HomeMy WebLinkAboutSW8970847_CURRENT PERMIT_20220824STORMWATER DIVISION CODING SHEET
POST -CONSTRUCTION PERMITS
PERMIT NO.
SW8 C 1 C)SSIF1
DOC TYPE
CURRENT PERMIT
❑ APPROVED PLANS
❑ HISTORICAL FILE
❑ COMPLIANCE EVALUATION INSPECTION
DOC DATE
2o22 ViS 2A
YYYYMMDD
ROY COOPER
Governor
EuzABETH S. BISER
Secretary
BRIAN WRENN
Director
August 24, 2022
Marine Corps Base Camp Lejeune
Attn: Neal Paul, Deputy Public Works Officer
1005 Michael Road
Camp Lejeune, NC 28547
NORTH CAROLINA
Environmental Quality
Subject: Permit Renewal
Post -Construction Stormwater Management Permit No. SW8 970847
Tactical Support Van Pad
Ouslow County
Dear Mr. Paul:
The Division of Energy, Mineral and Land Resources received a complete 8-year Permit Renewal Application for
the subject permit on August 23, 2022. The Division is hereby notifying you that permit SW8970847 has been
renewed, updated, and re -issued on August 24, 2022, as attached. Please be aware that the renewal and re -
issuance of this stormwater permit does not imply that the site is currently in compliance.
This permit shall be effective until March 7, 2030 and does not supersede any other agency permit that may be
required. The project shall be subject to the conditions and limitations as specified therein. This permit does not
impose new or increased stormwater control requirements; it clarifies the rules and requirements of this program
to provide you with a better understanding of your obligations under this permit. Failure to comply with these
requirements will result in future compliance problems. Please note that this permit is not transferable except
after notice to and approval by the Division.
If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request
an adjudicatory, hearing by filing a written petition with the Office of Administrative Hearings (OAH). The
written petition must conform to Chapter 150B of the North Carolina General Statutes and must be filed with the
OAH within thirty (30) days of receipt of this permit. You should contact the OAH with all questions regarding
the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center,
Raleigh, NC 27699-6714, or via telephone at 919-431-3000, or visit their website at www.NCOAH.com. Unless
such demands are made this permit shall be final and binding.
If you have any questions concerning this permit, please contact Ashley Smith in the Wilmington Regional
Office, at (910) 796-7215 or ashleym.smith@ncdenr.gov.
Sincerely,
li&v,z t%R
Brian Wrenn, Director
Division of Energy, Mineral and Land Resources
Enclosures: Attachment A — Designer's Certification Form
Attachment C — Permitting History
Renewal Application Documents
DES/ams: %Stormwater\Permits & Projects\ 1 997\970847 HD\2022 08 permit 970847
cc: Wilmington Regional Office Stormwater File
�V&North Carolina Department of Environmental Quality I Division of Energy, Mlneal and land Resources
_ ,/ Wilmington Regional Office 1127 Cardinal Drive Extension I Wilmington, North Carolina 28405
zaam. / 910.796.7215
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENTAL QUALITY
DIVISION OF ENERGY, MINERAL AND LAND RESOURCES
POST -CONSTRUCTION STORMWATER MANAGEMENT PERMIT
HIGH DENSITY DEVELOPMENT
In compliance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as
amended, and other applicable Laws, Rules, and Regulations promulgated and adopted by the North
Carolina Environmental Management Commission, including 15A NCAC 02H.1000 (1995 Rules) as
amended on January 1, 2017 (2017 Rules) (collectively, the "stormwater rules"),
PERMISSION IS HEREBY GRANTED TO
Marine Corps Base Camp Lejeune
Tactical Support Van Pad
Canal Street, Camp Lejeune, Onslow County
FOR THE
construction, management, operation and maintenance of built -upon area (BUA) for one (1) area of
redevelopment (the "redevelopment area") as well as BUA draining to one (1) wet detention pond
("stormwater control measures" or "SCMs") as outlined in the application, approved stormwater
management plans, supplement, calculations, operation and maintenance agreement, recorded
documents, specifications, and other supporting data (the "approved plans and specifications') as
attached and/or on file with and approved by the Division of Energy, Mineral and Land Resources (the
"Division" or "DEMLR"). The project shall be constructed, operated and maintained in accordance
with these approved plans and specifications. The approved plans and specifications are
incorporated by reference and are enforceable part of this permit.
This permit shall be effective from the date of issuance until March 7, 2030 and shall be subject to the
following specified conditions and limitations. The permit issued shall continue in force and effect until
the permittee files a request with the Division for a permit modification, transfer, renewal, or
rescission; however, these actions do not stay any condition. The issuance of this permit does not
prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or
terminating the permit for cause as allowed by the laws, rules, and regulations contained in Title 15A
NCAC 2H.1000 and NCGS 143-215.1 et.al.
APPLICABLE RULES. The drainage area identified as SW8 970219 Proposed Permit Boundary
is subject to the 1995 Rules and the 2017 Rules and as clarified in the 1995 Rules and the 2017
Rules specific conditions listed herein.
BUA REQUIREMENTS. The maximum amount of BUA allowed for the entire project is 376,357
square feet. The runoff from all BUA within the permitted high density drainage area of this
project must be directed into the permitted SCM. The BUA requirements and allocations for this
project are as follows:
Page 1 of 5
a. REDEVELOPMENT. The redevelopment portion of this project is exempt from permitting
requirements under the following conditions:
i. The project must be constructed as shown on the submitted plans.
ii. The redevelopment area proposes 62,058 square feet of BUA, which does not
exceed the existing BUA of 62,058 square feet. This permit does not provide any
allocation of BUA for future development within this redevelopment area.
iii. The proposed stormwater control piped collection system provides equal protection
of surface waters as the existing stormwater control piped collection system.
b. SCM BUA LIMITS. The SCM has been designed to handle the runoff from 314,299 square
feet of BUA within the delineated drainage area. The BUA for the future development is
limited to 64,314 square feet.
PERVIOUS AREA IMPROVEMENTS. At this time, none of the pervious area improvements
listed in G.S. 143-214.7(b2) or the Stormwater Design Manual have been proposed for this
project. Pervious area improvements will be allowed in this project if documentation is provided
demonstrating those improvements meet the requirements of the stormwater rule.
4. SCM REQUIREMENTS. The SCM requirements for this project are as follows:
SCM DESIGN (1995 Rules). The SCM is permitted based on the following design criteria
and as shown in the approved plans and specifications. This SCM must be provided and
maintained at the design condition.
Wet Pond
SCMs, identified as:
Pond 1
a.
Drainage Area, acres:
Onsite, subject to 1995 Rules, ft2:
Onsite, subject to 2017 Rules, ftz:
Offsite, ft2:
12.29
528,468
6,762
67,518
b.
Total Impervious Surfaces, ftz:
Onsite, subject to 1995 Rules, ftz:
Onsite, subject to 2017 Rules, ftz:
Offsite, ftz:
314,299
307,537
6,762
67,518
c.
Pond Design Depth, feet:
4
d.
TSS Removal Efficiency:
90
e.
Design Storm, inches:
1995 Rules
2017 Rules
1.0
1.5
f.
Permanent Pool (PP Elevation, FMSL:
16.4
Permitted PP Surface Area, ftz:
37,410
h.
Temporary Storage Elevation, FMSL:
17.24
i.
Permitted Storage Volume, ft3:
33,244
Controlling Orifice, inch 0 pipe:
3
k.
Orifice Flow Rate, cfs:
0.15
I.
Time to Drawdown, days:
2.0
m.
PP Volume, ft3:
31,468
n.
Forebay Volume, ft3:
8,000
o.
Receiving Stream/River Basin:
Southwest
Creek/White Oak
p.
Stream Index Number:
19-17- .05
q.
Classification of Water Body:
C, NSW
b. POND DISCHARGE (1995 Rules). A vegetated filter strip is not required for the discharge as
the wet detention pond(s) has(have) been designed for a 90% total suspended solids
removal efficiency.
c. PLANTING PLAN. The SCM landscape planting plan shown in the approved plans shall be
followed in its entirety during construction. After the plants are established, the operation
and maintenance agreement must be followed.
Page 2 of 5
d. FOUNTAINS (1995 Rules). Decorative spray fountains will be allowed in the stormwater
treatment system if calculations are provided documenting the permeant pool volume is
greater than 30,000 cubic feet.
e. IRRIGATION. If the wet pond is to be used for irrigation, it is recommended that some water
be maintained in the permanent pool, the vegetated shelf is planted with appropriate species
that can handle fluctuating conditions, and human health issues are addressed.
5. RECORDED DOCUMENT REQUIREMENTS. The stormwater rules require the following
documents to be recorded with the Office of the Register of Deeds:
a. EASEMENTS. All SCMs, stormwater collection systems, vegetated conveyances, and
maintenance access located on property owned by other persons or entities must be located
in permanent recorded easements or drainage easements as shown on the approved plans.
6. CONSTRUCTION. During construction, erosion shall be kept to a minimum and any eroded
areas of the on -site stormwater system will be repaired immediately.
a. PROJECT CONSTRUCTION, OPERATION AND MAINTENANCE. During construction, all
operation and maintenance for the project shall follow the Erosion Control Plan requirements
until the Sediment -Erosion Control devices are converted to SCMs or no longer needed.
Once the device is converted to a SCM, the permittee shall provide and perform the
operation and maintenance as outlined in the applicable section below.
b. SCM RESTORATION. If one or more of the SCMs are used as an Erosion Control device
and/or removed or destroyed during construction, it must be restored to the approved
stormwater design condition prior to close-out of the erosion control plan and/or project
completion and/or transfer of the stormwater permit. Upon restoration, a new or updated
certification will be required for the SCM(s) and a copy must be submitted to the appropriate
DEQ regional office.
MODIFICATIONS. No person or entity, including the permittee, shall alter any component
shown in the approved plans and specifications. Prior to the construction of any modification to
the approved plans, the permittee shall submit to the Director, and shall have received approval
for modified plans, specifications, and calculations including, but not limited to, those listed
below. For changes to the project or SCM that impact the certifications, a new or updated
certification(s), as applicable, will be required and a copy must be submitted to the appropriate
DEQ regional office upon completion of the modification.
a. Any modification to the approved plans and specifications, regardless of size including the
SCM(s), BUA, details, etc.
b. Redesign or addition to the approved amount of BUA or to the drainage area.
c. Further development, subdivision, acquisition, lease or sale of any, all or part of the project
and/or property area as reported in the approved plans and specifications.
d. Altering, modifying, removing, relocating, redirecting, regrading, or resizing of any
component of the approved SCM(s), stormwater collection system and/or vegetative
conveyance shown on the approved plan.
e. The construction of any allocated future BUA.
f. The construction of any infiltrating permeable pavement, #57 stone area, public trails, or
landscaping material to be considered a pervious surface that were not included in the
approved plans and specifications.
g. Other modifications as determined by the Director.
Page 3 of 5
DESIGNER'S CERTIFICATION. Upon completion of construction, prior to issuance of a
Certificate of Occupancy, and prior to operation of this permitted facility, the permittee shall
cause a certification from an appropriate designer for the system installed to be submitted,
certifying that the permitted facility has been installed in accordance with this permit, the
approved plans and specifications, and other supporting documentation. Any deviations from
the approved plans and specifications must be noted on the Certification. A modification may be
required for those deviations.
9. OPERATION AND MAINTENANCE. The permittee shall provide and perform the operation and
maintenance necessary, as listed in the signed operation and maintenance agreement, to
assure that all components of the permitted on -site stormwater system are maintained at the
approved design condition. The approved operation and maintenance agreement must be
followed in its entirety and maintenance must occur at the scheduled intervals.
a. CORRECTIVE ACTIONS REQUIRED. If the facilities fail to perform satisfactorily, the
permittee shall take immediate corrective actions. This includes actions required by the
Division and the stormwater rules such as the construction of additional or replacement on -
site stormwater systems. These additional or replacement measures shall receive a permit
from the Division prior to construction.
b. MAINTENANCE RECORDS. Records of maintenance activities must be kept and made
available upon request to authorized personnel of the Division. The records will indicate the
date, activity, name of person performing the work and what actions were taken.
10. PERMIT RENEWAL. A permit renewal request must be submitted at least 180 days prior to the
expiration date of this permit. The renewal request must include the appropriate application,
documentation and the processing fee as outlined in 15A NCAC 02H.1045(3).
11. CHANGES TO THE PROJECT NAME, PERMITTEE NAME OR CONTACT INFORMATION.
The permittee shall submit a completed Permit Information Update Application Form to the
Division within 30 days to making any one of these changes.
12. TRANSFER. This permit is not transferable to any person or entity except after notice to and
approval by the Director. Neither the sale of the project and/or property, in whole or in part, nor
the conveyance of common area to a third party constitutes an approved transfer of the permit.
a. TRANSFER REQUEST. The transfer request must include the appropriate application,
documentation and the processing fee as outlined in 15A NCAC 02H.1045(2). This request
must be submitted within 90 days of the permit holder meeting one or more of the following:
i. A natural person who is deceased;
ii. A partnership, limited liability corporation, corporation, or any other business
association that has been dissolved,
in. A person or entity who has been lawfully and finally divested of title to the property
on which the permitted activity is occurring or will occur through foreclosure,
bankruptcy, or other legal proceeding.
iv. A person or entity who has sold the property, in whole or in part, on which the
permitted activity is occurring or will occur;
V. The assignment of declarant rights to another individual or entity;
vi. The sale or conveyance of the common areas to a Homeowner's or Property
Owner's Association, subject to the requirements of NCGS 143-214.7(c2),
b. TRANSFER INSPECTION. Prior to transfer of the permit, a file review and site inspection
will be conducted by Division personnel to ensure the permit conditions have been met and
that the project and the on -site stormwater system complies with the permit conditions.
Records of maintenance activities performed to date may be requested. Projects not in
compliance with the permit will not be transferred until all permit and/or general statute
conditions are met.
Page 4 of 5
13. COMPLIANCE. The permittee is responsible for complying with the terms and conditions of this
permit and the approved plans and specifications until the Division approves the transfer
request.
a. REVIEWING AND MONITORING FOR COMPLIANCE. The permittee is responsible for
verifying that the proposed BUA within each drainage area and for the entire project does
not exceed the maximum amount allowed by this permit. The permittee shall review and
routinely monitor the project to ensure continued compliance with the conditions of the
permit, the approved plans and specifications.
b. APPROVED PLANS AND SPECIFICATIONS. A copy of this permit, approved plans,
application, supplement, operation and maintenance agreement, all applicable recorded
documents, and specifications shall be maintained on file by the permittee at all times.
c. MAINTENANCE ACCESS. SCMs, stormwater collection systems, and vegetated
conveyances must be accessible for inspection, operation, maintenance and repair as
shown on the approved plans.
d. DIVISION ACCESS. The permittee grants Division Staff permission to enter the property
during normal business hours to inspect all components of the permitted project.
e. ENFORCEMENT. Any individual or entity found to be in noncompliance with the provisions
of a stormwater management permit or the requirements of the stormwater rules is subject to
enforcement procedures as set forth in NCGS 143 Article 21.
f. ANNUAL CERTIFICATION. The permittee shall electronically submit to the Division an
annual certification completed by either the permittee or their designee confirming the
projects conformance with permit conditions.
g. OBTAINING COMPLIANCE. The Director may notify the permittee when the permitted site
does not meet one or more of the minimum requirements of the permit. Within the time
frame specified in the notice, the permittee shall submit a written time schedule to the
Director for modifying the site to meet minimum requirements. The permittee shall provide
copies of modified plans and certification in writing to the Director that the changes have
been made.
h. OTHER PERMITS. The issuance of this permit does not preclude the permittee from
obtaining and complying with any and all other permits or approvals that are required for this
development to take place, as required by any statutes, rules, regulations, or ordinances,
which are imposed by any other Local, State or Federal government agency having
jurisdiction. Any activities undertaken at this site that cause a water quality violation or
undertaken prior to receipt of the necessary permits or approvals to do so are considered
violations of NCGS 143-215.1, and subject to enforcement procedures pursuant to NCGS
143-215.6.
Permit renewed, updated, and reissued this the 24th day of August 2022.
NORTH/CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION
j Brian Wrenn, Director
Division of Energy, Mineral and Land Resources
By Authority of the Environmental Management Commission
Permit Number SW8 970847
Page 5 of 5
Attachment C - Permitting History
Tactical Support Van Pad
Permit No. SW8 970847
Approval
permit Action
BIMS
Description of the Changes
Date
Version
Approved the construction of a wet detention pond
1/28/1998
Original
1.0
designed to handle the runoff from a total of 307,534
Approval
square feet built -upon area (BUA).
Approved the reallocation of 60,048 square feet of
3/20/2002
Plan Revision
1.0
future BUA for the construction of the P-512 Property
Control Facility.
Renewed the permit with a new expiration date of
3/7/2008
Renewal
2.0
March 7, 2018. This date was later extended until March
7, 2022.
Approved the modification of the property boundary to
remove a portion and include a portion of the area to
accommodate the P378 Hangar project. The total BUA
Major
approved to drain to the pond was increased to 314,299
12/ 16/2021
Modification
2.1
square feet, which the pond, as -built, was proved to be
able to handle. This modification also included the
addition of an area of redevelopment with 62,058 square
feet of BUA.
8/24/2022
Renewal
3.0
Expires March 7, 2022
Page 1 of 1
Permit Number: "("U (_708y yZ
(to be provided by DWQ)
Drainage Area Number:
Wet Detention Basin Operation and Maintenance Agreement
I will keep a maintenance record on this BMP. This maintenance record will be kept in a
log in a known set location. Any deficient BMP elements noted in the inspection will be
corrected, repaired or replaced immediately. These deficiencies can affect the integrity
of structures, safety of the public, and the removal efficiency of the BMP.
The wet detention basin system is defined as the wet detention basin,
pretreatment including forebays and the vegetated filter if one is provided.
This system (check one):
❑ does ® does not incorporate a vegetated filter at the outlet.
This system (check one):
❑ does ® does not incorporate pretreatment other than a forebay.
Important maintenance procedures:
— Immediately after the wet detention basin is established, the plants on the
vegetated shelf and perimeter of the basin should be watered twice weekly if
needed, until the plants become established (commonly six weeks).
— No portion of the wet detention pond should be fertilized after the first initial
fertilization that is required to establish the plants on the vegetated shelf.
— Stable groundcover should be maintained in the drainage area to reduce the
sediment load to the wet detention basin.
— If the basin must be drained for an emergency or to perform maintenance, the
flushing of sediment through the emergency drain should be minimized to the
maximum extent practical.
— Once a year, a dam safety expert should inspect the embankment.
After the wet detention pond is established, it should be inspected once a month and
within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a
Coastal County). Records of operation and maintenance should be kept in a known set
location and must be available upon request.
Inspection activities shall be performed as follows. Any problems that are found shall
be repaired immediately.
BMP element:
Potentialproblem:
How I will remediate theproblem:
The entire BMP
Trash/debris is present.
Remove the trash/debris.
The perimeter of the wet
Areas of bare soil and/or
Regrade the soil if necessary to
detention basin
erosive gullies have formed.
remove the gully, and then plant a
ground cover and water until it is
established. Provide lime and a
one-time fertilizer application.
Vegetation is too short or too
Maintain vegetation at a height of
long.
approximately six inches.
Form SW401-Wet Detention Basin O&M-Rev.4 Page 1 of 4
Permit Number:
(to be provided by DWQ)
Drainage Area Number:
BMP element:
Potentialproblem:
How I will remediate theproblem:
The inlet device: pipe or
The pipe is clogged.
Unclog the pipe. Dispose of the
swale
sediment off -site.
The pipe is cracked or
Replace the pipe.
otherwise damaged.
Erosion is occurring in the
Regrade the Swale if necessary to
swale.
smooth it over and provide erosion
control devices such as reinforced
turf matting or riprap to avoid
future problems with erosion.
The forebay
Sediment has accumulated to
Search for the source of the
a depth greater than the
sediment and remedy the problem if
original design depth for
possible. Remove the sediment and
sediment storage.
dispose of it in a location where it
will not cause impacts to streams or
the BMP.
Erosion has occurred.
Provide additional erosion
protection such as reinforced turf
matting or riprap if needed to
prevent future erosion problems.
Weeds are present.
Remove the weeds, preferably by
hand. If pesticide is used, wipe it on
the plants rather than spraying.
The vegetated shelf
Best professional practices
Prune according to best professional
show that pruning is needed
practices
to maintain optimal plant
health.
Plants are dead, diseased or
Determine the source of the
dying.
problem: soils, hydrology, disease,
etc. Remedy the problem and
replace plants. Provide a one-time
fertilizer application to establish the
ground cover if a soil test indicates
it is necessary.
Weeds are present.
Remove the weeds, preferably by
hand. If pesticide is used, wipe it on
the plants rather than spraying.
The main treatment area
Sediment has accumulated to
Search for the source of the
a depth greater than the
sediment and remedy the problem if
original design sediment
possible. Remove the sediment and
storage depth.
dispose of it in a location where it
will not cause impacts to streams or
the BMP.
Algal growth covers over
Consult a professional to remove
50% of the area.
and control the algal growth.
Cattails, phragmites or other
Remove the plants by wiping them
invasive plants cover 50% of
with pesticide (do not spray).
the basin surface.
Form SW401-Wet Detention Basin O&M-Rev.4 Page 2 of 4
Permit Number:
(to be provided by DWQ)
Drainage Area
BMP element:
Potentialproblem:
How I will remediate theproblem:
The embankment
Shrubs have started to grow
Remove shrubs immediately.
on the embankment.
Evidence of muskrat or
Use traps to remove muskrats and
beaver activity is present.
consult a professional to remove
beavers.
A tree has started to grow on
Consult a dam safety specialist to
the embankment.
remove the tree.
An annual inspection by an
Make all needed repairs.
appropriate professional
shows that the embankment
needs repair. if applicable)
The outlet device
Clogging has occurred.
Clean out the outlet device. Dispose
of the sediment off -site.
The outlet device is damaged
Repair or replace the outlet device.
The receiving water
Erosion or other signs of
Contact the local NC Division of
damage have occurred at the
Water Quality Regional Office, or
outlet.
the 401 Oversight Unit at 919-733-
1786.
The measuring device used to determine the sediment elevation shall be such
that it will give an accurate depth reading and not readily penetrate into
accumulated sediments.
When the permanent pool depth reads 4.0 feet in the main pond, the sediment
shall be removed.
When the permanent pool depth reads 1.0 feet in the forebay, the sediment
shall be removed.
Sediment Removal
Bottom
BASIN DIAGRAM
ill in the blanks)
Permanent Pool Elevation 16.4
15.4 Pe anen Pool
Volume Sediment Removal Elevation 12.4
14.4 ft Min. -------------------------- -------------
Sediment Bottom Elevation 11.4
Storage
FOREBAY
MAIN POND
1-ft
Storage
Form SW401-Wet Detention Basin O&M-Rev.4 Page 3 of 4
Permit Number:
(to be provided by DWQ)
I acknowledge and agree by my signature below that 1 am responsible for the
performance of the maintenance procedures listed above. 1 agree to notify DWQ of any
problems with the system or prior to any changes to the system or responsible party.
Project name:Tactical Support Van Pad
BMP drainage area number:I
Print name: -Cana PYe'ndRXQgsi
Title: Pw0 ci\m Enaivwbr
Address: Loos r kr_\-\ e\ "
Phone:gto-4s1 3i3e x3241
Signature: �'PVW..d ?4'f
Date: za A%a.t 'ui.t
Note: The legally responsible party should not be a homeowners association unless more than 50% of
the lots have been sold and a resident of the subdivision has been named the president.
1, �� 4 j . �� , a Notary Public for the State of
n, CUegR t„C�. County of bt\lS�bto do hereby certify that
personally appeared before me this
day of IDDk , and acknowledge the due execution of the
forgoing wet detention basin maintenance requirements. Witness my hand and official
seal,
E .. ...
�ission�,cc
PUBOO C a
SEAL
My commission expires
Form SW401-Wet Detention Basin O&M-Rev.4 Page 4 of 4
UEMLH USE ONLY
` Date Received Fee Paid Permit Number
r
8 11 D ) 202? tSnumt ZF &A)on 505= swx 01-1099-I
NC DEO Division of Energy, Mineral and Land Resources
STATE STORMWATER:
PERMIT RENEWAL APPLICATION FORM
In accordance with 1 SA NCAC 2H.1 Q4513V the current permit holder shall renew their high density permit 180 days
prior to its expiration. Renewed permits are valid for a period of 8 years per Session Law 2011-398 (SB 781)
Section 60.(c). This application form is for permit renewals only.
A. PROJECT INFORMATION
1. State Stormwater Permit Number: SWB 970847
2. Project name: Tactical Support Van Pad
3. Project street address: XXX
City: MCB Camp Leieune County: Onslow
ZIP: 28542
4. What, if any, changes have been made to the project as permitted?
If the project has changed from the original approved plans, please complete SWU-toI fora Major
Modification or Minor Modification Application form available at, htfps://deg.nc'aov/abouUdivisions/e
B. PERMITTEE INFORMATION
If changes to the permittee or project name have been made, please complete either, the Permit Update form
or the Permit Transfer form available at: httos://deo.nc.00v/about/divisions/energy-mineral-land-
resources/eneroy-mineral-land-rules/stormwater-oroprain/post-construction. State Stormrater Permits do not
automaticalty transfer with the sale of the property.
1 . Current Permit Holder's Company Name/Organization: MCB Camp Leieune
2. Signing Official's Name: Neal Paul
3. Signing Official's Thle: Deputy Public Works Division
4. Mailing Address: MCB Camp Leieune 1005 Michael Rd.
City: MCB Camp Leieune State: NC
ZIP : 28547-2521
5. Street Address:
City: State: ZIP:
6. Phone: (910) 451-2213 Email: neal.paul@usmc.mil
EcenI E
AUG 2 3 2,22
sv:!
Stormwater Permit Renewal Form Page 1 of 3 May 11. 2018
.,
C. SUBMITTAL REQUIREMENTS
Submit the application package to the appropriate DEMLR Regional Office (Coastal, SA Waters) or DEMLR
Central Office (Urbanizing Areas Ph 2, USMP, Non -Coastal HOW/ORW). Only applications packages that
include all required items listed below will be accepted and reviewed.
Initial each item below to indicate that the required information is provided in the application package:
MCT 1. A permit application processing fee of $505.00 payable to NCDEO.
MCT 2. One original signed hard copy and one electronic copy of this completed form. The signing official
named on this application to represent the current permittee must meet one of the following:
a. Corporation — a principle executive officer of at least the level of vice-president;
b. Limited Liability Company (LLC) — a manager or company official as those terms are defined
in G.S. 57D "North Carolina Limited Liability Company Act;"
c. Public Entity — a principal executive officer, ranking official, or other duly authorized employee;
d. Partnership or limited partnership — the general partner;
e. Sole proprietor; or
f. Letter of authorization signed by one of the signatories noted in a — e above authorizing the
signature of another entity.
MCT 3. One hard copy and one electronic copy of recorded documents required by the original permit that have
not yet been received by DEMLR, including: deed restrictions, protective covenants,
condominium/planned community declaration and easements. If the project has been built, include
documentation that the maximum BUA per lot or maximum total BUA has not been exceeded. If
the project has not been built, include a signed agreement that the final recorded deed restrictions
and protective covenants will be submitted at a later date.
MCT 4. O&M Agreements, Please select one:
®
I have a copy of the current recorded O&M Agreement for all SCMs, and I will continue to
keep this on file with the permit; or
❑
I do not have a copy of the current recorded O&M Agreement for all SCMs and am
requesting a copy be sent to me. I agree to keep this on file with the permit.
MCT 5. Designer
Certifications, Please select one:
®
A copy of the certification(s) confirming that the project was built in accordance with the
approved plans have been previously provided to the Division; or
❑
A copy of the certification(s) confirming that the project was built in accordance with the
approved plans are enclosed; or
❑
The project has not yet been built.
MCT 6. [IF APPLICABLE] If the project has been built, one original hard copy and one electronic copy of a
signed, sealed, and dated letter from a licensed professional stating that the SCMs have been
inspected, and that they have been built and maintained in accordance with the permit.
7. [IF APPLICABLE] When the permittee is a corporation or a limited liability corporation (LLC):
Provide one hard copy and one electronic copy of documentation from the NC Secretary of State,
or other official documentation, which supports the titles and positions held by the persons listed in
Section C.2 per 15A NCAC 2H. 1043(3)(b).
https://www.sosnc.gov/online services/search/by title/ Business Registration
--__
AUG 10 2022 1
er.•_
Stormwater Permit Renewal Application Form Page 2 of 3 May 11, 2018
D. P =TTEE'SLC/��ERTIFICATION
T ! / • Lz'-'�J44- the person legally responsible for the permit, certify that I have
a copy of the Permit and O&M Agreement on site (or I will obtain a copy and it will be kept on site), that I am
responsible for the performance of the maintenance procedures, and the site has been and will be maintained
according to the O&M Agreement and approved plans. I agree to notify DEMLR of any problems with the SCMs
or built -upon area and to submit the proper forms to modify or transfer the permit prior to any changes to the
project, SCMs, gyp rship. All tion provided on this permit renewal application is, to the best of my
knowledge, cor cfe t arAtimplete.. p
Signature: Date: o ZZ
NOTARIZATION: �r V�
I, ��� 1U�v`" a Notary Public for the State of
�=h County of bns�a�l , do hereby certify
that WbLI(% K L�� (�� personally appeared before me
this the day of 20, and acknowledge the due
execution of the forgoing instrument. Witness my hand and official seal,
(Notary Seal)
Notary Signature: 8.
My commission expires Wf • 26z5-
`�1luurrr�
N.VERs�y,
<4z NOTARY
1000y.• PUB1.�G :r2;
��.
i'OW CCv;````�
AUG 10 2022
Stormwater Permit Renewal Application Form Page 3 of 3 May 11, 2018
Permit No. ti
T'�Bi 7
(ro be prov— idby DWQq
O�OFj— W AT �q
724�G
P �/IIL.JyWCrv.
NCDENR
STORMWATER MANAGEMENT PERMIT APPLICATION FORM
401 CERTIFICATION APPLICATION FORM
WET DETENTION BASIN SUPPLEMENT
This form must be filled out, pnnted and submitted.
The Required Items Checklist (Pad 111) must be printed, filled out and submitted along with all of the required information.
Project name
Contact person
Phone number
Dale
Drainage area number
412-375-3081
8/2412021
1
HF 7 - Tactical Support Van Pad
Brandon Fombelle, PE
I1l.IDES IGN II N F,0 RMATION
Site Characteristics
Drainage area
535,230 113
Impervious area, post -development
314,299 ft'
% impervious
58.72 %
Design rainfall depth
1.0 8 1.5 in
Storage Volume: Non -SA Waters
Minimum volume required
25,986 ft3
Volume provided
33,209 ft3
OK, volume provided is equal to or in excess of volume required.
Storage Volume: SA Waters
1.5" runoff volume
ft3
Pre -development 1-yr, 24-hr mnoff
rya
Post -development 1-yr, 24-hr runoff
ft3
Minimum volume required
rya
Volume provided
ft3
Peak Flow Calculations
Is the prelpost control of the lyr 24hr storm peak flow required?
N (Y or N)
1-yr, 24-hr rainfall depth
NIA in
Rational C, pre -development
NIA (unitless)
Rational C, post -development
N/A limitless)
Rainfall intensity: 1-yr, 24-hr storm
NIA in/hr
#VALUE!
Pre -development 1-yr, 24-hr peak flow
NIA ft3lsec
Post -development 1-yr, 24-hr peak flow
NIA ft3lsec
Pre/Post 1-yr, 24-hr peak flow control
#VALUE! ft3lsec
Elevations
Temporary pool elevation
17.24 fmsl
Permanent pool elevation
16.40 fmsl
SHWT elevation (approx. at the perm. pool elevation)
nla fmsl
Top of 1Oft vegetated shelf elevation
16.40 fmsl
Bottom of 10ft vegetated shelf elevation
16.95 fmsl
Data not needed for calculation option #I, but OK if provided.
Sediment cleanout, top elevation (bottom of pond)
12.40 fmsl
Sediment cleanout, bottom elevation -
11.40 fmsl
Data not needed for calculation option #1, but OK if provided.
Sediment storage provided
1.00 It
Is there additional volume stored above the state -required temp. pool? N (Y or N)
Elevation of the top of the additional volume fmsl
Form SW401-Wet Detention Basin-Rev.9-411e/12 Pans I. S 11. Design Summary, Page 1 of 2
l
Permit No.
fto be provided by DWQI
11.E DESIG NI IN FORMATION
Surface Areas
Area, temporary pool
46,305 ftZ
Area REQUIRED, permanent pool
32,114 It'
SAIDA ratio
6,00 (unitless)
Area PROVIDED, permanent pool, A,,
37,410 ft' OK
Area, bottom of 10ft vegetated shelf, Awl ,,,f
40,770 ft'
Area, sediment cleanout, top elevation (bottom of pond), Awl wed
21,775 ft'
Volumes
Volume, temporary pool
Volume, permanent pool, Vp„m .i
Volume, forebay (sum of forebays if more than one forebay)
Forebay % of permanent pool volume
SAIDA Table Data
Design TSS removal
Coastal SAIDA Table Used?
Mountain/Piedmont SAIDA Table Used?
SAIDA ratio
Average depth (used in SAIDA table)
Calculation option 1 used? (See Figure 10-2b)
Volume, permanent pool, Vcem, pom
Area provided, permanent pool, Aperm-pce
Average depth calculated
Average depth used in SAIDA, d,,, (Round to nearest O.Sft)
Calculation option 2 used? (See Figure 10-2b)
Area provided, permanent pool, A,,_.
Area, bottom of 10ft vegetated shelf, A,B ,,
Area, sediment cleanout, top elevation (bottom of pond), A,I ,m
"Depth" (distance b/w bottom of 10ft shelf and top of sediment)
Average depth calculated
Average depth used in SAIDA, d,,, (Round to down to nearest 0.5ft)
Drawdown Calculations
Drawdown through orifice?
Diameter of odfice (if circular)
Area of orifice (if -non -circular)
Coefficient of discharge (Cg)
Driving head (H,)
Drawdown through weir?
Weir type
Coefficient of discharge (C.)
Length of weir (L)
Driving head (H)
Pre -development 1-yr, 24-hr peak Flow
Post development 1-yr, 24-hr peak flow
Storage volume discharge rate (through discharge orifice or weir)
Storage volume drawdown time
Additional Information
Vegetated side slopes
Vegetated shelf slope
Vegetated shelf width
Length of flowpath to width ratio
Length to width ratio
Trash rack for overflow & orifice?
Freeboard provided
Vegetated filter provided?
Recorded drainage easement provided?
Capures all runoff at ultimate build -out?
Drain mechanism for maintenance or emergencies is:
33,209 ft'
31,468 ft'
8,000 ft,
25.4°/ %
90 %
Y (Y or N)
N (Y or N)
6,00 (unitless)
Y (Y or N)
31,468 0
OK
Insufficient forebay volume.
37,410 k'
4.00 ft OK
4.0ft OK
N (Y or N)
37,410 ft'
40,770 ft'
21,775 ft'
4.55 It
4.00 ft
4.0 It
Y (Y or N)
3.00 in
in'
I (unitless)
042ft
NIA (Y or N)
NIA (unitless)
NIA (unitless)
NIA ft
NIA ft
NIA ft3/sec
NIA ft'/sec
0.15 ft3/sec
2.00 days
OK
OK
OK, draws down in 2-5 days.
4:1
OK
6 :1
Insufficient shelf slope.
3.3 ft
Insufficient shelf length.
4 :1
OK
4 :1
OK
Y (Y or N)
OK
3.7It
OK
N (Y or N)
OK
N (Y or N)
Insufficient. Recorded drainage easement required.
Y (Y or N)
OK
SHEAR GATE WI LIFT HANDLE
Form SW401-Wet Detention Basin-Rev.9-4118/12 Parts I. & 11. Design Summary, Page 2 of 2