Loading...
HomeMy WebLinkAboutNCC231803_ESC Approval Submitted_20230609 Iredell County Planning & Development Erosion Control Section IREDELL 349 North Center Street COUNTY NC P.O. Box788 Statesville, NC 28687 Date: March 17th 2023 LETTER OF APPROVAL WITH MODIFICATIONS Adam McCurry EM Squared Properties, LLC 104 Mull St. Morganton,NC 28655 RE: Project Name: Taco Bell Acres Approved with Modifications: 1.8 Project ID: MVLLE-2023-062 Project Location: PIN 4657852668.000 Submitted By: ESP Associates, Inc. Date Received: February 23`d 2023 Plan Type: New Dear Mr. McCurry: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and herby issue this Letter of Approval with Modifications. Modifications must be received in this office no later than two weeks prior to the project start date. Failure to submit modified plans can result in a violation and fine under the Iredell County Land Development Code. The Modifications required for Approval are listed on the attached page. The Certificate of Approval issued by Iredell County must be posted at the job site. This plan approval shall expire three (3)years following the date of this approval as is required by Title 15A NCAC 4B.0129 and Appendix H of the Iredell County Land Development Code. Title 15A NCAC 4B 0118(a) and Appendix H of the Iredell County Land Development Code requires that a copy of the approved erosion control plan be on file at the job site. Any amendments and/or revisions to the approved plan must be reviewed and approved prior to implementation in order for the site to remain in compliance. Failure to submit plans for approval may result in administrative actions and/or penalties as indicated in the Iredell County Land Development Code. Also,this letter gives notice as required by G.S. 113A-61.1(a) and Appendix H of the Iredell County Land Development Code, of our right of periodic inspection to insure compliance with the approved plan. Iredell County's Sedimentation Pollution Control Program is performance-oriented, requiring protection of existing natural resources and adjoining properties. If, following the Letter of Approval with Modifications Taco Bell March 17th 2023 Page 2 of 3 commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Iredell County Land Development Code and the Sedimentation Pollution Control Act of 1973, (North Carolina General Statute 113A-51 through 66),this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act and Code. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-disturbing activity. This approval does not supersede any other permit or approval. It is the responsibility of the applicant to obtain all other required permits or approvals. As of May 1,2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction Stormwater General Permit. This form MUST be submitted prior to the commencement of any land disturbing activity on the above named project. The NOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the NOI form to Annette Lucas at Annette.lucas@ncdenr.gov or Paul Clark at Paul.clark@ncdenr.gov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. As of May 1, 2019, a$100 fee will be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it is required that this office to be notified of the proposed starting date for this project. Failure to notify this office of the starting date may result in a Notice of Violation and civil penalty. As required in the approved plan construction sequencing, please schedule a preconstruction conference with our staff prior to land disturbing activity. Your cooperation is appreciated. Sincerely, gro'74t1/."--, ZJPP:;--d-- Jonathan Williams, CESSWI Erosion Control Coordinator Enclosures: Modifications Fact Sheet on the New NCGO1 Permit Permit Letter of Approval with Modifications Taco Bell March 17th 2023 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: Taco Bell Project ID: MVLLE-2023-062 County: Iredell Reviewed by: Jonathan Williams Required changes are designated as "RC" under legal authority from NC General Statutes Chapter 113A Article 4 and the Iredell County Land Development Code. Suggested changes are designated as "SC" for improvement of the plan. 1. In Phase 1, install a berm to direct runoff away from the existing drop inlet and enable a dispersed sheet flow to the perimeter silt fencing. —RC 2. Install porous baffles in the existing stormwater basin until all disturbed drainage has been stabilized. Provide detail.—RC 3. Turn silt fencing below the stormwater pond up on each side. —RC 4. Install additional silt fence to cover both sides of the sewer connection disturbance and basin access disturbance. -RC Fact Sheet on the New NCG01 Permit E CV) April 20192.M�E . The NC Construction General Permit(also known as"NCG01")was renewed on April 1,2019.The updated permit does not significantly change the measures that are required to be implemented on construction sites. However, there are some organizational and technical updates to the permit as described below. Most notably,there is a new process in which construction sites will obtain official coverage under an NCGO1 permit through an electronic process. DEMLR worked with a broad team of stakeholders to make all of these updates. If you have questions, contact Annette Lucas at Annette.lucas@ncdenr.gov or(919) 707-3639. Organizational Updates Acronyms to Know The new permit: COC: Certificate of Coverage, proof of coverage under an NCGO1 permit • Repeats state requirements for E&SC DEMLR: NC Division of Energy, Mineral, and Land Resources Plans and organizes them with federal E&SC: Erosion &Sedimentation Control construction activity requirements; e-NOI: Notice of Intent,application form for the NCGO1 permit • Is clearly organized by topic; and e-NOT: Notice of Termination,form for closing out the NCGO1 permit • Has less text and more tables. SWPPP: Stormwater Pollution Prevention Plan, required by the NCG01 Technical Updates The new permit: • Requires that the E&SC Plan meet SWPPP requirements(p. 2); • Provides a list of items that must be included in the SWPPP,such as the T4 construction sequence, plans, calculations,etc. (p. 2-4);1 • Has updated language on bypasses and • upsets that is tailored to construction - activities (p. 10); • Puts all timeframes for inspections, record-keeping and reporting in The NCGO1 Process "calendar days"for clarity and The new NCG01 applies to permits approved on or after April 1,2019. consistency(p. 11-14);2 • Changes the inspection frequency Permittees will no longer receive a copy of the NCGO1 permit in the mail with their E&SC Plan approvals and be considered as covered under the (during business hours)to at least permit. Federal rules require that DEMLR receive an NOI on each once per 7 calendar days and after construction project and issue each construction project its own COC. every storm >1.0 inch (previously 0.5 inch);3 and Under the new NCG01 process,construction sites will continue to • Excludes weekends,state and federal receive approval for E&SC Plans from either DEMLR or the delegated holidays from normal business hours local E&SC program just like before. After receiving E&SC Plan approval, unless construction activities take permittees will officially obtain coverage under the NCGO1 by place (p. 23). completing an a-NOI (available at deq.nc.gov/NCG01). The e-NOI will only take about 20 minutes to fill out and submit on-line. 1 This list is based on website guidance by the DEMLR Sediment Program. Initially,there will be no charge associated with applying for an NCG01 2 The number of calendar days was permit but on or around June 1, 2019, DEMLR will begin charging a $100 selected to be as equivalent as annual general permit fee as required per§143-215.3D. possible with the previous permit. DEMLR is working on creating a single application form that will allow an 3 The intent is to provide predictability applicant to simultaneously apply for an E&SC permit and an NCG01 to the inspection schedule. COC.That effort is part of a larger Permit Transformation project at DEMLR. IREDELL COUNTY IREDELL Erosion Control Permit Permit#: EC-2023-17344 Parcel#: 4657852668.000 Issued Date: March 17,2023 Expiration Date: March 16,2026 Project Address: 349 E PLAZA DR Project: MOORESVILLE,NC 28115 Owner: EM Squared Properties, LLC Contractor: Address: 104 Mull Street Address: Morganton, NC 28655 Phone: 8284328307 Phone: Project Details SQ Ft: 0 Valuation: $0.00 Permit Fees Name Amount Paid Due Added Acreage Fee for Erosion $350.00 $350.00 $0.00 Totals: $350.00 $350.00 $0.00 Notice Insert a permit notice prefix in the report text bank,entry:Permit_Notice Page 1 of 1 RECEIPT (REC-007330-2023) FOR IREDELL COUNTY BILLING CONTACT Adam McCurry EM Squared Properties, LLC 104 Mull Street Morganton, Nc 28655 A'O6hshad 1t: Payment Date: 02/24/2023 Reference Number Fee Name Transaction Type Payment Method Amount Paid EC-2023-17344 Added Acreage Fee for Erosion Fee Payment Check#6540 $350.00 349 E Plaza Dr Mooresville, NC 28115 SUB TOTAL $350.00 TOTAL $350.00 February 24,2023 2:51 PN IREDELL COUNTY,349 North Center St.,Statesville,NC 28677 Page 1 of 1