Loading...
HomeMy WebLinkAboutNCC231795_ESC Approval Submitted_20230612 ROY COOPER ..,,,..,,,N •)Governor ` ELIZABETH S.BISER . w Secretary �` DOUGLAS R.ANSEL NORTH CAROLINA Interim Director Environmental Quality June 5, 2023 LETTER OF APPROVAL WITH MODIFICATIONS James J. Schad, Property Owner 1109 East Ozark Avenue Gastonia,North Carolina 28054 RE: Project Name: Schad Outdoor Storage Project Project ID: STANL-2023-024 Acres Approved: 2.5 County: Stanly City: New London Location: Russell Road River Basin: Yadkin Stream Classification: Other Submitted By: Kevin E. Herring Engineering Date Received by LQS: May 8, 2023 Plan Type: New Dear Mr. Schad: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval with Modifications. The Modifications Required for Approval are listed on the attached page. This plan approval shall expire three (3)years following the date of approval, if no land-disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC)under the NCG010000 Construction General Permit. After the form is reviewed and found to be complete,you will receive a link with payment instructions for the $100 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project, you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the eNOI form to the Stormwater Program staff the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a new COC. Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. D E ?), North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources Mooresville Regional Office 1610 East Center Avenue,Suite 301 I Mooresville,North Carolina 28115 NORTH CAROUNA Department al Environmental Oa sare 704.663.1699 Letter of Approval with Modifications James J. Schad June 5, 2023 Page 2 of 3 2. The NCGO1 permit and the COC, once it is received. 3. Records of inspections made during the previous 30 days. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land- disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form,which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Your cooperation is appreciated. Sincerely, Is!George Adams George D. Adams Assistant Regional Engineer Land Quality Section GDA/cys Enclosure: Certificate of Approval Modifications Required for Approval NCG01 Fact Sheet c: Inspection Department ec: Kevin E. Herring Engineering Attention: Kevin Herring, PE kevin@kevinherringengineering.com Letter of Approval with Modifications James J. Schad June 5, 2023 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: Schad Outdoor Storage Project Project ID: STANL-2023-024 County: Stanley Reviewed by: George D. Adams 1. Add protection and stabilization to the basin outlet to protect against erosion. 2. Additional measures may be required- The applicant is responsible for the control of sediment on-site. If the approved erosion and sedimentation control measures prove insufficient, the applicant must take those additional steps necessary to stop sediment from leaving this site. [15A NCAC 4B .0115]