HomeMy WebLinkAboutSWA000200_Supplemental Info Review_20230607 Action History (UTC-05:00)Eastern Time(US&Canada)
Submit by Anonymous User 6/7/2023 9:32:39 AM(Supplemental Submittal)
Accept by Kaitlin Peck 6/12/2023 9:20:44 AM (Supplemental Info Submittal)
• The task was assigned to bethany.georgoulias 6/7/2023 9:32:40 AM
• bethany.georgoulias reassigned the task to Kaitlin Peck 6/8/2023 12:05:24 PM
0 1 think this one is easy-all plan sheets and nothing to generate pages for.
=DEQ •
Submittal from 6/7/2023
Permit Information:
Please provide specific permit details below.
................................................................................................................................................................................................................................................................................................................................................................................................
What Type of Permit? Choose one:
* NPDES Industrial or MS4 Permit
State Stormwater(Post-Construction)Permit
Other
Permit Number* SWA000200
Begins with"SW","NCG",or"NCS"
What DEQ Office is Reviewer:Please correct if misidentified,close this review form,and reassign task to the appropriate contact.
the Primary Contact? Central Office
*
Washington Regional Office(Attn: Carl Dunn)
Wilmington Regional Office(Attn:Christine Hall)
................................................................................................................................................................................................................................................................................................................................................................................................
Project Name* Stapleton Subdivision Phases 1&2
Owner/Operator* Clayton Properties Group
County: Forsyth
Submitter Name:* Jeremy McCall
Who is submitting this information?
E-mail Address:* jeremy@greenmountianengineers.com
Phone Number* 3362949394
Additional E-mail for (Optional)
Submittal
Confirmation:
State Stormwater (Post-Construction) Information Uploads
Choose file type and upload attachment(Reviewer may remove unnecessary submittals)
File Type* Plansheet-Proposed Conditions/Site Plan
File Upload Click the upload button,or drag and drop files to attach
20-058_STAP_CD-PH1-LD-001-C-0.00 COVER.pdf 542.72KB
20-058 STAP CD-PH1-LD-001-C-1.00INTL
575.42K6
COND.pdf
20-058_STAP_CD-PH1-LD-001-C-2.00 SITE.pdf 1.06MB
20-058_STAP_CD-PH1-LD-001-C-2.01 PH1 LAY.pdf 623.8KB
20-058 STAP CD-PH1-LD-001-C-2.02 PH1 LAY
640.75K6
(2).pdf
20-058 STAP CD-PH1-LD-001-C-2.03 SPIRIT
366.12K6
P&P.pdf
20-058 STAP CD-PH1-LD-001-C-2.04 LATIGO
415.45KB
P&P.pdf
20-058 STAP CD-PH1-LD-001-C-2.05 STIRRUP
440.54K6
P&P.pdf
20-058 STAP CD-PH1-LD-001-C-2.06 CINCH
368.46KB
P&P.pdf
20-058 STAP CD-PH1-LD-001-C-2.07 HALTER
303.82K6
DRIVE P&P.pdf
20-058 STAP CD-PH1-LD-001-C-2.08 TACK
296.13K6
P&P.pdf
20-058 STAP CD-PH1-LD-001-C-2.09 SSWR
305.07K6
P&P.pdf
20-058 STAP CD-PH1-LD-001-C-2.10 SSWR
500.76K6
P&P.pdf
20-058 STAP CD-PH1-LD-001-C-2.15 SPIRIT
311.46KB
CROSSING.pdf
20-058 STAP CD-PH1-LD-001-C-2.16 LATIGO
357.23K6
CROSSING 1.pdf
20-058 STAP CD-PH1-LD-001-C-3.00
1.38M6
GRADING.pdf
20-058 STAP CD-PH1-LD-001-C-3.01 PH1 GRADE
947.68K6
DRIVEWAY.pdf
20-058 STAP CD-PH1-LD-001-C-3.02 PH1 GRADE
1.02M6
DRIVEWAY.pdf
20-058 STAP CD-PH1-LD-001-C-3.03 PH2 GRADE
1.7MB
DRIVEWAY.pdf
20-058 STAP CD-PH1-LD-001-C-3.04 PH1
951.85K6
STAKING.pdf
20-058 STAP CD-PH1-LD-001-C-3.05 PH1
991.67K6
STAKING.pdf
20-058 STAP CD-PH1-LD-001-C-4.00 ESC
1.31M6
INTL.pdf
20-058 STAP CD-PH1-LD-001-C-4.01 PH1 ESC
- - 887.12K6
INIT.pdf
20-058 STAP CD-PH1-LD-001-C-4.02 PH1 ESC
- - 1.2MB
INIT.pdf
20-058 STAP CD-PH1-LD-001-C-4.03 PH1 ESC
- - 1.49M6
POST.pdf
20-058 STAP CD-PH1-LD-001-C-4.04 PH1 ESC
- - 1.74M6
POST(2).pdf
20-058 STAP CD-PH1-LD-001-C-4.05 ESC
2.21 MB
SFH.pdf
20-058 STAP CD-PH1-LD-001-C-4.06 ESC
1.33M6
DETAILS.pdf
20-058 STAP CD-PH1-LD-001-C-4.07 ESC
1.23M6
DETAILS.pdf
20-058 STAP CD-PH1-LD-001-C-5.00 SITE
2.34M6
DETAILS.pdf
20-058 STAP CD-PH1-LD-001-C-5.01 UTIL
o a�nno
J.I I IVIU
DETAILS.pdf
20-058 STAP CD-PH1-LD-001-C-6.00 STM
1.77M6
CALCS.pdf
20-058_STAP_CD-PH1-LD-001-C-7.00 RW-PFR.pdf 465.49KB
20-058_STAP_CD-PH1-LD-001-C-7.01 RW-PFR.pdf 510.67KB
20-058_STAP_CD-PH1-LD-001-C-7.02 RW-PFR.pdf 1.29MB
20-058 STAP CD-PH1-LD-001-C-7.03 RW-
582.54KB
COOPER.pdf
20-058 STAP CD-PH1-LD-001-C-7.04 RW-
420.26K6
COOPER.pdf
20-058 STAP CD-PH1-LD-001-C-7.05 RW-
1.17MB
COOPER.pdf
20-058 STAP CD-PH1-LD-001-PH2 C-2.12 LATIGO
301.79KB
P&P.pdf
20-058 STAP CD-PH1-LD-001-PH2 C-2.13
271.17K6
INTERNAL P&P.pdf
20-058 STAP CD-PH1-LD-001-PH2 C-2.14
219.25K6
INTERNAL P&P(2).pdf
20-058 STAP CD-PH1-LD-001-PH2-C-2.11
363.69K6
STIRRUP P&P.pdf
Only PDF files are accepted.
Is this project funded No
with ARPA grant Yes
funds?
Uploads contain NO
Confidential YES
Information* NOTE:The following information cannot be claimed as confidential:the name and address of any permit applicant
or permittee,permit applications,permits,effluent data,information required by NPDES application forms provided
by the Director inclusive of all forms and attachments[Ref.40 CFR 122.7(b)and(c)].
Notes about the attachments:
* By checking the box and signing box below, I certify that:
cl I have given true,accurate,and complete information on this form;
• I agree that submission of this Supplemental Information form is a"transaction"subject to Chapter 66,Article 40 of the
NC General Statutes(the"Uniform Electronic Transactions Act)
• I agree to conduct this transaction by electronic means pursuant to Chapter 66,Article 40 of the NC General Statutes
(the"Uniform Electronic Transactions Act');
d I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written
signature;AND
o I intend to electronically sign and submit the Supplemental Information Upload form.
Full Name:* Jeremy McCall
Signature:
�1�lwyle6h.16mll
Date Submitted: 06/07/2023
Initial Review
Verify Permit No.* IMPORTANT:REVIEWER SHOULD VERIFY and revise here if necessary.
SWA000200
Who needs a Copy?* Reviewer selections will only be required for offices checked here.
Central Office Staff
Regional Office Stormwater Contact
State Stormwater RO Staff
No Copy Needed
Central Office Reviewer:*
Notifies CO Staff with Email
Jim Farkas
Any Comments or
Added Info for CO
Staff Reviewer?
Review Date* 06/12/2023