HomeMy WebLinkAboutNCC231803_ESC Approval Submitted_20230609 Iredell County Planning & Development
Erosion Control Section
IREDELL 349 North Center Street
COUNTY NC P.O. Box788
Statesville, NC 28687
Date: March 17th 2023
LETTER OF APPROVAL WITH MODIFICATIONS
Adam McCurry
EM Squared Properties, LLC
104 Mull St.
Morganton,NC 28655
RE: Project Name: Taco Bell
Acres Approved with Modifications: 1.8
Project ID: MVLLE-2023-062
Project Location: PIN 4657852668.000
Submitted By: ESP Associates, Inc.
Date Received: February 23`d 2023
Plan Type: New
Dear Mr. McCurry:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to
be acceptable with modifications and herby issue this Letter of Approval with Modifications.
Modifications must be received in this office no later than two weeks prior to the project start
date. Failure to submit modified plans can result in a violation and fine under the Iredell County
Land Development Code. The Modifications required for Approval are listed on the attached
page. The Certificate of Approval issued by Iredell County must be posted at the job site. This
plan approval shall expire three (3)years following the date of this approval as is required by
Title 15A NCAC 4B.0129 and Appendix H of the Iredell County Land Development Code.
Title 15A NCAC 4B 0118(a) and Appendix H of the Iredell County Land Development Code
requires that a copy of the approved erosion control plan be on file at the job site. Any
amendments and/or revisions to the approved plan must be reviewed and approved prior to
implementation in order for the site to remain in compliance. Failure to submit plans for approval
may result in administrative actions and/or penalties as indicated in the Iredell County Land
Development Code. Also,this letter gives notice as required by G.S. 113A-61.1(a) and Appendix
H of the Iredell County Land Development Code, of our right of periodic inspection to insure
compliance with the approved plan.
Iredell County's Sedimentation Pollution Control Program is performance-oriented, requiring
protection of existing natural resources and adjoining properties. If, following the
Letter of Approval with Modifications
Taco Bell
March 17th 2023
Page 2 of 3
commencement of this project, it is determined that the erosion and sedimentation control plan is
inadequate to meet the requirements of the Iredell County Land Development Code and the
Sedimentation Pollution Control Act of 1973, (North Carolina General Statute 113A-51 through
66),this office may require revisions to the plan and implementation of the revisions to insure
compliance with the Act and Code.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and
State water quality laws, regulations, and rules. In addition, local city or county ordinances or
rules may also apply to this land-disturbing activity. This approval does not supersede any other
permit or approval. It is the responsibility of the applicant to obtain all other required permits or
approvals.
As of May 1,2019, all new construction activities are required to complete and submit an
electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the
NCG010000 Construction Stormwater General Permit. This form MUST be submitted prior to
the commencement of any land disturbing activity on the above named project. The NOI form
may be accessed at deq.nc.gov/NCG01. Please direct questions about the NOI form to Annette
Lucas at Annette.lucas@ncdenr.gov or Paul Clark at Paul.clark@ncdenr.gov. After you submit a
complete and correct NOI Form, a COC will be emailed to you within three business days. As of
May 1, 2019, a$100 fee will be charged annually. This fee is to be sent to the DEMLR
Stormwater Central Office staff in Raleigh.
Please note that this approval is based in part on the accuracy of the information provided in the
Financial Responsibility Form, which you provided. You are requested to file an amended form
if there is any change in the information included on the form. In addition, it is required that this
office to be notified of the proposed starting date for this project. Failure to notify this office of
the starting date may result in a Notice of Violation and civil penalty. As required in the
approved plan construction sequencing, please schedule a preconstruction conference with our
staff prior to land disturbing activity.
Your cooperation is appreciated.
Sincerely,
gro'74t1/."--, ZJPP:;--d--
Jonathan Williams, CESSWI
Erosion Control Coordinator
Enclosures: Modifications
Fact Sheet on the New NCGO1 Permit
Permit
Letter of Approval with Modifications
Taco Bell
March 17th 2023
Page 3 of 3
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: Taco Bell
Project ID: MVLLE-2023-062
County: Iredell
Reviewed by: Jonathan Williams
Required changes are designated as "RC" under legal authority from NC
General Statutes Chapter 113A Article 4 and the Iredell County Land
Development Code.
Suggested changes are designated as "SC" for improvement of the plan.
1. In Phase 1, install a berm to direct runoff away from the existing drop inlet and enable a
dispersed sheet flow to the perimeter silt fencing. —RC
2. Install porous baffles in the existing stormwater basin until all disturbed drainage has
been stabilized. Provide detail.—RC
3. Turn silt fencing below the stormwater pond up on each side. —RC
4. Install additional silt fence to cover both sides of the sewer connection disturbance and
basin access disturbance. -RC
Fact Sheet on the New NCG01 Permit E CV)
April 20192.M�E .
The NC Construction General Permit(also known as"NCG01")was renewed on April 1,2019.The updated permit
does not significantly change the measures that are required to be implemented on construction sites. However,
there are some organizational and technical updates to the permit as described below. Most notably,there is a new
process in which construction sites will obtain official coverage under an NCGO1 permit through an electronic
process. DEMLR worked with a broad team of stakeholders to make all of these updates. If you have questions,
contact Annette Lucas at Annette.lucas@ncdenr.gov or(919) 707-3639.
Organizational Updates Acronyms to Know
The new permit: COC: Certificate of Coverage, proof of coverage under an NCGO1 permit
• Repeats state requirements for E&SC DEMLR: NC Division of Energy, Mineral, and Land Resources
Plans and organizes them with federal E&SC: Erosion &Sedimentation Control
construction activity requirements; e-NOI: Notice of Intent,application form for the NCGO1 permit
• Is clearly organized by topic; and e-NOT: Notice of Termination,form for closing out the NCGO1 permit
• Has less text and more tables. SWPPP: Stormwater Pollution Prevention Plan, required by the NCG01
Technical Updates
The new permit:
• Requires that the E&SC Plan meet
SWPPP requirements(p. 2);
• Provides a list of items that must be
included in the SWPPP,such as the T4
construction sequence, plans,
calculations,etc. (p. 2-4);1
• Has updated language on bypasses and •
upsets that is tailored to construction -
activities (p. 10);
• Puts all timeframes for inspections,
record-keeping and reporting in The NCGO1 Process
"calendar days"for clarity and The new NCG01 applies to permits approved on or after April 1,2019.
consistency(p. 11-14);2
• Changes the inspection frequency Permittees will no longer receive a copy of the NCGO1 permit in the mail
with their E&SC Plan approvals and be considered as covered under the
(during business hours)to at least permit. Federal rules require that DEMLR receive an NOI on each
once per 7 calendar days and after construction project and issue each construction project its own COC.
every storm >1.0 inch (previously 0.5
inch);3 and Under the new NCG01 process,construction sites will continue to
• Excludes weekends,state and federal receive approval for E&SC Plans from either DEMLR or the delegated
holidays from normal business hours local E&SC program just like before. After receiving E&SC Plan approval,
unless construction activities take permittees will officially obtain coverage under the NCGO1 by
place (p. 23). completing an a-NOI (available at deq.nc.gov/NCG01). The e-NOI will
only take about 20 minutes to fill out and submit on-line.
1 This list is based on website guidance
by the DEMLR Sediment Program. Initially,there will be no charge associated with applying for an NCG01
2 The number of calendar days was permit but on or around June 1, 2019, DEMLR will begin charging a $100
selected to be as equivalent as annual general permit fee as required per§143-215.3D.
possible with the previous permit. DEMLR is working on creating a single application form that will allow an
3 The intent is to provide predictability applicant to simultaneously apply for an E&SC permit and an NCG01
to the inspection schedule. COC.That effort is part of a larger Permit Transformation project at
DEMLR.
IREDELL COUNTY
IREDELL Erosion Control Permit
Permit#: EC-2023-17344 Parcel#: 4657852668.000
Issued Date: March 17,2023 Expiration Date: March 16,2026
Project Address: 349 E PLAZA DR Project:
MOORESVILLE,NC 28115
Owner: EM Squared Properties, LLC Contractor:
Address: 104 Mull Street Address:
Morganton, NC 28655
Phone: 8284328307 Phone:
Project Details
SQ Ft: 0 Valuation: $0.00
Permit Fees
Name Amount Paid Due
Added Acreage Fee for Erosion $350.00 $350.00 $0.00
Totals: $350.00 $350.00 $0.00
Notice
Insert a permit notice prefix in the report text bank,entry:Permit_Notice
Page 1 of 1
RECEIPT (REC-007330-2023)
FOR IREDELL COUNTY
BILLING CONTACT
Adam McCurry
EM Squared Properties, LLC
104 Mull Street
Morganton, Nc 28655
A'O6hshad 1t:
Payment Date: 02/24/2023
Reference Number Fee Name Transaction Type Payment Method Amount Paid
EC-2023-17344 Added Acreage Fee for Erosion Fee Payment Check#6540 $350.00
349 E Plaza Dr Mooresville, NC 28115 SUB TOTAL $350.00
TOTAL $350.00
February 24,2023 2:51 PN IREDELL COUNTY,349 North Center St.,Statesville,NC 28677 Page 1 of 1