 17.3 389.0 Site Crane Site Watershed:Cape Fear River Basin, 03030004 XS ID UT2, XS -1 Feature Pool Date:2/7/2023 Field Crew:Adams, Fleming, Smith Stream Type LTOB Max Depth: LTOB Cross Sectional Area: SUMMARY DATA Bankfull Elevation: Bank Hieght Ratio: Thalweg Elevation: LTOB Elevation: 387 388 389 390 0 10 20 El e v a t i o n ( f e e t ) Station (feet) Crane, UT2, XS-1, Pool Bankfull MY-00 2/7/23 Station Elevation 0.0 389.0 388.92 1.4 388.9 1.00 4.1 388.9 387.92 5.7 388.5 388.92 6.8 388.1 1.00 7.2 387.9 3.8 7.5 388.0 8.0 388.1 8.5 388.1 9.1 388.1 9.9 388.4 11.6 389.0 13.9 389.3 16.8 389.7 Site Crane Site Watershed:Cape Fear River Basin, 03030004 XS ID UT2, XS-2 LTOB Elevation: Feature Riffle Date:2/7/2023 Field Crew:Adams, Fleming, Smith SUMMARY DATA Bankfull Elevation: Bank Hieght Ratio: Thalweg Elevation: LTOB Max Depth: LTOB Cross Sectional Area: Stream Type 388 389 390 0 10 20 El e v a t i o n ( f e e t ) Station (feet) Crane, UT2, XS-2, Riffle Bankfull MY-00 2/7/23 Station Elevation 0.0 388.9 388.85 1.9 388.9 1.00 3.6 388.8 388.24 4.4 388.6 388.85 4.8 388.3 0.61 5.5 388.3 2.7 6.0 388.3 6.7 388.3 7.6 388.2 8.1 388.4 9.8 388.7 12.0 389.0 Site Crane Site Watershed:Cape Fear River Basin, 03030004 XS ID UT4, XS-3 LTOB Elevation: Feature Riffle Date:2/7/2023 Field Crew:Adams, Fleming, Smith SUMMARY DATA Bankfull Elevation: Bank Hieght Ratio: Thalweg Elevation: LTOB Max Depth: LTOB Cross Sectional Area: Stream Type 388 389 390 0 5 10 15 El e v a t i o n ( f e e t ) Station (feet) Crane, UT4, XS-3, Riffle Bankfull MY-00 2/7/23 Station Elevation 0.0 389.2 388.94 1.5 388.9 NA 2.6 388.6 388.06 3.5 388.2 388.94 4.5 388.1 0.88 5.3 388.1 3.0 6.1 388.5 6.8 388.7 7.8 389.0 9.7 389.3 Site Crane Site Watershed:Cape Fear River Basin, 03030004 XS ID UT4, XS-4 LTOB Elevation: Feature Pool Date:2/7/2023 Field Crew:Adams, Fleming, Smith SUMMARY DATA Bankfull Elevation: Bank Hieght Ratio: Thalweg Elevation: LTOB Max Depth: LTOB Cross Sectional Area: Stream Type 388 389 390 0 5 10 El e v a t i o n ( f e e t ) Station (feet) Crane, UT4, XS-4, Pool Bankfull MY-00 2/7/23 Station Elevation 0.0 392.6 391.96 2.7 392.2 1.00 5.6 392.1 391.43 6.8 391.6 391.96 7.5 391.5 0.53 8.0 391.6 1.4 8.9 391.4 9.3 391.7 10.6 392.0 12.2 392.0 16.2 392.1 Site Crane Site Watershed:Cape Fear River Basin, 03030004 XS ID UT4, XS-5 LTOB Elevation: Feature Riffle Date:2/7/2023 Field Crew:Adams, Fleming, Smith SUMMARY DATA Bankfull Elevation: Bank Hieght Ratio: Thalweg Elevation: LTOB Max Depth: LTOB Cross Sectional Area: Stream Type 391 392 393 0 5 10 15 20 El e v a t i o n ( f e e t ) Station (feet) Crane, UT4, XS-5, Riffle Bankfull MY-00 2/7/23 Station Elevation 0.0 392.6 392.04 2.7 392.2 NA 5.2 392.2 391.06 5.8 391.9 392.04 6.6 391.6 0.99 7.3 391.5 3.0 7.8 391.3 8.4 391.1 8.8 391.1 9.2 391.3 10.2 391.6 11.1 392.0 12.6 392.0 15.1 392.3 Site Crane Site Watershed:Cape Fear River Basin, 03030004 XS ID UT4, XS-6 LTOB Elevation: Feature Pool Date:2/7/2023 Field Crew:Adams, Fleming, Smith SUMMARY DATA Bankfull Elevation: Bank Hieght Ratio: Thalweg Elevation: LTOB Max Depth: LTOB Cross Sectional Area: Stream Type 391 392 393 0 5 10 15 20 El e v a t i o n ( f e e t ) Station (feet) Crane, UT4, XS-6, Pool Bankfull MY-00 2/7/23 Station Elevation 0.0 390.0 389.84 2.9 389.9 1.00 5.0 389.7 388.83 6.2 389.4 389.84 7.7 389.1 1.01 8.5 388.8 6.7 9.3 388.8 10.4 388.9 11.0 388.9 11.8 388.9 12.4 389.0 13.3 389.3 14.4 389.8 16.4 389.9 18.9 390.0 Site Crane Site Watershed:Cape Fear River Basin, 03030004 XS ID UT1, XS-7 LTOB Elevation: Feature Riffle Date:2/7/2023 Field Crew:Adams, Fleming, Smith SUMMARY DATA Bankfull Elevation: Bank Hieght Ratio: Thalweg Elevation: LTOB Max Depth: LTOB Cross Sectional Area: Stream Type 388 389 390 391 0 5 10 15 20 El e v a t i o n ( f e e t ) Station (feet) Crane, UT1, XS-7, Riffle Bankfull MY-00 2/7/23 Station Elevation 0.0 390.1 389.72 3.2 389.9 NA 4.8 389.7 388.24 5.8 389.4 389.72 6.8 389.3 1.48 7.6 388.3 9.7 8.7 388.2 9.6 388.3 10.5 388.3 11.4 388.3 12.0 388.4 12.4 388.6 13.1 388.9 14.1 389.3 15.6 389.8 18.3 390.0 20.2 390.1 Site Crane Site Watershed:Cape Fear River Basin, 03030004 XS ID UT1, XS-8 LTOB Elevation: Feature Riffle Date:2/7/2023 Field Crew:Adams, Fleming, Smith SUMMARY DATA Bankfull Elevation: Bank Hieght Ratio: Thalweg Elevation: LTOB Max Depth: LTOB Cross Sectional Area: Stream Type 388 389 390 391 0 5 10 15 20 25 El e v a t i o n ( f e e t ) Station (feet) Crane, UT1, XS-8, Pool Bankfull MY-00 2/7/23 Station Elevation 0.0 394.6 394.72 2.8 394.7 1.00 4.4 394.4 393.90 5.5 394.1 394.72 6.6 393.9 0.82 7.6 393.9 3.9 8.5 394.1 9.3 394.1 10.3 394.7 11.1 394.8 12.9 394.8 15.0 395.1 Site Crane Site Watershed:Cape Fear River Basin, 03030004 XS ID UT3, XS-9 LTOB Elevation: Feature Riffle Date:2/7/2023 Field Crew:Adams, Fleming, Smith SUMMARY DATA Bankfull Elevation: Bank Hieght Ratio: Thalweg Elevation: LTOB Max Depth: LTOB Cross Sectional Area: Stream Type 393 394 395 396 0 5 10 15 20 El e v a t i o n ( f e e t ) Station (feet) Crane, UT3, XS-9, Riffle Bankfull MY-00 2/7/23 Station Elevation 0.0 394.9 394.40 2.4 394.6 NA 3.8 394.5 391.94 4.8 394.2 394.40 5.8 394.4 2.46 6.3 391.9 5.3 6.8 392.2 7.6 392.3 8.2 392.3 8.7 394.5 9.7 394.6 11.3 395.1 13.9 395.3 Site Crane Site Watershed:Cape Fear River Basin, 03030004 XS ID UT3, XS-10 LTOB Elevation: Feature Pool Date:2/7/2023 Field Crew:Adams, Fleming, Smith SUMMARY DATA Bankfull Elevation: Bank Hieght Ratio: Thalweg Elevation: LTOB Max Depth: LTOB Cross Sectional Area: Stream Type 391 392 393 394 395 396 0 5 10 15 20 El e v a t i o n ( f e e t ) Station (feet) Crane, UT3, XS-10, Pool Bankfull MY-00 2/7/23 Station Elevation 0.0 395.3 395.05 3.8 395.3 1.00 4.9 395.1 394.18 6.0 394.6 395.05 6.8 394.4 0.87 7.6 394.4 5.1 8.7 394.2 9.0 394.2 9.4 394.2 10.3 394.2 10.9 394.2 11.7 394.5 12.8 394.7 13.5 395.1 15.7 395.2 19.3 395.3 Site Crane Site Watershed:Cape Fear River Basin, 03030004 XS ID UT1, XS-11 LTOB Elevation: Feature Riffle Date:2/7/2023 Field Crew:Adams, Fleming, Smith SUMMARY DATA Bankfull Elevation: Bank Hieght Ratio: Thalweg Elevation: LTOB Max Depth: LTOB Cross Sectional Area: Stream Type 394 395 396 0 5 10 15 20 El e v a t i o n ( f e e t ) Station (feet) Crane, UT1, XS-11, Riffle Bankfull MY-00 2/7/23 Station Elevation 0.0 395.4 395.00 3.8 395.0 NA 5.5 394.4 393.69 6.5 394.0 395.00 7.6 393.8 1.31 8.5 393.8 8.0 9.4 393.7 10.2 393.8 11.3 394.2 12.1 394.5 13.7 394.9 15.4 395.2 21.2 395.2 Site Crane Site Watershed:Cape Fear River Basin, 03030004 XS ID UT1, XS-12 LTOB Elevation: Feature Pool Date:2/7/2023 Field Crew:Adams, Fleming, Smith SUMMARY DATA Bankfull Elevation: Bank Hieght Ratio: Thalweg Elevation: LTOB Max Depth: LTOB Cross Sectional Area: Stream Type 393 394 395 396 0 5 10 15 20 25 El e v a t i o n ( f e e t ) Station (feet) Crane, UT1, XS-12, Pool Bankfull MY-00 2/7/23 Station Elevation 0.0 399.4 399.13 3.2 399.3 1.00 4.6 399.4 398.21 5.6 399.2 399.13 6.5 398.7 0.92 7.8 398.4 4.4 8.9 398.3 9.9 398.2 10.6 398.3 11.1 398.4 11.7 398.7 12.5 398.9 13.0 399.1 15.9 399.1 18.2 399.6 Site Crane Site Watershed:Cape Fear River Basin, 03030004 XS ID UT5, XS-13 LTOB Elevation: Feature Riffle Date:2/7/2023 Field Crew:Adams, Fleming, Smith SUMMARY DATA Bankfull Elevation: Bank Hieght Ratio: Thalweg Elevation: LTOB Max Depth: LTOB Cross Sectional Area: Stream Type 398 399 400 0 5 10 15 20 25 El e v a t i o n ( f e e t ) Station (feet) Crane, UT5, XS-13, Riffle Bankfull MY-00 2/7/23 Station Elevation 0.0 399.3 398.95 2.5 399.0 NA 4.2 398.9 398.20 5.0 398.7 398.95 5.9 398.4 0.75 6.8 398.3 4.0 8.3 398.2 9.5 398.3 10.7 398.4 11.7 398.7 12.3 399.1 13.3 399.4 15.7 399.2 18.3 399.5 Site Crane Site Watershed:Cape Fear River Basin, 03030004 XS ID UT5, XS-14 LTOB Elevation: Feature Pool Date:2/7/2023 Field Crew:Adams, Fleming, Smith SUMMARY DATA Bankfull Elevation: Bank Hieght Ratio: Thalweg Elevation: LTOB Max Depth: LTOB Cross Sectional Area: Stream Type 398 399 400 0 5 10 15 20 25 El e v a t i o n ( f e e t ) Station (feet) Crane, UT5, XS-14, Pool Bankfull MY-00 2/7/23 Station Elevation 0.0 408.7 408.40 3.8 408.4 1.00 4.8 408.2 407.44 6.3 407.6 408.40 7.4 407.5 0.96 8.3 407.4 5.8 9.1 407.5 10.5 407.5 11.2 407.7 11.9 408.1 13.2 408.6 15.4 408.7 18.2 409.0 Site Crane Site Watershed:Cape Fear River Basin, 03030004 XS ID UT1, XS-15 LTOB Elevation: Feature Riffle Date:2/7/2023 Field Crew:Adams, Fleming, Smith SUMMARY DATA Bankfull Elevation: Bank Hieght Ratio: Thalweg Elevation: LTOB Max Depth: LTOB Cross Sectional Area: Stream Type 407 408 409 410 0 5 10 15 20 El e v a t i o n ( f e e t ) Station (feet) Crane, UT1, XS-15, Riffle Bankfull MY-00 2/7/23 Station Elevation 0.0 409.2 408.81 3.3 409.0 NA 4.7 408.8 406.67 6.2 408.2 408.81 7.1 406.9 2.14 7.9 406.8 12.9 8.9 406.7 9.5 406.8 10.2 406.9 11.4 406.8 12.1 406.9 12.7 408.3 13.5 408.3 14.5 408.8 15.4 409.2 19.1 409.2 Site Crane Site Watershed:Cape Fear River Basin, 03030004 XS ID UT1, XS-16 LTOB Elevation: Feature Pool Date:2/7/2023 Field Crew:Adams, Fleming, Smith SUMMARY DATA Bankfull Elevation: Bank Hieght Ratio: Thalweg Elevation: LTOB Max Depth: LTOB Cross Sectional Area: Stream Type 406 407 408 409 410 0 5 10 15 20 25 El e v a t i o n ( f e e t ) Station (feet) Crane, UT1, XS-16, Pool Bankfull MY-00 2/7/23 Project Name Crane Mitigation Site - Baseline (2023) Profile Reach UT 1 (Sta 00+00 to 17+50) Feature Profile Date 1/26/23 Crew Perkinson, Smith Station Bed Elevation Water Elevation TOB Station Bed Elevation Water Elevation TOB Station Bed Elevation Water Elevation TOB Station Bed Elevation Water Elevation TOB 0 393.86 20.36 394.29 35.11 393.98 395.59 37.09 393.73 44.70 393.11 45.43 394.88 60.77 394.77 71.34 394.74 395.82 75.40 394.54 81.23 393.80 82.25 395.43 102.63 395.37 396.41 108.19 396.19 113.54 396.46 127.16 394.95 132.30 395.25 142.25 395.72 157.83 395.44 396.70 162.47 395.07 167.71 394.49 169.04 396.30 188.66 396.36 397.17 192.31 396.09 197.36 395.57 202.56 395.11 203.90 396.59 231.05 396.51 397.61 235.59 396.31 238.95 396.19 240.55 396.24 245.81 396.58 265.44 396.62 397.69 267.70 396.51 269.54 396.64 270.65 396.67 284.48 396.85 397.75 286.48 396.43 291.19 395.47 292.72 397.50 308.99 397.40 398.21 311.21 397.31 315.87 397.35 318.12 397.67 348.96 397.88 358.21 397.92 398.60 362.64 397.62 367.88 396.85 372.32 396.57 373.56 398.58 393.64 398.29 399.29 398.34 397.84 402.66 397.99 403.95 398.11 408.62 398.40 429.57 398.52 399.77 431.94 397.95 436.35 397.29 437.68 399.21 458.75 398.95 399.69 462.55 398.30 469.04 398.52 469.45 398.40 471.64 398.66 477.61 398.86 499.66 399.07 400.15 502.12 398.68 2023 Baseline Survey As needed As needed As needed 390 395 400 405 410 415 420 425 0 200 400 600 800 1000 1200 1400 1600 El e v a t i o n ( f e e t ) Distance (feet) Crane Mitigation Site, UT 1 (Sta 00+00 to 17+50) Baseline Profile 2023 Bed Baseline 1/26/2023 TOB 1/26/2023 Project Name Crane Mitigation Site - Baseline (2023) Profile Reach UT 2 (Sta 00+00 to 05+00) Feature Profile Date 1/26/23 Crew Perkinson, Smith Station Bed Elevation Water Elevation TOB Station Bed Elevation Water Elevation TOB Station Bed Elevation Water Elevation TOB Station Bed Elevation Water Elevation TOB 0 394.28 394.90 4.45 393.94 8.45 394.00 11.87 394.46 23.36 394.40 395.16 27.82 394.04 33.94 393.35 36.13 394.81 52.20 394.73 395.58 56.01 394.50 60.33 394.48 61.81 394.58 79.53 394.49 395.59 82.86 393.45 86.22 393.16 87.05 394.92 97.68 394.88 396.04 99.73 394.77 103.03 394.76 116.39 395.24 396.09 118.56 394.09 122.72 394.05 123.63 395.63 135.62 395.44 396.60 137.87 394.70 141.39 393.97 142.37 396.01 150.37 395.63 396.37 163.65 395.09 167.93 394.00 168.99 396.01 177.06 395.55 396.09 179.57 394.78 184.13 394.28 185.14 396.28 195.32 395.83 397.06 196.25 395.33 200.55 394.56 201.67 396.68 213.19 396.43 397.33 216.50 396.19 219.00 396.21 221.33 396.36 229.78 396.54 397.47 233.58 395.97 240.55 395.83 241.62 397.12 248.08 396.91 397.73 254.92 395.92 258.45 395.41 259.89 397.32 269.25 397.09 398.11 271.22 396.93 275.23 396.92 277.50 397.05 291.38 397.04 397.74 294.43 396.65 299.48 395.88 301.04 397.62 310.01 397.36 398.09 312.16 396.38 318.35 395.44 320.53 397.66 329.26 397.41 398.22 334.24 396.84 339.12 395.95 2023 Baseline Survey As needed As needed As needed 392 393 394 395 396 397 398 399 400 401 402 403 0 100 200 300 400 500 600 El e v a t i o n ( f e e t ) Distance (feet) Crane Mitigation Site, UT 2 (Sta 00+00 to 05+00) Baseline Profile 2023 Bed Baseline 1/26/2023 TOB 1/26/2023 Project Name Crane Mitigation Site - Baseline (2023) Profile Reach UT 3 (Sta 00+00 to 05+50) Feature Profile Date 1/26/23 Crew Perkinson, Smith Station Bed Elevation Water Elevation TOB Station Bed Elevation Water Elevation TOB Station Bed Elevation Water Elevation TOB Station Bed Elevation Water Elevation TOB 0.00 398.81 8.88 398.50 399.19 9.83 398.49 12.71 398.58 14.29 398.60 22.21 398.73 399.14 23.47 398.27 28.17 398.32 29.64 398.60 40.01 398.70 399.26 42.78 398.62 44.63 398.54 47.05 398.55 49.10 399.00 56.38 399.02 399.44 58.18 398.72 61.77 398.62 66.00 398.93 66.93 399.20 76.56 399.29 399.78 78.56 399.02 81.97 398.89 83.08 398.97 93.54 399.05 399.76 95.14 398.82 100.85 398.16 101.55 399.73 107.40 399.48 400.09 109.01 399.15 112.19 399.21 114.39 399.20 115.97 399.35 124.30 399.70 400.02 126.84 399.47 130.16 399.29 134.10 399.36 135.89 399.60 151.50 399.92 168.79 400.28 172.50 400.21 400.89 174.14 399.61 178.57 399.22 179.34 400.79 185.71 400.43 401.27 187.58 400.04 192.02 399.56 192.58 401.12 199.96 400.97 401.73 201.90 400.52 205.63 399.61 206.73 401.38 218.54 401.12 402.00 220.24 400.54 224.40 399.77 225.21 401.87 233.69 401.65 402.32 236.62 401.26 241.72 400.73 242.85 402.23 252.50 402.02 402.78 255.35 401.87 259.39 401.59 260.35 402.74 268.82 402.64 403.17 270.22 401.99 275.07 401.78 2023 Baseline Survey As needed As needed As needed 396 398 400 402 404 406 408 410 0 100 200 300 400 500 600 El e v a t i o n ( f e e t ) Distance (feet) Crane Mitigation Site, UT 3 (Sta 00+00 to 05+50) Baseline Profile 2023 Bed Baseline 1/26/2023 TOB 1/26/2023 Project Name Crane Mitigation Site - Baseline (2023) Profile Reach UT 4 (Sta 00+00 to 04+50) Feature Profile Date 1/26/23 Crew Perkinson, Smith Station Bed Elevation Water Elevation TOB Station Bed Elevation Water Elevation TOB Station Bed Elevation Water Elevation TOB Station Bed Elevation Water Elevation TOB 0.0 394.75 13.5 394.97 22.2 395.00 395.83 23.8 394.56 27.1 394.19 27.8 395.50 37.5 395.25 396.19 39.7 394.82 41.7 394.75 42.6 395.87 57.8 395.58 73.6 395.83 396.44 75.2 395.46 79.0 395.49 80.4 395.65 88.6 395.69 396.54 92.6 395.14 97.7 394.57 98.9 396.29 108.7 396.13 397.06 110.5 395.53 113.9 395.97 114.9 396.62 130.8 396.48 397.47 133.2 395.76 136.3 396.00 137.6 397.18 150.2 396.97 397.57 152.2 396.41 155.0 396.19 156.6 397.51 167.6 397.26 398.01 170.4 396.96 174.5 396.42 175.8 397.82 184.0 397.66 398.19 186.3 397.36 193.6 397.18 195.1 398.28 204.6 398.15 398.57 209.9 397.52 213.2 397.35 214.7 398.60 227.5 398.31 235.9 398.58 399.35 238.5 397.51 241.3 397.55 242.5 398.80 254.3 398.74 268.8 398.83 399.42 274.1 398.56 276.7 398.62 279.3 398.90 289.9 398.76 399.57 291.8 398.02 294.4 397.99 296.3 399.34 309.6 398.99 324.2 399.24 400.01 327.4 399.02 330.9 399.00 334.1 399.03 345.4 399.37 399.90 348.4 399.11 350.4 399.11 352.9 399.29 2023 Baseline Survey As needed As needed As needed 393 394 395 396 397 398 399 400 401 0 20 40 60 80 100 120 140 El e v a t i o n ( f e e t ) Distance (feet) Crane Mitigation Site, UT 4 (Sta 00+00 to 04+50) Baseline Profile 2023 Bed Baseline 1/26/2023 TOB 1/26/2023 Project Name Crane Mitigation Site - Baseline (2023) Profile Reach UT 5 (Sta 00+00 to 02+50) Feature Profile Date 1/26/23 Crew Perkinson, Smith Station Bed Elevation Water Elevation TOB Station Bed Elevation Water Elevation TOB Station Bed Elevation Water Elevation TOB Station Bed Elevation Water Elevation TOB 0.00 405.30 25.13 405.35 406.27 28.24 405.22 32.78 405.20 37.61 405.62 45.39 405.42 406.51 49.00 405.51 53.94 405.46 56.10 405.53 72.60 405.47 406.31 74.01 405.03 79.62 404.52 80.81 405.97 96.46 405.48 406.45 99.14 405.10 103.70 404.16 105.05 406.00 120.25 405.90 406.73 123.21 405.55 132.98 405.49 136.06 405.86 144.95 405.95 407.00 147.95 405.74 155.63 405.25 157.06 406.55 173.62 406.26 407.09 175.71 406.00 180.79 405.27 182.23 406.82 197.63 406.53 407.62 200.05 406.20 204.07 405.87 205.53 407.35 221.49 407.03 407.87 222.74 406.47 227.20 406.16 228.43 407.66 247.83 408.09 408.69 2023 Baseline Survey As needed As needed As needed 404 404 405 405 406 406 407 407 408 408 409 409 0 20 40 60 80 100 120 140 El e v a t i o n ( f e e t ) Distance (feet) Crane Mitigation Site, UT 5 (Sta 00+00 to 02+50) Baseline Profile 2023 Bed Baseline 1/26/2023 TOB 1/26/2023 Parameter Riffle Only Min Mean Med Max n Min Max Min Max n Bankfull Width (ft)4.3 6.7 12.5 7.7 8.9 8.5 11.0 3 Floodprone Width (ft)9 75 100 50 150 100 100 3 Bankfull Mean Depth (ft)0.4 0.9 1.2 0.6 0.6 0.6 0.6 3 Bankfull Max Depth (ft)0.9 1.8 2.9 0.7 1 0.9 1.0 3 Bankfull Cross Sectional Area (ft 2)5 5 5 5 5 5.1 6.7 3 Width/Depth Ratio 3.6 10.6 31.3 12 16 13.9 17.9 3 Entrenchment Ratio 1.6 13 23.3 6.5 16.8 9.1 11.8 3 Bank Height Ratio 1 1.7 2.8 1 1.3 1.0 1.0 3 Max part size (mm) mobilized at bankfull Rosgen Classification Bankfull Discharge (cfs) Sinuosity (ft) Water Surface Slope (Channel) (ft/ft) Other Parameter Riffle Only Min Mean Med Max n Min Max Min Max n Bankfull Width (ft)2.2 3.3 4.8 4.8 5.5 7.2 7.2 1 Floodprone Width (ft)5 7 12 25 75 50.0 50.0 1 Bankfull Mean Depth (ft)0.4 0.6 0.8 0.3 0.4 0.5 0.5 1 Bankfull Max Depth (ft)0.6 1 1.4 0.4 0.6 1.0 1.0 1 Bankfull Cross Sectional Area (ft 2)1.9 1.9 1.9 1.9 1.9 3.8 3.8 1 Width/Depth Ratio 2.8 6 12 12 16 13.8 13.8 1 Entrenchment Ratio 1.8 2.1 2.5 5.2 13.6 6.9 6.9 1 Bank Height Ratio 2.2 2.5 3.1 1 1.3 1.0 1.0 1 Max part size (mm) mobilized at bankfull Rosgen Classification Bankfull Discharge (cfs) Sinuosity (ft) Water Surface Slope (Channel) (ft/ft) Other Pre-Existing Condition (applicable) Monitoring Baseline (MY0)Design Table 9A. Baseline Stream Data Summary Crane - UT 1 1.1 0.0179 0.0167 0.0167 1.03 1.1 1919 19 Ce 5Eg 5 Ce 5 G 5 Ce 5 Ce 5 Table 9B. Baseline Stream Data Summary Crane - UT 2 Pre-Existing Condition (applicable) Design Monitoring Baseline (MY0) 0.0145 0.0144 0.0144 6.6 6.6 6.6 1.09 1.1 1.1 Parameter Riffle Only Min Mean Med Max n Min Max Min Max n Bankfull Width (ft)2.1 3.4 4.2 3.8 4.4 7.8 7.8 1 Floodprone Width (ft)4 23 50 25 75 50.0 50.0 1 Bankfull Mean Depth (ft)0.3 0.4 0.6 0.3 0.3 0.5 0.5 1 Bankfull Max Depth (ft)0.6 0.8 1.1 0.4 0.5 0.8 0.8 1 Bankfull Cross Sectional Area (ft 2)1.2 1.2 1.2 1.2 1.2 3.9 3.9 1 Width/Depth Ratio 3.5 10.1 14 12 16 15.6 15.6 1 Entrenchment Ratio 1.3 8.1 23.8 6.6 17.1 6.4 6.4 1 Bank Height Ratio 2 4 7.2 1 1.3 1.0 1.0 1 Max part size (mm) mobilized at bankfull Rosgen Classification Bankfull Discharge (cfs) Sinuosity (ft) Water Surface Slope (Channel) (ft/ft) Other Parameter Riffle Only Min Mean Med Max n Min Max Min Max n Bankfull Width (ft)1.8 3.3 4.8 3.9 4.6 4.7 7.5 2 Floodprone Width (ft)8 50 26 50 100 75.0 75.0 2 Bankfull Mean Depth (ft)0.3 0.5 0.7 0.3 0.3 0.3 0.4 2 Bankfull Max Depth (ft)0.4 0.8 1.2 0.4 0.5 0.5 0.6 2 Bankfull Cross Sectional Area (ft 2)1.3 1.3 1.3 1.3 1.3 1.4 2.7 2 Width/Depth Ratio 2.6 8.9 16 12 16 15.6 20.8 2 Entrenchment Ratio 1.2 9.8 15.6 6.1 15.8 9.9 16.0 2 Bank Height Ratio 1.3 1.9 2.8 1 1.3 1.0 1.0 2 Max part size (mm) mobilized at bankfull Rosgen Classification Bankfull Discharge (cfs) Sinuosity (ft) Water Surface Slope (Channel) (ft/ft) Other Eg 5 Ce 5 Ce 5 Table 9C. Baseline Stream Data Summary Crane - UT 3 Pre-Existing Condition (applicable) Design Monitoring Baseline 0.0287 0.0264 0.0264 4.2 4.2 4.2 1.01 1.1 1.1 Eg 5 Ce 5 Ce 5 Table 9D. Baseline Stream Data Summary Crane - UT 4 Pre-Existing Condition (applicable) Design Monitoring Baseline 0.0145 0.0133 0.0133 4.5 4.5 4.5 1.01 1.1 1.1 Parameter Riffle Only Min Mean Med Max n Min Max Min Max n Bankfull Width (ft)3.7 4.1 4.7 6.1 7 10.3 10.3 1 Floodprone Width (ft)6 8 11 50 150 100.0 100.0 1 Bankfull Mean Depth (ft)0.6 0.7 0.8 0.4 0.5 0.4 0.4 1 Bankfull Max Depth (ft)0.8 1 1.2 0.6 0.8 0.9 0.9 1 Bankfull Cross Sectional Area (ft 2)3.1 3.1 3.1 3.1 3.1 4.4 4.4 1 Width/Depth Ratio 4.6 5.8 7.8 12 16 24.2 24.2 1 Entrenchment Ratio 1.3 1.9 2.6 8.2 21.3 9.7 9.7 1 Bank Height Ratio 1.8 2.9 4.8 1 1.3 1.0 1.0 1 Max part size (mm) mobilized at bankfull Rosgen Classification Bankfull Discharge (cfs) Sinuosity (ft) Water Surface Slope (Channel) (ft/ft) Other Ge 5 Ce 5 Ce 5 Table 9E. Baseline Stream Data Summary Crane - UT 5 Pre-Existing Condition (applicable) Design Monitoring Baseline 0.0149 0.0136 0.0136 11.3 11.3 11.3 1.01 1.1 1.1 MY0 MY1 MY2 MY3 MY5 MY7 MY+ MY0 MY1 MY2 MY3 MY5 MY7 MY+ MY0 MY1 MY2 MY3 MY5 MY7 MY+ MY0 MY1 MY2 MY3 MY5 MY7 MY+ MY0 MY1 MY2 MY3 MY5 MY7 MY+ Bankfull Elevation (ft) ‐ Based on AB‐Bankfull1 Area 388.48 388.92 388.85 388.94 391.96 Bank Height Ratio_Based on AB Bankfull1 Area NA 1.00 1.00 NA 1.00 Thalweg Elevation 387.36 387.916 388.238  388.06 391.43 LTOB2 Elevation 388.48 388.918 `388.85 388.94 391.96 LTOB2 Max Depth (ft)1.12 1.00 0.61 0.88 0.53 LTOB2 Cross Sectional Area (ft2)5.1 3.8 2.7 3.0 1.4 MY0 MY1 MY2 MY3 MY5 MY7 MY+ MY0 MY1 MY2 MY3 MY5 MY7 MY+ MY0 MY1 MY2 MY3 MY5 MY7 MY+ Bankfull Elevation (ft) ‐ Based on AB‐Bankfull1 Area 392.04 389.84 389.72 Bank Height Ratio_Based on AB Bankfull1 Area NA 1.00 NA Thalweg Elevation 391.06 388.831 388.24 LTOB2 Elevation 392.04 389.842 389.72 LTOB2 Max Depth (ft)0.99 1.01 1.48 LTOB2 Cross Sectional Area (ft2)3.0 6.7 9.7 0.00 1.80 Bankfull Elevation (ft) ‐ Based on AB‐Bankfull1 Area Bank Height Ratio_Based on AB Bankfull1 Area Thalweg Elevation LTOB2 Elevation LTOB2 Max Depth (ft) LTOB2 Cross Sectional Area (ft2) MY0 MY1 MY2 MY3 MY5 MY7 MY+ MY0 MY1 MY2 MY3 MY5 MY7 MY+ MY0 MY1 MY2 MY3 MY5 MY7 MY+ MY0 MY1 MY2 MY3 MY5 MY7 MY+ MY0 MY1 MY2 MY3 MY5 MY7 MY+ Bankfull Elevation (ft) ‐ Based on AB‐Bankfull1 Area 394.72 394.40 395.05 395.00 399.13 Bank Height Ratio_Based on AB Bankfull1 Area 1.00 NA 1.00 NA 1.00 Thalweg Elevation 393.90 391.936 394.18  393.69 398.21 LTOB2 Elevation 394.72 394.399 `395.05 395.00 399.13 LTOB2 Max Depth (ft)0.82 2.46 0.87 1.31 0.92 LTOB2 Cross Sectional Area (ft2)3.9 5.3 5.1 8.0 4.4 MY0 MY1 MY2 MY3 MY5 MY7 MY+ MY0 MY1 MY2 MY3 MY5 MY7 MY+ MY0 MY1 MY2 MY3 MY5 MY7 MY+ Bankfull Elevation (ft) ‐ Based on AB‐Bankfull1 Area 398.95 408.40 408.81 Bank Height Ratio_Based on AB Bankfull1 Area NA 1.00 NA Thalweg Elevation 398.20 407.442 406.67 LTOB2 Elevation 398.95 408.401 408.81 LTOB2 Max Depth (ft)0.75 0.96 2.14 LTOB2 Cross Sectional Area (ft2)4.0 5.8 12.9 0.00 1.80 Bankfull Elevation (ft) ‐ Based on AB‐Bankfull1 Area Bank Height Ratio_Based on AB Bankfull1 Area Thalweg Elevation LTOB2 Elevation LTOB2 Max Depth (ft) LTOB2 Cross Sectional Area (ft2)   Table 10A.  Monitoring Data ‐ Cross Section Morphology Monitoring Summary (Crane/ DMS:100165)    UT 1, UT 2, and UT 4 UT 2 ‐ Cross Section 1 (Pool) UT 2 ‐ Cross Section 2 (Riffle) UT 4 ‐ Cross Section 3 (Riffle) UT 4 ‐ Cross Section 4 (Pool) UT 4 ‐ Cross Section 5 (Riffle) Note: The smaller the channel the closer the survey measurements are to their limit of reliable detection, therefore inter‐annual variation in morphological measurement (as a percentage) is by default magnified as channel size decereases.  Some of the variability above is the result of this factor and some is due to the large amount of depositional sediments observed.       UT 4 ‐ Cross Section 6 (Pool) UT 1 ‐ Cross Section 7 (Riffle) UT 1 ‐ Cross Section 8 (Pool)   Table 10B.  Monitoring Data ‐ Cross Section Morphology Monitoring Summary (Crane/ DMS:100165)    UT 1, UT 3, and UT 5 UT 3 ‐ Cross Section 9 (Riffle) UT 3 ‐ Cross Section 10 (Pool) UT 1 ‐ Cross Section 11 (Riffle) UT 1 ‐ Cross Section 12 (Pool) UT 5 ‐ Cross Section 13 (Riffle) Note: The smaller the channel the closer the survey measurements are to their limit of reliable detection, therefore inter‐annual variation in morphological measurement (as a percentage) is by default magnified as channel size decereases.  Some of the variability above is the result of this factor and some is due to the large amount of depositional sediments observed.       UT 5 ‐ Cross Section 14 (Pool) UT 1 ‐ Cross Section 15 (Riffle) UT 1 ‐ Cross Section 16 (Pool) The above morphology parameters reflect the 2018 guidance that arose from the mitigation technical workgroup consisting of DMS, the IRT and industry mitigation providers/practitioners.  The outcome resulted  in the focus on three primary morphological parameters of interest for the purposes of tracking channel change moving forward. They are the bank height ratio using a constant As‐built bankfull area and the  cross sectional area and max depth based on each years low top of bank.  These are calculated as follows: 1 ‐Bank Height Ratio (BHR) takes the As‐built bankful area as the basis for adjusting each subsequent years bankfull elevation.  For example if the As‐built bankfull area was 10 ft2, then the MY1 bankfull  elevation would be adjusted until the calculated bankfull area within the MY1 cross section survey = 10 ft2.  The BHR would then be calculated with the difference between the low top of bank (LTOB) elevation  for MY1 and the thalweg elevation for MY1 in the numerator with the difference between the MY1 bankfull elevation and the MY1 thalweg elevation in the denominator.  This same process is then carried out in  each successive year. 2  ‐LTOB Area and Max depth ‐These are based on the LTOB elevation for each years survey (The same elevation used for the LTOB in the BHR calculation).  Area below the LTOB elevation will be used and  tracked for each year as above.  The difference between the LTOB elevation and the thalweg elevation (same as in the BHR calculation) will be recroded and tracked above as LTOB max depth.        The above morphology parameters reflect the 2018 guidance that arose from the mitigation technical workgroup consisting of DMS, the IRT and industry mitigation providers/practitioners.  The outcome resulted  in the focus on three primary morphological parameters of interest for the purposes of tracking channel change moving forward. They are the bank height ratio using a constant As‐built bankfull area and the  cross sectional area and max depth based on each years low top of bank.  These are calculated as follows: 1 ‐Bank Height Ratio (BHR) takes the As‐built bankful area as the basis for adjusting each subsequent years bankfull elevation.  For example if the As‐built bankfull area was 10 ft2, then the MY1 bankfull  elevation would be adjusted until the calculated bankfull area within the MY1 cross section survey = 10 ft2.  The BHR would then be calculated with the difference between the low top of bank (LTOB) elevation  for MY1 and the thalweg elevation for MY1 in the numerator with the difference between the MY1 bankfull elevation and the MY1 thalweg elevation in the denominator.  This same process is then carried out in  each successive year. 2  ‐LTOB Area and Max depth ‐These are based on the LTOB elevation for each years survey (The same elevation used for the LTOB in the BHR calculation).  Area below the LTOB elevation will be used and  tracked for each year as above.  The difference between the LTOB elevation and the thalweg elevation (same as in the BHR calculation) will be recroded and tracked above as LTOB max depth.          Final MY0 Monitoring Report (Project No. 100165)  Appendices  Crane Stream and Wetland Mitigation Site Restoration Systems, LLC  Lee County, North Carolina April 2023  Appendix D: Hydrologic Data    Groundwater Gauge Soil Profiles     AXIOM ENVIRONMENTAL, INC 218 Snow Avenue Raleigh, North Carolina 27603 919-215-1693 Date:2/14/2023 Project/Site: 20-032/Crane County, State: Lee, North Carolina Sampling Point/ Coordinates:GW-1 35.363918, -79.223289 Investigator: W. Grant Lewis Soil Series: Color %Color %Type Location 0-8 10 YR 4/2 100 - - - - Sand 8-24 10 YR 4/1 95 10 YR 4/6 5 C M Sandy Clay Loam 24+ 4/10G 90 10 YR 4/6 10 C M Sandy Clay Loam Type: C=Concentration, D=Depletion, RM=Reduced Matrix, MS=Masked Sand Grains. Locaction: PL=Pore Lining, M=Matrix. North Carolina Licensed Soil Scientist Number: 1233 Signature: Name/Print: W. Grant Lewis Notes: Depth (inches) Matrix Mottling Texture SOIL BORING LOG AXIOM ENVIRONMENTAL, INC 218 Snow Avenue Raleigh, North Carolina 27603 919-215-1693 Date:2/14/2023 Project/Site: 20-032/Crane County, State: Lee, North Carolina Sampling Point/ Coordinates:GW-2 35.364841, -79.224065 Investigator: W. Grant Lewis Soil Series: Color %Color %Type Location 0-8 10 YR 3/1 100 - - - - Sandy Loam 8-12 10 YR 5/1 97 10 YR 4/6 3 C M Sandy Loam 12+ 10 YR 5/1 95 10 YR 4/6 5 C M Sandy Clay Loam Type: C=Concentration, D=Depletion, RM=Reduced Matrix, MS=Masked Sand Grains. Locaction: PL=Pore Lining, M=Matrix. North Carolina Licensed Soil Scientist Number: 1233 Signature: Name/Print: W. Grant Lewis Notes: Depth (inches) Matrix Mottling Texture SOIL BORING LOG AXIOM ENVIRONMENTAL, INC 218 Snow Avenue Raleigh, North Carolina 27603 919-215-1693 Date:2/14/2023 Project/Site: 20-032/Crane County, State: Lee, North Carolina Sampling Point/ Coordinates:GW-3 35.365244, -79.223755 Investigator: W. Grant Lewis Soil Series: Color %Color %Type Location 0-18 10 YR 3/1 100 - - - - Sandy Loam 18-20 10 YR 3/1 95 10 YR 4/6 5 C M Sandy Clay Loam 20+ 4/5BG 100 - - - - Sandy Clay Loam Type: C=Concentration, D=Depletion, RM=Reduced Matrix, MS=Masked Sand Grains. Locaction: PL=Pore Lining, M=Matrix. North Carolina Licensed Soil Scientist Number: 1233 Signature: Name/Print: W. Grant Lewis Notes: Depth (inches) Matrix Mottling Texture SOIL BORING LOG AXIOM ENVIRONMENTAL, INC 218 Snow Avenue Raleigh, North Carolina 27603 919-215-1693 Date:2/14/2023 Project/Site: 20-032/Crane County, State: Lee, North Carolina Sampling Point/ Coordinates:GW-4 35.365381, -79.223935 Investigator: W. Grant Lewis Soil Series: Color %Color %Type Location 0-3 10 YR 3/1 100 - - - - Sandy Loam 3-8 10 YR 6/3 100 - - - - Sand 8+ 10 YR 7/2 90 10 YR 5/6 10 C M Sandy Loam Type: C=Concentration, D=Depletion, RM=Reduced Matrix, MS=Masked Sand Grains. Locaction: PL=Pore Lining, M=Matrix. North Carolina Licensed Soil Scientist Number: 1233 Signature: Name/Print: W. Grant Lewis Notes: Depth (inches) Matrix Mottling Texture SOIL BORING LOG AXIOM ENVIRONMENTAL, INC 218 Snow Avenue Raleigh, North Carolina 27603 919-215-1693 Date:2/14/2023 Project/Site: 20-032/Crane County, State: Lee, North Carolina Sampling Point/ Coordinates:GW-5 35.365311, -79.224294 Investigator: W. Grant Lewis Soil Series: Color %Color %Type Location 0-30+ 10 YR 2/1 100 - - - - Sandy Clay Loam Type: C=Concentration, D=Depletion, RM=Reduced Matrix, MS=Masked Sand Grains. Locaction: PL=Pore Lining, M=Matrix. North Carolina Licensed Soil Scientist Number: 1233 Signature: Name/Print: W. Grant Lewis Notes: Depth (inches) Matrix Mottling Texture SOIL BORING LOG AXIOM ENVIRONMENTAL, INC 218 Snow Avenue Raleigh, North Carolina 27603 919-215-1693 Date:2/14/2023 Project/Site: 20-032/Crane County, State: Lee, North Carolina Sampling Point/ Coordinates:GW-6 35.365957, -79.223721 Investigator: W. Grant Lewis Soil Series: Color %Color %Type Location 0-24+ 10 YR 3/1 100 - - - - Silty Clay Loam Type: C=Concentration, D=Depletion, RM=Reduced Matrix, MS=Masked Sand Grains. Locaction: PL=Pore Lining, M=Matrix. North Carolina Licensed Soil Scientist Number: 1233 Signature: Name/Print: W. Grant Lewis Notes: Depth (inches) Matrix Mottling Texture SOIL BORING LOG AXIOM ENVIRONMENTAL, INC 218 Snow Avenue Raleigh, North Carolina 27603 919-215-1693 Date:2/14/2023 Project/Site: 20-032/Crane County, State: Lee, North Carolina Sampling Point/ Coordinates:GW-7 35.36660, -79.224025 Investigator: W. Grant Lewis Soil Series: Color %Color %Type Location 0-4 10 YR 3/1 100 - - - - Sandy Clay Loam 4-10 10 YR 4/1 95 10 YR 4/6 5 C M Sandy Clay Loam 10-24+ 10 YR 4/1 90 10 YR 4/6 10 C M Sandy Clay Loam Type: C=Concentration, D=Depletion, RM=Reduced Matrix, MS=Masked Sand Grains. Locaction: PL=Pore Lining, M=Matrix. North Carolina Licensed Soil Scientist Number: 1233 Signature: Name/Print: W. Grant Lewis Notes: Depth (inches) Matrix Mottling Texture SOIL BORING LOG AXIOM ENVIRONMENTAL, INC 218 Snow Avenue Raleigh, North Carolina 27603 919-215-1693 Date:2/14/2023 Project/Site: 20-032/Crane County, State: Lee, North Carolina Sampling Point/ Coordinates:GW-8 35.366688, -79.223695 Investigator: W. Grant Lewis Soil Series: Color %Color %Type Location 0-8 10 YR 4/1 100 - - - - Sandy Loam 8-12 10 Yr 4/2 100 - - - - Sandy Loam 12-24 10 YR 4/2 93 10 YR 4/6 7 C M Sandy Clay Loam 24+ 10 YR 4/2 90 10 YR 4/6 10 C M Sandy Clay Loam Type: C=Concentration, D=Depletion, RM=Reduced Matrix, MS=Masked Sand Grains. Locaction: PL=Pore Lining, M=Matrix. North Carolina Licensed Soil Scientist Number: 1233 Signature: Name/Print: W. Grant Lewis Notes: Depth (inches) Matrix Mottling Texture SOIL BORING LOG AXIOM ENVIRONMENTAL, INC 218 Snow Avenue Raleigh, North Carolina 27603 919-215-1693 Date:2/14/2023 Project/Site: 20-032/Crane County, State: Lee, North Carolina Sampling Point/ Coordinates:GW-9 35.366699, -79.223292 Investigator: W. Grant Lewis Soil Series: Color %Color %Type Location 0-30+ 10 YR 2/1 100 - - - - Sandy Clay Loam Type: C=Concentration, D=Depletion, RM=Reduced Matrix, MS=Masked Sand Grains. Locaction: PL=Pore Lining, M=Matrix. North Carolina Licensed Soil Scientist Number: 1233 Signature: Name/Print: W. Grant Lewis Notes: Depth (inches) Matrix Mottling Texture SOIL BORING LOG AXIOM ENVIRONMENTAL, INC 218 Snow Avenue Raleigh, North Carolina 27603 919-215-1693 Date:2/14/2023 Project/Site: 20-032/Crane County, State: Lee, North Carolina Sampling Point/ Coordinates:GW-10 35.366487, -79.222511 Investigator: W. Grant Lewis Soil Series: Color %Color %Type Location 0-20 10 YR 3/1 100 - - - - Silty Clay Loam 20+ 4/5 BG 100 - - - - Silty Clay Loam Type: C=Concentration, D=Depletion, RM=Reduced Matrix, MS=Masked Sand Grains. Locaction: PL=Pore Lining, M=Matrix. North Carolina Licensed Soil Scientist Number: 1233 Signature: Name/Print: W. Grant Lewis Notes: Depth (inches) Matrix Mottling Texture SOIL BORING LOG AXIOM ENVIRONMENTAL, INC 218 Snow Avenue Raleigh, North Carolina 27603 919-215-1693 Date:2/14/2023 Project/Site: 20-032/Crane County, State: Lee, North Carolina Sampling Point/ Coordinates:GW-11 35.366820, -79.222421 Investigator: W. Grant Lewis Soil Series: Color %Color %Type Location 0-8 10 YR 3/1 100 - - - - Silty Clay Loam 8-30 4/5 BG 100 - - - - Silty Clay Loam Type: C=Concentration, D=Depletion, RM=Reduced Matrix, MS=Masked Sand Grains. Locaction: PL=Pore Lining, M=Matrix. North Carolina Licensed Soil Scientist Number: 1233 Signature: Name/Print: W. Grant Lewis Notes: Depth (inches) Matrix Mottling Texture SOIL BORING LOG AXIOM ENVIRONMENTAL, INC 218 Snow Avenue Raleigh, North Carolina 27603 919-215-1693 Date:2/14/2023 Project/Site: 20-032/Crane County, State: Lee, North Carolina Sampling Point/ Coordinates:GW-12 35.367102, -79.222764 Investigator: W. Grant Lewis Soil Series: Color %Color %Type Location 0-24+ 10 YR 3/1 100 - - - - Sandy Clay Loam Type: C=Concentration, D=Depletion, RM=Reduced Matrix, MS=Masked Sand Grains. Locaction: PL=Pore Lining, M=Matrix. North Carolina Licensed Soil Scientist Number: 1233 Signature: Name/Print: W. Grant Lewis Notes: Depth (inches) Matrix Mottling Texture SOIL BORING LOG AXIOM ENVIRONMENTAL, INC 218 Snow Avenue Raleigh, North Carolina 27603 919-215-1693 Date:2/14/2023 Project/Site: 20-032/Crane County, State: Lee, North Carolina Sampling Point/ Coordinates:GW13 35.367350, -79.223216 Investigator: W. Grant Lewis Soil Series: Color %Color %Type Location 0-4 10 YR 3/1 100 - - - - Sandy Clay Loam 4-18 10 YR 4/2 93 10 YR 4/6 7 C M Sandy Clay Loam 18+ 10 YR 5/1 100 - - - - Sandy Clay Loam Type: C=Concentration, D=Depletion, RM=Reduced Matrix, MS=Masked Sand Grains. Locaction: PL=Pore Lining, M=Matrix. North Carolina Licensed Soil Scientist Number: 1233 Signature: Name/Print: W. Grant Lewis Notes: Depth (inches) Matrix Mottling Texture SOIL BORING LOG AXIOM ENVIRONMENTAL, INC 218 Snow Avenue Raleigh, North Carolina 27603 919-215-1693 Date:2/14/2023 Project/Site: 20-032/Crane County, State: Lee, North Carolina Sampling Point/ Coordinates:GW14 35.367330, -79.224318 Investigator: W. Grant Lewis Soil Series: Color %Color %Type Location 0-12 10 YR 2/1 100 - - - - Sandy Loam 12-30+ 10 YR 5/2 97 10 YR 4/6 3 C M Sandy Loam Type: C=Concentration, D=Depletion, RM=Reduced Matrix, MS=Masked Sand Grains. Locaction: PL=Pore Lining, M=Matrix. North Carolina Licensed Soil Scientist Number: 1233 Signature: Name/Print: W. Grant Lewis Notes: Depth (inches) Matrix Mottling Texture SOIL BORING LOG AXIOM ENVIRONMENTAL, INC 218 Snow Avenue Raleigh, North Carolina 27603 919-215-1693 Date:2/14/2023 Project/Site: 20-032/Crane County, State: Lee, North Carolina Sampling Point/ Coordinates:GW15 35.367921, -79.223351 Investigator: W. Grant Lewis Soil Series: Color %Color %Type Location 0-4 10 YR 2/1 100 - - - - Sandy Loam 4-8 10 YR 4/1 100 - - - - Sandy Loam 8-20+ 10 YR 3/1 100 - - - - Sandy Clay Loam Type: C=Concentration, D=Depletion, RM=Reduced Matrix, MS=Masked Sand Grains. Locaction: PL=Pore Lining, M=Matrix. North Carolina Licensed Soil Scientist Number: 1233 Signature: Name/Print: W. Grant Lewis Notes: Depth (inches) Matrix Mottling Texture SOIL BORING LOG   Final MY0 Monitoring Report (Project No. 100165)  Appendices  Crane Stream and Wetland Mitigation Site Restoration Systems, LLC  Lee County, North Carolina April 2023  Appendix E: Project Timeline and Contact Info    Table 11. Project Timeline  Table 12. Project Contacts    Table 11. Project Timeline Data Collection Task Completion or Activity or Deliverable Complete Deliverable Submission Project Instituted NA 30‐Jul‐20 Mitigation Plan Approved NA 14‐Feb‐22 Construction (Grading) Completed NA 15‐Jul‐22 Planting Completed NA 3‐Feb‐23 As‐built Survey Completed NA 1‐Mar‐23 MY‐0 Baseline Report Jan‐23 Mar‐23 MY1+ Monitoring Reports Remediation Items (e.g. beaver removal, supplements, repairs etc.) Encroachment     Table 12. Project Contacts Provider Restoration Systems, LLC 1101 Haynes Street, Suite 211 Raleigh, NC 27604 Mitigation Provider POC Ray Holz 919‐755‐9490 Designer Axiom Environmental, Inc. 218 Snow Ave Raleigh, NC 27603 Primary project design POC Grant Lewis 919‐215‐1693 Construction Contractor Land Mechanics Designs, Inc. 126 Circle G Lane Willow Spring, NC 27592 Primary construction POC Charles Hill 919‐639‐6132 Crane Site/100165   Final MY0 Monitoring Report (Project No. 100165)  Appendices  Crane Stream and Wetland Mitigation Site Restoration Systems, LLC  Lee County, North Carolina April 2023  Appendix F: Record Drawings (As‐Built Survey)