Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW8961204_APPROVED PLANS_20131102
STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 120\-\ DOC TYPE ❑ CURRENT PERMIT N APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 2oY3\102 YYYYMMDD / n f I em I DESCFFTION I DATE I APPRov® I LOCATION MAP - U, S. MARINE CORPS BASE - CAMP LEJEUNE, N.C. SCALE : NONE �Sv�C�tSV�I� ILp415 DEC 0 21996 zac.�41;01L... 0 Olive Y 1• WO Trenton O:• GROV7 aawi Pink k Comfort Maysville Hill Richlands Magnolia, Veronj.f Rose ��k I/ I/ Dix �. •u• ► • �7 Hof f/ Ridge Burgaw Words Cornei y ° V /\ 9 � mpatead � Cott Hill r 10 0 10 �Acma Delco �/wlmi ton t�� MI— 676 Bolton Leland \ r VICINITY MAP - CAMP LEJEUNE, N.C. n DRAWING INDEX C-1 LOCATION MAP AND DRAWING INDEX C-2 EXISTING PROJECT LAYOUT AND DEMOLITION PLAN C-3 SITE PLAN C-4 PLAN AND PROFILES C-5 DETAIL SHEET C-6 DETENTION POND DETAILS AND SECTIONS S-1 LOADING AND UNLOADING PLATFORM PLAN, DETAILS, AND SECTIONS E-1 ELECTRICAL PLAN E-2 ELECTRICAL DETAILS j�EC-EIVE luu{ DEC 021996 D D q PROJ #`�W �l� Vy� 1 Z(��Y F•I MM, UPCHURC:H & A�OCIAIVA PA it I� CONSULTING ENGINEERS SOUTHERN PINES, NORTH CAROLINA 28387 C�l I MARINE CORPS BASE DES. AMM LOT 201 RENOVATIONS DR. FDW LOCATION MAP AND DRAWING INDEX AMM SUBMITTED BY: SUB �,r���H•CARp�''%, .•� ESS/pi• i9•"s DESIGN DIR. » PROJECT NO. h62470-96 B-4,U6 APPROVED: PWO OR OICC DATE SIZE CODE (DENT NO. NAVFAC DRAWING NO. 15662 . F 4336958 ICONSTR 2�,•'� ,'•�'�a�T•L�EUwP�'• SATISFACTORY TO DATE CONTR NO. N62470-96-8-4.3d6 7/1 j qG SCALE: NONE SPEC. 964386 SHEET 1 OF 9 r m U 0 0 C� EIP ELEV. 26.14 N 346789.0t E 2502744.1 CONSTRUCTION NOTES 1. INSTALL GRAVEL CONSTRUCTION ENTRANCE AND TEMPORARY SILT FENCE. 2. CLEAR AND GRUB AS SHOWN ON SHEET C--2. 3, CONSTRUCT DETENTION POND PRIOR TO COMMENCEMENT OF EARTHWORK TO CONTROL SEDIMENT. ST®RMWATER 4. COMPLETE GRADING AND PLACEMENT OF AGGREGATE BASE COURSE. D E C E I V E JUN 131997 D D PROd#�) jZC+ LEGEND INSTALL NEW CHAIN LINK FENCE W/GATES AS SHOWN (TYP.) EXISTING, DESCRIPTION NEW v ,r, TREE LINE ,Yr, �rYrr - YD - - 5' CONTOURS 32 I'CONTOURS - ---- - CHAIN LINK FENCEx-- ---J POWER POLE APPROVED X�= LIGHT POLE NORTHANAGEMENNTTEN K BENCH MARK OOMM DIVISION OF WATERGUALRIf 0 EXISTING IRON PIN Date 12L-C 1 A`'� 0" MONITORING WELL StormwaterPermNNo2Ua O DROP INLET ROAD = = zr rTT RAILROAD LINE SLIDING FENCE GATE �-- (MOTORIZED) REINFORCED CONCRETE ---------- PIPE AGGREGATE BASE COURSE SILT FENCE CONSTRUCTION ENTRANCE -°—SF SF— r Y1 ,y d—�Y A� REINF. CONCRETE F OTINGy--Y Y Y'v v *j A PLAN - DETENTION POND SPILLWAY ( SCALE: 3/4" = 1'-0" CONCRETE FILL 1" CROWN ELEVATION MARKER POLE 6" DIA. STANDARD WEIGHT GALVANIZED PIPE BOTTOM EL. 17.0 2'x2'x4' CONCRETE BASE NCDOT C:IA A PAINT SCHEDULE MARINE PAINT 1" BLACK STRIPE CIRCUMVENTING POLE DELINEATING ELEVATIONS (TYP.) 3" HIGH BLACK ELEVATIONS (TYP.) 6" RED STRIPE FROM EL 20.5 TO EL. 21.0 2 COATS — SAFETY YELLOW 2 MARKER POLE C6 C6 NOT TO SCALE ,-y EL. 23, J m w ro m m m D ry I— R.C.P. 21.45 0 NEW TRASH RACK-� 9„ N0. 4 REBAR (TYP)� 30" RISER PIPE 3 J TRASH RACK DETAIL C6 JC6 NOT TO SCALE —y-- v ,v," —,Y,--,v _l S PR'IEP, SEED AND MULCH (TYP.) L. 23.0 --� EXIST_ GRADE 3 3 r 1 NORMAL POOL 1 lI— 3 ELEV 22 0 75' a 7'-4' NOM. 8'-8" NOM. SECTION A -A J h LL: -)/'+ = I --V SCALE: 3/4 = 1'--0" FOOTING NOT SHOWN FOR CLARITY — ' ) _ " —%��J� J4'��.��` �_��..'��,-���� __,k.,�_. T,__.), --ti __~�A— ''— f l l EMERGENCY OVERFLOW STRUCTURE C3 C6 NOT TO SCALE 4 �3' �I (d 6, 3 � L. � 13 ) ( EL. 17.0 (� FO R E BAY � ) AREA UNDISTURBED SUBGRADE ( 5 DETENTION POND SECTION C3 C6 NOT TO SCALE 'J l 1 H �1 30" CMP R ^ FULLY BITUI COATED. B ELEV 22.0 DRILL 4 RO 10 1 /2" DI r FILL RISER CONC. FR01 TO INV. OF CONCRETE BASE IMBED RISER �y 12" INTO BASE 1 � f 6 RISER BARREL SECTION wh �� C3 C6 NOT TO SCALE µl EXIST. RCP ---, _,vw- — PREP, SEED AN DEL. 23.0 MULCH (TYP.) 3' EXIST GRADE _ 6 EL. 24.0 3 3 1 —11 1f EL. 22.0 EL. 17.0 FOREBAY 7 AREA UNDISTURBED 7 SUBGRADE 2 MARKER POLE 6 C6 280' NORMAL POOL ELEV. 22.0 FORM AND GRO TYP. SEAL OUTSIDE JOINT )CUT BLOCK AS NECESSARY _1 4 ) DETENTION POND SECTION 31061 NOT TO SCALE 1, THE OFFICER HARGE SHALL PERIODICALLY MEASURE SEDIME EPOSITION USING THE ELEVAI"1 MARKER POLE FOR VERTICAL CONTR.MEASUREMENTS WILL BE SCHEDULED S AT SEDIMENT DOES NOT E ELEVATION 21.0'. 2. WHEN SEDIMENT REACHES ELEVA 20.5', T OND WILL BE PUMPED DRY, SEDIMENTS EXCAVATED AND THE DET REA GRADED TO THE NEAT LINES OF DESIGN DRAWINGS. 3. THE OUTLET SYSTEM SHALL MAINTAINED FREE NG AND CLEAR OF DEBRIS AT ALL TIMES. UPON ATER, ALL. DEBRIS SHALL BE OVED FROM THE POND AND OUTLET, 4. ALL FUT DEVELOPMENT SHALL BE CONSISTENT WITH THESE DESIG ECIFICATIONS AND MODIFICATIONS TO THESE STORMWATER MANAGEMENT PLANS MUS ROVED BY THE: STATE OF NORTH CAROLINA_ 6'x6' MASONRY / C6 C6 EMERGENCY OVERFLOW STRUCTURE / I 3, I INV. EL. % L 23.60 -1 / -EL, 23.0 11 —EL=20 EL. 21.45 C o 1 EL. 17.0 INV EL. 21.30--- INV, EL. 21.20 —'---� \ FILL RISER W/2000 PSI CONC FROM FLOOR UP TO INV. OF 18" RCP - CATCH BASIN - C6 C5 77 EMERGENCY OVERFLOW STRUCTURE SECTION NOT TO SCALE -I 9 R.C.P. CONNECTION DETAIL. SCALE: 3/4" = V—O" 3' EMERGENCY OVERFLOW STRUCTURE GENERAL NOTES DESIGN SPECIFICATIONS: BUILDING CODE REQUIREMENTS FOR MASONRY STRUCTURES, ACI 530-92/ASCE 5-92/TMS 402-92, MASONRY STANDARDS JOINT COMMITTEE (AMERICAN CONCRETE INSTITUTE, AMERICAN SOCIETY OF CIVIL. ENGINEERS, AND THE MASONRY SOCIETY. AASHTO STANDARD SPECIFICATIONS FOR HIGHWAY BRIDGES, 1992 AND CURRENT INTERIM SPECIFICATIONS. FOUNDATIONS: FOUNDATIONS SHALL BE PLACED A MINIMUM OF ONE FOOT INTO VIRGIN SOIL OR COMPACTED FILL, OR AS DIRECTED BY THE ENGINEER. FOOTINGS ARE DESIGNED FOR A SOIL BEARING PRESSURE OF 2000 POUNDS PER SQUARE FOOT. BACKFILL: CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO BRACE WALLS WHEN BACKFILLING. CARE SHALL BE TAKEN DURING PLACEMENT OF BACKFILL ADJACENT TO THE WALL SO AS NOT TO OVERLOAD THE WALL DUE TO HEAVY EQUIPMENT, ONLY LIGHTWEIGHT COMPACTION EQUIPMENT (NOT EXCEEDING 3000 POUNDS) SHALL BE PERMITTED WITHIN THE CRITICAL_ ZONE DEFINED AS BEGINNING AT THE BASE OF THE WALL AND WIDENING UPWARD FROM THE BASE AT A 1:1 SLOPE. ALL PRECAUTIONS SHALL BE TAKEN TO PROVIDE ADEQUATE DRAINAGE PRIOR TO AND AFTER CONSTRUCTION. COMPACTION: FILL MATERIALS SHALL BE PLACED IN 8 INCH LOOSE: LIFTS AND COMPACTED TO AT LEAST 95% OF THE MAXIMUM STANDARD PROCTOR DRY DENSITY PER ASTM D-698. DESIGN LOADS (ASSUMPTIVE): FLUID PRESSURE = 63 PCF SURCHARGE = NONE COEFFICIENT OF FRICTION = 0,46 STRUCTURAL CONCRETE: DESIGN COMPRESSIVE STRESS AT 28 DAYS SHALL BE 3,000 PSI USING NORMAL WEIGHT AGGREGATE. PROVIDE 6% t 1 1 / 2% ENTRAINED AIR. CONCRETE MASONRY UNITS: PROVIDE A MINIMUM f'm OF 2000 PSI. GROUT ALL UNITS SOLID WITH 2O00 PSI GROUT CONFORMING TO ASTM C 476, USE TYPE M MORTAR ON ENTIRE PROJECT. REINFORCING: REINFORCING STEEL SHALL BE GRADE 60. WIRE TRUSS BARS FOR MASONRY SHALL BE HOT DIPPED GALVANIZED (1.50 OZ. PER SQUARE FOOT), CONFORMING TO ASTM A 82 WITH A MINIMUM YIELD STRENGTH OF 70,000 PSI. VERIFY ALL DIMENSIONS AND CONDITIONS RELATING TO EXISTING STRUCTURES AND COORDINATE WORK BETWEEN TRADES. SCALE OF FEET II LOCATION MAP - U. S. MARINE CORPS BASE - CAMP LEJEUNE. N.C. DRAWING LEGEND NAVFAC DRAWING # SHEET TITLE 60006859 T-1 CONCRETE PAVEMENT LOCATION & SITE MAPS 60006860 S-1 CONCRETE PAVEMENT SITE PLAN 60006861 S-2 CONCRETE PAVEMENT DETAILS Goldsboro \ 1 Olive Pink Hill Warsaw Magnolia Rosehill� Wallace Burgaw Words Corner Acme Delco Leland Bolton Dover Tuscarora Tre.a+on OAI ,," Com4ort Richlands "�q J Jacksonville Verona l� Dixon Folkstone f S/ ew Bern 'ROVE CHERRY POINT � 'ollacksville I Havelock Otwayl / Maysville kkk eaufortJ orehead City I I Hampstead �\ (�I Scott Hill vP Iton A, I � N P LEJUENE O G APPROVED 0c'5 14ORTH CAROLINA ENVIRONMENTAL. MANAGEMENT COMMISSION DIVISION OF WATER QUALITY 10 0 10 20 GRAPHIC SCALE IN MILES VICINITY MAP - CAMP LEJEUNE, N.C. y JUN 18 2012 i 4" if 0 CONTROL POINT #2 REBAR FOUND N - 346,063.5903 E - 2,502,642.6402 ELEV - 23.51 WEIGH STATION 7ONCRETESTEELTCONCRETE IN 340140.24 E 2502459.385 PROPOSED CONCRETE PAVEMENT N 346134.3311 E 2502399.6744 a 0 J N 4Z— EXISTING POND Nol 18" RCP r LEI LOCATION SURVEY - LOT 20 SCALE: 1 " = 40' EXISTING GRAVEL PARKING LOT EXISTING A HUT 40' 0 40' GRAPHIC SCALE IN FEET m 011 CONTROL POINT #1 REBAR FOUND f N - 4. 883 E - 502,165.6719 ELEV - 22.51 O W/ Till tl 11 lllllllllllllllllll GENERAL NOTES 1. DESIGN CRITERIA: UNITED FACILITIES CRITERIA 3-320-06A, CONCRETE FLOOR SLABS ON GRADE SUBJECTED TO HEAVY LOADS. 2. CONTRACTOR SHALL FIELD VERIFY LOCATIONS, DIMENSIONS, AND ELEVATIONS PRIOR TO ORDERING OR FABRICATING ANY MATERIALS. 3. CONTRACTOR SHALL PROVIDE EROSION CONTROL DURING ALL PHASES OF CONSTRUCTION CONFORMING TO APPLICABLE FEDERAL, STATE, AND LOCAL REGULATIONS. DESIGN AND DETAILS OF EROSION CONTROL MEASURES SHALL BE THE CONTRACTOR'S RESPONSIBILITY. 4. EXTREME CAUTION SHALL BE USED SO AS NOT TO DAMAGE THE EXISTING WEIGH SCALE. ANY DAMAGE CAUSED TO THE WEIGH SCALE SHALL BE REPAIRED AT NO COST TO THE GOVERNMENT. 5. NO VEHICULAR TRAFFIC SHALL BE ALLOWED ON THE EXISTING WEIGH SCALE DURING CONSTRUCTION. 6. PORTLAND CEMENT CONCRETE (PCC) PAVEMENT SHALL HAVE A MINIMUM FLEXURAL STRENGTH OF 650 PSI AT 28 DAYS. 7. ALL CONTRACTION JOINTS SHALL BE IN ACCORDANCE WITH THE CONTRACTION JOINT DETAILS. 8. EXPANSION JOINT MATERIAL SHALL CONFORM TO ASTM D1751. 9. LOW MODULUS SILICONE SEALANT AT CONTRACTION JOINTS SHALL CONFORM TO ASTM D5893. 10. SILICONE SEALANT AND BACKER ROD SHALL BE INSTALLED ACCORDING TO THE MANUFACTURER'S WRITTEN INSTRUCTIONS. 11. SAW CUT CONTRACTION JOINTS TO THE FULL DEPTH REQUIRED BY THE PLANS TO CONTROL RANDOM CRACKING AS SOON AS THE CONCRETE HAS HARDENED SUFFICIENTLY TO BE SAWED WITHOUT SPALLING AND RAVELING BUT NOT MORE THAN 24 HOURS AFTER THE CONCRETE IS PLACED. 12. CONSTRUCTION JOINTS MAY BE PLACED AS REQUIRED, EXCEPT THAT ALL CONSTRUCTION JOINTS SHALL COINCIDE WITH CONTRACTION JOINTS. 13. SURVEY INFORMATION PROVIDED BY JOYNER KEENY, PLLC, JUNE 26, 2009, 14. HORIZONTAL AND VERTICAL DATUMS WERE BASED ON COORDINATES FOR CONTROL POINTS #1 AND #2 AS SHOWN ON PLANS PREPARED BY HOBBS UPCHURCH & ASSOCIATES ENTITLED "LOT 201 RENOVATIONS", SHEET 2 OF 9, SIGNED 07-18-96. NC GRID NAD 83/2007 COORDINATES FOR CONTROL POINTS 1 N- 345,443.43 E-2,502,245.66 2 N- 346,133.32 E-2,502,721.43 15. THIS MAP WAS NOT PREPARED FOR RECORDATION AS PER GS 47-30 AS AMENDED. 16. NEWLY PLACED PAVEMENT SHALL NOT BE SUBJECTED TO THE DESIGN VEHICLE LOADING UNTIL THE PAVEMENT HAS ACHIEVED 100% OF THE SPECIFIED COMPRESSIVE STRENGTH. NEWLY PLACED PAVEMENT SHALL NOT BE SUBJECTED TO TRUCK LOADING UNTIL THE PAVEMENT HAS ACHIEVED 75% OF THE SPECIFIED COMPRESSIVE STRENGTH. 17. CONTRACTOR SHALL COORDINATE WITH THE GOVERNMENT AND SCHEDULE THE WORK TO KEEP LOT 201 OPEN TO TRAFFIC AT ALL TIMES. JUN 1 2012 x Bv: REVISIONS M IMAN f/�kv,I:IIIm 1=Lel.i�I: I:IIs] 4: 1 �-2 SCALE: 3/8" = 1'-0" 2' 1' 0 2' 4' GRAPHIC SCALE IN FEET NOTE: PAVEMENT DESIGN IS BASED ON INFORMATION PROVIDED AT LOT 201 SITE VISIT FEBRUARY 9, 2009. DESIGN CRITERIA IS 400,000 PASSES OF THE DESIGN VEHICLE LOCATED AT LOT 201 - PPM FC 55 TOP HANDLER "SUPER STACKER." TIRE PRESSURE IS 110 PSI. ALL WHEEL LOADS ARE IN KIPS. RESTORE PERIMETER AREAS TO ORIGINAL CONDITION 2'-0" MIN. '-10" PAVEMENT b D a _n" 1'--4" 6" AGGREGATE BASE COURSE (ABC) 1'-5" PAVEMENT 3 EDGE OF PCC PAVEMENT S-2 SCALE: Y2" = 1'-0" 2' 1' 0 2' 4' GRAPHIC SCALE IN FEET n C U EXISTING FENCE EXISTING WEIGH STATION 72'-0" f EXISTING WEIGH SCALE 3/4" EXPANSION JOINT L0 +00 10+50 11+00 11+50 1+60 1 I 1 ----' ----- -------------- ---- 1 --------------------------------- ---'- - -------------- ----- I - -- --------'----------- 1 -- - - , - ----------- -- - -- -- ---------- -- - Ld w o , 0 0 Q w 1 1 , O 1 U I O , , Q 3 1 � N� , c< _ O O ' O ' O O -------------------------------------------------------------------------------------------------------------------------------------------------------------- — Y4" DEEP SILICONE SEALANT W/ 1"0 BACKER ROD 3/4" EXPANSION JOINT MATERIAL EXISTING WEIGH SCALE EXISTING WEIGH SCALE CONCRETE FOOTING ©ff 20'-0" 5 CONTRACTION JOINTS 20'-0" S- 6 SPACES © 20'-0" = 120'-0" 1 60'-0" u -*SEE NOTE 1'-10" PAVEMENT b 0 PORTLAND CEMENT CONCRETE PAVEMENT PLAN OF PCC PAVEMENT 4' 2' 0 4' GRAPHIC SCALE IN FEET -5" PAVEMENT 0.57 GRADE_ 0 D b. 0 �— 6" AGGREGATE BASE COURSE 4 EXPANSION JOINT AT WEIGH SCALE S-2 SCALE: Y2" = 1'-O" 2' 1' 0 2' 4' iiiia GRAPHIC SCALE IN FEET *NOTE: AT THE EDGE OF THE WEIGH SCALE, THE ELEVATION OF THE SURFACE OF THE PROPOSED PORTLAND CEMENT CONCRETE PAVEMENT SHALL MATCH THE ELEVATION OF THE SURFACE OF THE EXISTING WEIGH SCALE CONCRETE FOOTING. FROM THIS ELEVATION, THE PCC PAVEMENT SHALL BE GRADED AS SHOWN. SCALE: 3/32" = 1 '-0" 51 1/2 w JIVIVV I I I Vu YYLL SPACED @ 1'-6" MAX. 5A DOWEL DETAILS S- SCALE: Y2" = 1'-0" 2' 1' 0 2' 4' iiiiiiiii GRAPHIC SCALE IN FEET - L- 0 � z o w N � W w w z � U o 3) O� o p I Q Z I U oN �o 0 z W O � w U 0 Ln I z 0 Of a_ I Y4" LOW MODULUS SILICONE SEALANT 1Y2" Y2" (±$„) MIN. Y4" MAX. BELOW PAVEMENT T 4 3/4" O BACKER ROD CLOSED CELL RESILIANT FOAM -SAW JOINT Y8" TO Y4" WIDE 5B SAW CUT AND SEALANT DETAILS S- SCALE: 2" = 1'-0" 0.5' 0.25' 0 0.5' 1' mommol GRAPHIC SCALE IN FEET CONTRACTION JOINT DETAILS JUN 18 2012 r }; y FINAL DRAWING NOT RELEASED FOR CONSTRUCTION AREA = 1 1 a17 ACRE GRAPHIC SCALE 40 20 0 40 80 1 INCH = 40 FT. LEGEND DRAINAGE AREA BOUNDARY BUILT UPON AREA BOUNDARY — — — 24 — — — CONTOURS FROM 2009 TOPO SURVEY CONTOURS FROM 2007 NCDOT LIDAR 24 -- PROPOSED CONTOURS FOR BANK MAINTENANCE FENCELINE RAILROAD NOTES: 1) EXISTING POND CONTOURS ARE FROM TOPOGRAPHIC SURVEY BY JOINER KEENEY, PLLC, DATE SEPTEMBER 29, 2009. HORIZONTAL AND VERTICAL DATUMS WERE BASED ON COORDINATES FOR CONTROL POINTS #1 AND #2 AS SHOWN ON PLANS PREPARED BY HOBBS UPCHURCH & ASSOCIATES ENTITLED "LOT 201 RENOVATIONS", SHEET 2 OF 9, SIGNED 07-18-96. 2) OTHER CONTOURS SHOWN ARE FROM NCDOT LiDAR DATA RELEASE: MAY 2007. 3) AERIAL PHOTOGRAPHY SHOWN WAS TAKEN IN 2007. + t r w WITH •own x h F 1 a a WOW rromv ...idr= SF UILDING sip '_ J •;i ••1 CONCRETE PAD K Y. _ - ^:r ( } SEE CONTRUCTION PLANS FOR s ELEVATIONS AND COORDINATES � � r n OD �t 1p '- $ - .. Almr 11 LOCATION MAP - U. S. MARINE CORPS BASE - CAMP LEJEUNE, N.C. SCALE : NONE Mt. Olive Magnolia \' Rosehiill Kinston Dover 70 ew Tuscarora Trenton OAK GROVE gs Pollacksville Pink Comfor t Maysville Richlands Hill 1 3eulaville /Fo eron ��1F,pCAMP Dixon ace lkstone I' �H/ofly Ridge Burgaw Words Corner V ampstead Scott Hill P 10 a to 20 Acme Delco Wilmington A� SCALE OF MILES 7° 8,75 Bolton Leland I Q. /! VICINITY MAP - CAMP LEJEUNE, N.C. DRAWING INDEX C-1 LOCATION MAP AND DRAWING INDEX C-2 EXISTING PROJECT LAYOUT AND DEMOLITION PLAN C-3 SITE PLAN C-4 PLAN AND PROFILES C-5 DETAIL SHEET C-6 DETENTION POND DETAILS AND SECTIONS S-1 LOADING AND UNLOADING PLATFORM PLAN, DETAILS, AND SECTIONS E-1 ELECTRICAL PLAN E-2 ELECTRICAL DETAILS JUN 18 2012 �Y: 7--/9-9G 1 1 c LEGEND EXISTING DESCRIPTION NEW m TREE LINE s5 5' CONTOURS 32 1' CONTOURS CHAIN LINK FENCE —0 POWER POLE LIGHT POLE 0 BENCH MARK O EXISTING IRON PIN ® MONITORING WELL ❑ DROP INLET ROAD RAILROAD LINE DEMOLITION AREA ASPHALT ROAD REINFORCED CONCRETE �• WETLANDS 11 GRAPHIC SCALE ( n1 FEET ) i inch = 100 ft, JUN 18 2012 r 4 7-i9-9G n Ln N 0 0 w 3 m m 0 w r 0 w W. EIP ELEV. 26.14 N 346789.0558 E 2502744.1495 C3 C EIP ELEV. 23.51 N 346063.5903 E 2502642.6402 TEMPORARY GRAVEL CONSTRUCTION ENTRANCE INSTALL NEW CHAIN LINK FENCE W/GATES AS SHOWN (TYP.) CONSTRUCTION NOTES 1. INSTALL GRAVEL CONSTRUCTION ENTRANCE AND TEMPORARY SILT FENCE. 2. CLEAR AND GRUB AS SHOWN ON SHEET C-2. 3. CONSTRUCT DETENTION POND PRIOR TO COMMENCEMENT OF EARTHWORK TO CONTROL SEDIMENT. 4. COMPLETE GRADING AND PLACEMENT OF AGGREGATE BASE COURSE. LEGEND EXISTING DESCRIPTION TREE LINE — —35— — 5' CONTOURS —32-- 1' CONTOURS CHAIN LINK FENCE -a POWER POLE LIGHT POLE BENCH MARK O EXISTING IRON PIN 0 MONITORING WELL O DROP INLET - _ = ROAD RAILROAD LINE SLIDING FENCE GATE (MOTORIZED) REINFORCED CONCRETE -------- PIPE AGGREGATE BASE COURSE SILT FENCE CONSTRUCTION ENTRANCE NEW D —SF SF— .JUN 18 2012 j+ by WE -7-19-9G No REVISIONS SYM. DESCRIPTION DATE APPROVED A&-HUILT DRAWING 1/7/00 4 TEMPORARY GRAVEL - PT STA 10+05.27 BEGIN CL STA 0+00 C4 C5 CONSTRUCTION ENTRANCE E 2502673 32 N 347065.09 E 2503623.14 r Q- """"` �� 1 STA 9+80.39 ACCESS ROAD -A Z INSTALL NEW CL STA. 5+00 -- STA 0+00 ACCESS ROAD-B \ I = 26'03'54' C4 C5 GRAVEL ROAD N �46921.80 R = 150.00' E 2�03149.55 STA 65+65.67 PINEY GREEN RD. oa T = 34.72' v op3 STA 0+00 ACCESS ROAD -A = L = 68.24' PC STA 0+38.59 a / / , Q c N 347068.79 co,E 2503584.73 \--- a° _ °+58.�6 32 --- \ 64+00 �� 65+00 , 31 / 66+00 - 67+00 68+00 � �pL / � 4+00 5+8+00� �� 2 j �0 26 00 �Oy.Op ` - _ PINEY GREEN ROAD ��/ _� o +0 z+oo 34 3+0/ __ - - � PT STA 1 +06.82 � ,� �- �I _ _ _ _-�-- - - -� qC ROAD A ort c0 .27 N 347059.92 -+ - - - \ _ `� s - --- �- E 2503517.67 °� �� - M ! N � � C346770151,67 NSTA 9+3 E 2502745.39 u o U STA 65+65.67 PINEY GREEN RD. a ssXs9'49/ ��P / EIP a h Q STA 0+00 ACCESS ROAD -A / HIGH POINT ELEV = 34.29 ELEV. / 26.14 o HIGH POINT STA = 1+81.30 0.558 R = 21*05'0 E 2502744 o PVI STA = 1 +88.22 END CL STA 10+65.21 Co T = 37.22 N 346757.96 x PVI ELEV = 34.82 / A.D. = 2.15 L = 73.60' E 2502613.39 K = 93.08 200.00' VC N N 40 40 35 35 0 - _ 30 30 - - ° - - 25 25 _ 0, K) (n -n en A 20 20 64+00 65+00 66+00 67+00 68+00 0+00 1 +00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00 10+00 1 1 +00 2B o N \ / 90L 15 RCP 4U .15% I / W/ F.E.S. BOTH ENZ S EIP E EV. 26.14 / PC STA 0+58.16 \ \ 2, LEGEND N 346789.0558 N 3'46�-0Q 96 �\ EXISTING DESCRIPTION NEW E 2502744.1495FI2502704.8-4-- WOOD LINE PSI Teo z8 / -�l N 346658.82 PC STA 3+51.1 1 / -35- - 5' CONTOURS 35 BEGIN CL STA 0+00 1 E 2502705.26 N 346409.24 / / I 32 - - 1 ' CONTOURS 32 N 346758.74 � 1 i E 2502698.15 / ) E 2502681.28 INSTALL NEW CHAIN LINK FENCE J 7+00 ` � = 03'45'37"6 C4 C5 GRAVEL ROAD I 0 00 � ` = 52 D-00' --4POWER POLE = I T -Y6.41' EIP LIGHT POLE o L = 32.81' PT STA 3+83.93 PC STA 5+73.58 ELEV. 23.51 I -� BENCH MARK + / ACCESS N 346376.70 ooN 346189.51 N 346063.5903 o �_ ` D 8 =` _ E 2502677.08 ^ E 2502646.60 E 2502642.6402 0 EXISTING IRON PIN o _+ � - / m MONITORING WELL ��Yn 4+0p �� ° = 23'48'26" \ O DROP INLET ti a R = 500' PRC�TA--7�1.34 N a \ r� �345983.47 ROAD 5+p0 T= 105.40 E 2502656.1 7 o` L = 207.76' / RAILROAD LINE 0 = 12'05142' / +0� o REINFORCED CONCRETE STA 9+80.39 ACCESS ROAD -A R = 200.00' / / 7+ PIPE (RCP) STA 0+00 ACCESS ROAD-B T = 21 19' a a \ \ END 4 L = 42.22' 26 I 1 " sx SECT OND (FES) % I = 83'55'59" CONSTRUCTION ENTRANCE T = 1 16.E 2' \ - a L = 190.44'\ HIGH POINT ELEV = 26.28 -__� c = _ _ - - GRAPHIC SCALE HIGH POINT STA = 1 +45.81 sa o z J P� PVI STA = 1+45.58 LOW POINT ELEV = 24.00 v 1 so 0o zoo PVI ELEV = 26.78 LOW POINT STA = 5+24.70 / 1 A.D. = 2.00 PVI STA = 4+24.70 END CL STA 9+71.77 (IN FEET ) K = 100.23 PVI ELEV = 24.00 N 345829.12 E 2502576.14 1 inch 5o ft. = 200.00' VC A.D. = 1.00 11 In 30 JUN 18 2012 HOBBS, UPCHURCH & ASSOCIATES, P.A. CONSULTING ENGINEERS r4j SOUTHERN PINES, NORTH CAROLINA 28387 C�4 DEPT OF NAVY NAVAL FACILITIES ENGINEERING COMMAND MARINE CORPS BASE CAMP LEJEUNE NORTH CAROLINA DES. AMM DR. FDW LOT 201 RENOVATIONS , CHK. AMM ,o. N �A.... ,, PROJECT PLAN AND PROFILES ?; '' ESS/p'•4-1 ., SUBMITTED BY: /9� . DESIGN DIR. ' �� PROJECT NO. N62470-96-8-4386 1 62 / APPRO%%%D: PWO OR OICC DATE SIZE CODE (DENT N0. NAVFAC DRAWING N0. S�'o `�ciNE�� off° Cs' .i:i�-'�"/ - �� F 4336961 SATISFACTORY TO DATE eFR? L Ep�1Pe CONSTR CONTR No. N62470-96-B-4386 ,,, I rr ,1, ,,.• SCALE: 1"=50' SPEC. 964386 SHEET 4 OF 9 to LLJ • 25 cf) - - - - ° - 20 15 ul N 0+00 1 +00 2+00 3+00 4+00 5+00 6+00 7-+.00 8+00 9+00 REVISIONS SYM. DESCRIPTION DATE APPROVED WET RETENTION BASIN REVISIONS 4/28/97 AS -BUILT DRAWING 1/7/00 EXTRA STRENGTH WOVEN GEOSYNTHETIC FILTER FABRIC WIRE FENCING AND REGULAR STRENGTH WOVEN GEOSYNTHETIC FILTER FABRIC �.vlwrr+uiw �uovnr,uu TYPICAL GRAVEL ROAD SECTION NOT TO SCALE TREATED 2" x 4" POSTS OR STEEL POSTS 8' O.C. WITH WIRE OR 6' O.C. WITHOUT WIRE rLow 11 k'�� n NOTE: REMOVE SEDIMENT DEEPER I THAN 127. REPAIR ANY UNDERMINING IMMEDIATELY. COMPACTED BACKFILL EXTEND FABRIC AND WIRE INTO TRENCH \ r3N� TEMPORARY SILT FENCE DETAIL UNDISTURBED SUBGRADE — NOT TO SCALE COMPACTED AGGREGATE BASE COURSE —COMPACTED SUBGRADE AGGREGATE BASE COURSE SECTION NOT TO SCALE REMOVE AND REPLACE EXISTING RAIL SECTIONS AND CROSS TIES AS NECESSARY C� 3:1 SLOPE (TYP.) EXISTING RAILROAD BALLAST AGGREGATE BASE COURSE COMPACTED TO 100% LABORATORY MAXIMUM 15' CARRIER PIPE SELECT BACKFILL COMPACTED TO 98% LABORATORY MAXIMUM r 5' MIN. 6 OPEN CUT & PATCH DETAIL C5 NOT TO SCALE C3 C5 NOT TO SCALE C4 PLAN All MMDC ACT / nKl/`DCTC /`/l\/CD \/AD MIN 2ND OPENING IF REO'D. SECTION Y-Y 5'-4' 4' PRECAST CONC. COVER SECTION X—X z i N 40'-3" (NOT TO FABRIC AREA OVERHANG (OMIT FABRIC) ,ND 1'-1" [330MM] 2" [50MM] 2" [50MM] POST TOP 2" [50MM] 4" [102MM] 0 ALUM UPRIGHT Q A) BARBED W RE, TYP. q UPRIGHT q q UPRIGHT STRANDS OF SQ ALUM SQ ALUM POSIT 1 8—#4 BARS EQ. SPACED —tt� SECTION V-V 4' —0" 3" 8—#4 BARS (5'-1"L) 3" EQUALLY SPACED o 0 0 0 0 0 SECTION W-W W ---- I 1 2" 12" 9 W 2—#4 BARS (2'-9" L) 9„ 5'-4" PLAN PLAN OF PRECAST COVER OR CAST IN PLACE CATCH BASIN SCALE: {NONE A KEEPER TRUSS ROD FRAME HT I2" L50MM] — 2" [50MM] TENSION TENSION ROD i X 4 [102MM] SQ ALUM ROD 12 1 1 1ALUM BOTTOM RAIL UPRIGHT CHAIN LINK FABRIC — CHAIN LINK FABRIC \ 4 [102MM] 0 POST GUIDE ROLLER ASS'Y AS REQUIRED _ GATE ELEVATION — (4) BAYS SHOWN 6' CHAIN LINK FENCE DETAIL WITH GATE 8" 1`6 PART SECTION 8" WALL 10 3/8' 1'-5 114 PART SECTION OF END ELEVATION 1" PIPE SLEEVE N NOT TO SCALE 8" WALL 8� 2'— 4!' 8,1 PLAN 6" Li P .• i. 1/4"' C C 2'-4" INLET PIPE M1 C7 12" 1 J ' D o D V) 0 0 00 I m d- It (n U o I __iA__ L 3" 12" ih C 7-#4 BARS (3'-5"L) SPACED 6" C. TO C. L] / , OUTLET PIPE 6" 3'-8 1 1 2 SECTION C—C OR D—D SECTION X-X 6" PRECAST COVER 1/4 " X 8" EXP. JOINT II MEN =1 6" SECTION Y-Y z I N // 7� JUNCTION BOX z I N C6 C5 SCALE: NONE GENERAL NOTES: ALL CATCH BASINS OVER 3'-6" IN DEPTH TO BE PROVIDED WITH STEPS 1'-2" ON CENTERS. STEPS SHALL BE IN ACCORDANCE WITH N.C.D.O.T. STD. 840.66. _ ALL EXPOSED CORNERS TO BE CHAMFERED 1". CLASS "B" CONCRETE TO USED THROUGHOUT. ALL MORTAR JOINTS ARE TO BE 1/2" t 1/8". ALL EXPOSED JOINTS WILL BE CONCAVE TOOLED. THE 6" OPENING SHOWN MAY BE INCREASED TO 8" MAX. IF DEEMED NECESSARY BY THE ENGINEER. FORMS ARE TO BE USED FOR THE CONSTRUCTION OF THE BOTTOM SLAB. JUMBO BRICK WILL BE PERMITTED. CONCRETE BRICK OR 4" SOLID CONCRETE BLOCKS MAY BE USED IN LIEU OF CLAY BRICK. IF REINFORCED CONCRETE PIPE IS SET IN BASE SLAB OF BOX, ADD TO BASE SHOWN ON N.C.D.O.T. STANDARD 840.00. FOR 8'-0" IN HEIGHT OR LESS USE 8" WALL. OVER 8'-0" IN HEIGHT USE 12" WALL TO 6'-0" FROM TOP OF WALL, AND 8" WALL FOR THE REMAINING 6'-0". QUANTITIES TO BE ADJUSTED ACCORDINGLY. 3/4" RAD. 3/4" DIA. SMOOTH BAR PART WHERE HANDLE IS LOCATED SHALL BE COUNTERSUNK 1" AND HANDLE SHALL co 2 — 3" X 1/4" THICK BE FREE TO MOVE VERTICALLY. L. ROUND OR SQUARE CUT WASHER ii I k j 2 — HEX NUT 1" PIPE SLEEVE X 3" LONG. DETAIL OF HANDLE PART SECTION THRU COVER SHOWING HANDLE . . . . T OUTLET ELEVATION TRUCK ASS'Y ALUM TRACK 2" [50MM] SQ ALUM UPRIGHT ALUM J TRACK/RAIL 2" [50MM] SQ ALUM STIFFENER — TRUSS ROD 2" [50MM] SQ ALUM UPRIGHT 3" [76MM] NON 2" [50MM X 4 [102MM ALUM RAIL SEC A (2 1/2"=1') WELDED JOINT GENERAL NOTES: ALL EXPOSED CORNERS TO BE CHAMFERED 1" CLASS "B" CONCRETE TO BE USED. MORTAR JOINTS 1 /2" t 1 /8" THICK. ALL EXPOSED JOINTS SHALL BE CONCAVE TOOLED. FORMS ARE TO BE USED FOR THE CON— STRUCTION OF THE BOTTOM SLAB. JUMBO BRICK WILL BE PERMITTED. CONCRETE BRICK OR 4' SOLID CONCRETE BLOCKS MAY BE USED IN LIEU OF CLAY BRICK. FOR 8'-0" IN HEIGHT OR LESS, USE 8" WALL. OVER 8'-0" IN HEIGHT, USE 12" WALL TO 6'—C FROM TOP OF WALL, AND 8" WALL FOR THE REMAINING 6'-0". DIMENSIONS AND QUANTITIES TO BE ADJUSTED ACCORDINGLY. ALL JUNCTION BOXES OVER 3'-6' IN DEPTH SHALL BE PROVIDED WITH STEPS 1'-2" ON CENTERS. STEPS SHALL BE IN ACCORDANCE WITH N.C.D.O.T. STD. NO. 840.66. PART WHERE HANDLE IS LOCATED SHALL BE COUNTERSUNK 1" AND HANDLE SHALL BE FREE TO MOVE UP AND DOWN. 1" PIPE 1 J SLEEVE 5" LONG PART SECTION 3/4" RADIUS 3/4" DIA. SMOOTH BAR 2 — 3" X 1 /4" THICK ROUND OR SQUARE CUT WASHER 2 — HEX NUT 6" DETAIL OF HANDLE .. CARpz�., ......... �9 :Q 15662 ' JUN182012 sF•......... L HOBBS, UPCHURCH & ASSOCIATES, P.A. CONSULTING ENGINEERS SOUTHERN PINES, NORTH CAROLINA 28387 C�5 DEPT OF NAVY NAVAL FACILITIES ENGINEERING COMMAND MARINE CORPS BASE CAMP LEJEUNE NORTH CAROLINA DES. AMM DR. FDW LOT 201 RENOVATIONS CHKAMM SUB DETAIL SHEET SUBMITTED BY: DESIGN DIR. PROJECT NO. N62470-96-B-4386 APPROVED: PWO OR OICC DATE SIZE CODE IDENT NO. NAVFAC DRAWING NO. F 4336962 SATISFACTORY TO DATE CONSTR CONTR NO. N62470-96-B-4386 SCALE: NONE SPEC. 964386 SHEET 5 OF 9 REINF. CONCRETE ba A PLAN - DETENTION POND SPILLWAY SCALE: 3/4" CONCRETE FIL 1" CROWN ELEVATION MARKER POLE Cr DIA. STANDARD WEIGHT GALVANIZED PIPE BOTTOM EL. 17A 2'x2'x4' CONCRETE BASE NCDOT CLASS A PAINT SCHEDULE - MARINE PAINT 1" BLACK STRIPE CIRCUMVENTING POLE DELINEATING ELEVATIONS (TYP.) 3" HIGH BLACK ELEVATIONS (TYP.) 6" RED STRIPE FROM EL. 20.5 TO EL. 21.0 2 COATS - SAFETY YELLOW 2 MARKER POLE C6 C6 NOT TO SCALE PREP, SEED AND MULCH (TYP.) EXIST. GRADE EL. 23.0 �3 3' FOREBAY AREA 30" CMP RISER -� FULLY BITUMINOUS COATED. BETWEEN ELEV 22.0 & 23.0 - DRILL 4 ROWS OF 10 1 /2" DIA. HOLES FILL RISER W/2000 PSI CONC. FROM FLOOR UP TO INV. OF 16' RCP- EL. 23.00 REF. R.C.P. CONNECTION DETAIL \-18" R.C.P. INV. EL. 21.45 B w > bo I NEW TRASH RACK 9„ NO. 4 REBAR (TYP.) -\ 30" RISER PIPE 4" CAP COURSE 0 GROUT ALL VOIDS, TYP. D !;I 6" HOOK 8" TYP. 3 TRASH RACK DETAIL C6 C6 NOT TO SCALE 3' 6' 75 6 1 NORMAL POOL 1 ELEV. 22.0 3 .0 1r UNDISTURBED SUBGRADE 5 DETENTION POND SECTION ,31061 NOT TO SCALE 2000 P.S.I. CONC. m #4 BAR 1' X 1' X 1' KEY CENTER IN SLAB #4 ® 1'-0", E.W. 1'-4" NOM., TYP. 8'-8" NOM 3" 7'-4" NOM. -' SECTION B-B SECTION A -A SCALE: 3/4" = 1'-0" SCALE: 3/4" = 1'-O" FOOTING NOT SHOWN FOR CLARITY CEMERGENCY OVERFLOW STRUCTURE C3 IC6 I NOT TO SCALE 3 6 OPEN CUT & PATCH C6 TRASH RACK C6 C5 EXISTING RAILROAD FI _ 74.O , 3' , `• - • -W_. W-110"o-orl INV. EL. 20.56 36 LF 18" RCP 00.18 -INV. EL. 20.56 7 INV. EL. 20.5 JUNCTION BOX `- 4'x4'x2' DEEP '%%L CONCRETE BASE IMBED RISER 12" INTO BASE /6RISER BARREL SECTION - EXIST. RCP EL. 24.0 PREP, SEED ANDEL. 23.0 MULCH (TYP.) , 3' , 6' FOREBAY AREA 1 1 UNDISTURBED SUBGRADE NORMAL POOL ELEV. 22.0 FORM AND GROUT, TYP. SEAL OUTSIDE JOINT - CUT BLOCK AS NECESSARY_ 2 MARKER POLE 6 C6 280' 4 l DETENTION POND SECTION AC61 NOT TO SCALE 1. THE OFFICER ARGE SHALL PERIODICALLY MEASURE SEDIME EPOSITION USING THE ELEVAT ARKER POLE FOR VERTICAL CONTR MEASUREMENTS WILL BE SCHEDULED S AT SEDIMENT DOES NOT E ELEVATION 21.0'. 2. WHEN SEDIMENT REACHES ELEVA 20.5', T ONDfWILLBE PUMPED DRY, SEDIMENTS EXCAVATED AND THE DET REA GRADED TO THE NEAT LINES OF DESIGN DRAWINGS. 3. THE OUTLET SYSTEM SHAL MAINTAINED FREE NG AND CLEAR OF DEBRIS AT ALL TIMES. UPON ATER, ALL DEBRIS SHALL BE OVED FROM THE POND AND OUTLET. 4. ALL FUT DEVELOPMENT SHALL BE CONSISTENT WITH THESE DESIG ECIFICATI( AND MODIFICATIONS TO THESE STORMWATER MANAGEMENT PLANS MU ROVED BY THE STATE OF NORTH CAROLINA. 6'x6' MASONRY EMERGENCY OVERFLOW C6 STRUCTURE L,3,1 INV. EL. 6' 6 1r� 3-- - EL. 23.0 1t -11 EL. 21.45 EL. 17.0 INV EL. 21.30 INV. EL. 21.20 FILL RISER W 2000 PSI CONC FROM FLOOR UP T INV. OF 18" RCP $ CATCH BASIN C6 C5 7 EMERGENCY OVERFLOW STRUCTURE SECTION kCAC61 NOT TO SCALE t 3' EMERGENCY OVERFLOW STRUCTURE GENERAL NOTES DESIGN SPECIFICATIONS: BUILDING CODE REQUIREMENTS FOR MASONRY STRUCTURES, ACI 530-92/ASCE 5-92/TMS 402-92, MASONRY STANDARDS JOINT COMMITTEE (AMERICAN CONCRETE INSTITUTE, AMERICAN SOCIETY OF CIVIL ENGINEERS, AND THE MASONRY SOCIETY. AASHTO STANDARD SPECIFICATIONS FOR HIGHWAY BRIDGES, 1992 AND CURRENT INTERIM SPECIFICATIONS. FOUNDATIONS: FOUNDATIONS SHALL BE PLACED A MINIMUM OF ONE FOOT INTO VIRGIN SOIL OR COMPACTED FILL, OR AS DIRECTED BY THE ENGINEER. FOOTINGS ARE DESIGNED FOR A SOIL BEARING PRESSURE OF 2000 POUNDS PER SQUARE FOOT. BACKFILL: CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO BRACE WALLS WHEN BACKFILLING. CARE SHALL BE TAKEN DURING PLACEMENT OF BACKFILL ADJACENT TO THE WALL SO AS NOT TO OVERLOAD THE WALL DUE TO HEAVY EQUIPMENT. ONLY LIGHTWEIGHT COMPACTION EQUIPMENT (NOT EXCEEDING 3000 POUNDS) SHALL BE PERMITTED WITHIN THE CRITICAL ZONE DEFINED AS BEGINNING AT THE BASE OF THE WALL AND WIDENING UPWARD FROM THE BASE AT A 1:1 SLOPE. ALL PRECAUTIONS SHALL BE TAKEN TO PROVIDE ADEQUATE DRAINAGE PRIOR TO AND AFTER CONSTRUCTION. COMPACTION: FILL MATERIALS SHALL BE PLACED IN 8 INCH LOOSE LIFTS AND COMPACTED TO AT LEAST 95% OF THE MAXIMUM STANDARD PROCTOR DRY DENSITY PER ASTM D-698. DESIGN LOADS (ASSUMPTIVE): FLUID PRESSURE = 63 PCF SURCHARGE = NONE COEFFICIENT OF FRICTION = 0.46 STRUCTURAL CONCRETE: DESIGN COMPRESSIVE STRESS AT 28 DAYS SHALL BE 3,000 PSI USING NORMAL WEIGHT AGGREGATE. PROVIDE 6% t 1 1 /2% ENTRAINED AIR. CONCRETE MASONRY UNITS: PROVIDE A MINIMUM f'm OF 2000 PSI. GROUT ALL UNITS SOLID WITH 2O00 PSI GROUT CONFORMING TO ASTM C 476. USE TYPE M MORTAR ON ENTIRE PROJECT. REINFORCING: REINFORCING STEEL SHALL BE GRADE 60. WIRE TRUSS BARS FOR MASONRY SHALL BE HOT DIPPED GALVANIZED (1.50 OZ. PER SQUARE FOOT), CONFORMING TO ASTM A 82 WITH A MINIMUM YIELD STRENGTH OF 70,000 PSI. VERIFY ALL DIMENSIONS AND CONDITIONS RELATING TO EXISTING STRUCTURES AND COORDINATE WORK BETWEEN TRADES. JUN 18 2012 C, 3106/ NOT TO SCALE n 1 Eve Tos e MARINE CORPS AIR STATION RACE COURSE AREA FM rove RIFLE 0 REVISIONS SYM CEM. i a ,r rc g I KNOX TARAWA TERRACE MIDWAY Tr. PARK II I a PARK 2 RoarOad MONTFOR Northeast CrQek US o, erA P 0 P❑IN,; HOSPITAL C, CONSTRUCT DLA SITE, LOT 201 N.C. Nun£ord w i R>, Pt, Paradise e9 Fvs rosrJe P2. ST7 \ m�°veeo / Store Boy 2 Holmes pt. RHODES \ � AREA RAG K2 �! \/ t. n. OAF r WATKINS q� VILLAGE T� AMPHIBIAN OPEN STORAGE AREA FRENCH CREEK AREA Fre Traps Boy O 150 LANDFILL COMBAT TOWN 82B 11,111k0iN11111M91l P P \J TRIANGLE OUTPOST H— O Z Ile (� Os �cnad.I�N BQ' oy p 6000 0 6000 12000 SCALE OF FEET LOCATION MAP - U. S. MARINE CORPS BASE CAMP LEJEUNE, NC Olive Hill Burgaw Tuscarora Trenton OAK C —7--q • I 'ollocksviile H, Maysville Ridge Words Corn �e Ci l nmpstead � Scot Hill P v Acne Delco Wilmington ,, 7 6 Leland I s'� Bolton \` Q VICINITY MAP - CAMP LEJEUNE, N.C. DISCLOSURE OF INFORMATION THE CONTRACTOR SHALL COMPLY AS FOLLOWS: A. THE CONTRACTOR SHALL NOT RELEASE TO ANYONE OUTSIDE THE CONTRACTOR'S ORGANIZATION ANY UNCLASSIFIED INFORMATION, REGARDLESS OF THE MEDIUM (E.G. FILM, TAPE, DOCUMENT), PERTAINING TO ANY PART OF THIS CONTRACT OR ANY PROGRAM RELATED TO THIS CONTRACT, UNLESS 1. THE CONTRACTING OFFICER HAS GIVEN PRIOR WRITTEN APPROVAL; OR 2. THE INFORMATION IS OTHERWISE IN THE PUBLIC DOMAIN BEFORE THE DATE OF RELEASE. B. REQUESTS FOR APPROVAL SHALL IDENTIFY THE SPECIFIC INFORMATION TO BE RELEASED, THE MEDIUM TO BE USED, AND THE PURPOSE FOR THE RELEASE. THE CONTRACTOR SHALL SUBMIT ITS REQUEST TO THE CONTRACTING OFFICER AT LEAST 45 DAYS BEFORE THE PROPOSED DATE OF RELEASE. C. THE CONTRACTOR AGREES TO INCLUDE A SIMILAR REQUIREMENT IN EACH SUBCONTRACT UNDER THIS CONTRACT. SUBCONTRACTORS SHALL SUBMIT REQUESTS FOR AUTHORIZATION TO RELEASE THROUGH THE PRIME CONTRACTOR TO THE CONTRACTING OFFICER. CIVIL LEGEND EXISTING DESCRIPTION NEW QD STORM DRAIN MANHOLE ❑ �S SANITARY SEWER MANHOLE ❑ TIDED TELEPHONE/COMMUNICATIONS PEDESTAL a UTILITY POLE LIGHT POLE AREA LIGHTS GUY WIRE THRUST BLOCK D4 WATER VALVE FIRE HYDRANT MW e GROUNDWATER MONITORING WELL o CO SANITARY SEWER CLEANOUT 0 SURVEY CONTROL POINT 0 DITCH/SWALE - - —D— — STORM SEWER D —W— — DOMESTIC WATER — S— — GRAVITY SEWER — —FM— — SEWER FORCE MAIN — —UGC— — UNDERGROUND COMMUNICATIONS — — OHE — — OVERHEAD ELECTRIC — — UGE — — UNDERGROUND ELECTRIC UGE s - - TOPOGRAPHIC CONTOUR 5 x U.00 SPOT ELEVATION + 5.00 SILT FENCE SILT ASPHALT PAVEMENT CONCRETE C GRAVEL TREE LINE TREE SIGN 0 ° FENCE - - SOURCE/DESTINATION UNKNOWN SOIL BORING DEMOLITION ITEMS X X CLEARING LIMITS -CL ABBREVIATIONS CL, C/L CENTER LINE CMP CORRUGATED METAL PIPE DIA DIAMETER DI DROP INLET ELEV ELEVATION E.W. EACH WAY ETC. ET CETERA H.P. HIGH POINT INV INVERT LBS POUNDS LF LINEAR FEET MAX MAXIMUM MIN MINIMUM NCDOT NORTH CAROLINA DEPARTMENT OF TRANSPORTATION O.C. ON CENTER 0. D. OUTSIDE DIAMETER RCP REINFORCED CONCRETE PIPE SF SQUARE FEET SPT SALT PRESSURE TREATED T.C. TOP OF CURB TYP TYPICAL WWF WELDED WIRE FABRIC & AND ± PLUS OR MINUS % PERCENT MARINE CORPS BASE CAMP LEJEUNE CONTRACT NO, N40085=13=Bm0137 INDEX OF DRAWINGS NAVFAC NO. SHEET NO. TITLE ---- CS COVER SHEET ---- C-1 SITE PLAN -EXISTING CONDITIONS ---- C-2 SITE LAYOUT AND GRADING PLAN ---- C-3 DETAILS ---- C-4 OIL/WATER SEPARATOR DETAILS ---- C-5 DETAILS 600 0 300 600 1200 GRAPHIC SCALE: 1" = 600E DATE (APPROVED "BY._-- - CS AVOLIS ENGINEERING, P.A. X 15564 NEWB RN, NC NEW BERN, NC 28561 PH.(252) 633-0068, FAX (252) 633 6507 DEPARTMENTOFTHENAVY NAVAL FACILRIES ENGINEERING COMMAND MARINE CORPS BASE CAMP LEJEUNE, NORTH CAROLINA DES. J. K. AVOLIS, P.E. CONSTRUCT DLA SITE, LOT 201 MARINE CORPS BASE CAMP LEJEUNE COVER SHEET DR. MSP I WFF . CA A�.,,� �pF SS/0,�; �% 15733 0 �INEva;;C:) i� pIKnAII��p, J D��I � � AE PRO ECT t 3057 J.C. P.E. BY: SUBMITTED BY: SUB DESIGN DIR. BRIAN R. MARSHBURN, P.E. APPROVED: PWO OR OICC DATE SIZE CODE (DENT. NO 80091 NAVFAC DRAWING NO. SATISFACTORY T0: DATE CONSTR. CONTR. NO. N40085 13$0137 SCALE: NOTED SPEC. 05-13-0137 SHEET 1 OF 6 GENERAL CONSTRUCTION NOTES: 1. THE LOCATION AND DEPTHS OF EXISTING UTILITIES SHOWN ARE APPROXIMATE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SCANNING THE AREA OF WORK TO IDENTIFY TO HIS OWN SATISFACTION THE EXTENT OF UTILITIES PRESENT INCLUDING THE UTILITIES INDICATED TO BE PRESENT, THOSE NOT SHOWN, AND THOSE SHOWN TO BE IN A DIFFERENT LOCATION. 2. PHYSICAL SITE FEATURES OUTSIDE THE AREA OF WORK OR THOSE FEATURES NOT RELEVANT TO THE WORK BEING PERFORMED ARE NOT SHOWN FOR CLARITY. 3. ALL DISTURBED GRASSED AREAS SHALL BE VEGETATED IN ACCORDANCE WITH THE PROJECT VEGETATION PLAN, SEE DETAIL E, SHEET -3. 4. GRADE EVENLY BETWEEN SPOT ELEVATIONS AND FINISH CONTOURS SHOWN. DEMOLITION WORK ITEMS: O EXISTING TEMPORARY TRAILER TO BE REMOVED BY GOVERNMENT. O O O O SEQUENCE OF OPERATION: 1. OBTAIN APPROVED EROSION AND SEDIMENTATION CONTROL PERMIT FROM THE NCDENR'S LAND QUALITY SECTION 2. REVIEW EROSION AND SEDIMENTATION CONTROL REQUIREMENTS AT PRECONSTRUCTION CONFERENCE. 3. INSTALL GRAVEL CONTROL ENTRANCE. 4. ERECT SILT FENCING. 5. CLEAR AND GRUB SITE. 6. EXCAVATE STORMWATER RETENTION POND AND STABILIZE. 7. CONSTRUCT PROJECT SWALES TO DISCHARGE TO STORMWATER RETENTION POND. 8. INSTALL CHECK DAMS. 9. ROUGH GRADE SITE. 10. INSTALL GRAVEL SURFACING. 11. FINISH GRADE AND VEGETATE SITE. 12. STABILIZE WITH SEED AND MULCH ALL AREAS NOT TO BE FURTHER DISTURBED BY CONSTRUCTION ACTIVITIES. 13. REMOVE ANY ACCUMULATED SEDIMENT FROM STORMWATER RETENTION POND. 14. ADDITIONAL MISCELLANEOUS EROSION AND SEDIMENTATION CONTROL MEASURES MAY BE REQUIRED WHEN DEEMED NECESSARY BY THE PROJECT ENGINEER, THE NCDENR'S LAND QUALITY SECTION OR THE CONTRACTING OFFICER. 15. REMOVE GRAVEL CONTROL ENTRANCE, SILT FENCING AND STONE CHECK DAMS AT COMPLETION OF CONSTRUCTION AND THE ESTABLISHMENT OF FINAL VEGETATION. MAINTENANCE PLAN 1. REMOVE SEDIMENT FROM BEHIND SILT FENCING AND CHECK DAMS WHEN IT ACCUMULATES TO SIX INCHES. 2. ALL AREAS SHALL BE FERTILIZED, SEEDED, RESEEDED AS NECESSARY, AND MULCHED ACCORDING TO SPECIFICATIONS IN THE VEGETATION PLAN IN ORDER TO ESTABLISH AND MAINTAIN A VIGOROUS, DENSE VEGETATIVE COVER. 3. ANY SEDIMENT TRACKED ONTO THE ADJACENT ASPHALT ROAD SHALL BE REMOVED ON A DAILY BASIS. 4. STORMWATER RETENTION POND SHALL BE USED AS A TEMPORARY SEDIMENT TRAP. UPON COMPLETION OF CONSTRUCTION, ALL SEDIMENT SHALL BE REMOVED FROM THE STORMWATER RETENTION POND TO RESTORE IT TO THE DESIGN DEPTHS. SPECIAL SEEDING NOTE: THE ANGLE FOR GRADED SLOPES AND FILL SHALL BE NO GREATER THAN THE ANGLE THA- CAN BE RETAINED BY VEGETATIVE COVER OR OTHER ADEQUATE GROUND COVER. GROUND STABILIZATION AND SEEDING SHALL BE PROVIDED WITHIN 7 CALENDAR DAYS OF COMPLETION OF ANY PHASE OF GRADING. ADDITIONALLY, WITHIN 15 WORKING DAYS OR 30 CALENDAR DAYS FROM THE COMPLETIOV OF THE PROJECT (WHICHEVER IS SHORTER), PERMANENT GROUND COVER SHALL BE ESTABLISHED. THE PROJECT NPDES CONSTRUCTION PERMIT REQUIRES THAT EROSION CONTROL DEVICES AND STORM WATER OUTFALLS BE INSPECTED WEEKLY AND WITHIN 24 HOURS OF A 1/2-INCH RAIN EVENT. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO CONDUCT THESE INSPECTIONS AND MAINTAIN RECORDS UNTIL THE AREA HAS STABILIZED, EVIDENT BY 95% VEGETATIVE GROWTH FOR AREAS RECEIVING SEEDING. TO FACILITATE RAINFALL MONITORING, A RAIN GAUGE IS REQUIRED TO BE ONSITE. ONCE STABILIZATION HAS BEEN ACCOMPLISHED, INSPECTION RECORDS ARE TO BE FORWARDED TO THE CONTRACTING OFFICER AND ALL TEMPORARY EROSION CONTROL MEASURES REMOVED. THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING COMPLIANCE WITH ALL PERMITS AND PLANS. ANY CHANGES MUST BE APPROVED BY THE STATE PRIOR. A COPY OF THE EROSION AND SEDIMENTATION CONTROL PLAN, LETTER OF APPROVAL AND NPDES CONSTRUCTION PERMIT MUST BE MAINTAINED BY THE CONTRACTOR AT THE PROJECT SITE. NOTE: ALL FILL MATERIAL NEEDED TO CONSTRUCT THIS PROJECT SHALL BE OBTAINED FROM THE FRENCH CREEK BORROW PIT OR FROM A PROPERLY PERMITTED COMMERCIAL BORROW PIT AT THE CONTRACTOR'S OWN EXPENSE. NOTE: SECTION 404 WETLANDS ARE NOT LOCATED WITHIN THE PROJECT LIMITS OF DISTURBANCE. 30 0 15 30 60 rRAPHIr CrAi F• t" DISCLOSURE OF INFORMATION THE CONTRACTOR SHALL COMPLY AS FOLLOWS: STORMWATER NOTE: IMPERVIOUS AREA INCREASE ASSOCIATED WITH NEW ASPHALT SURFACE = 10,316 SF A. THE CONTRACTOR SHALL NOT RELEASE TO ANYONE OUTSIDE THE CONTRACTOR'S ORGANIZATION ANY UNCLASSIFIED INFORMATION, REGARDLESS OF THE MEDIUM (E.G. FILM, TAPE, DOCUMENT), PERTAINING TO ANY PART OF THIS CONTRACT OR ANY PROGRAM RELATED TO THIS CONTRACT, UNLESS 1. THE CONTRACTING OFFICER HAS GIVEN PRIOR WRITTEN APPROVAL; OR 2. THE INFORMATION IS OTHERWISE IN THE PUBLIC DOMAIN BEFORE THE DATE OF RELEASE. B. REQUESTS FOR APPROVAL SHALL IDENTIFY THE SPECIFIC INFORMATION TO BE RELEASED, THE MEDIUM TO BE USED, AND THE PURPOSE FOR THE RELEASE. THE CONTRACTOR SHALL SUBMIT ITS REQUEST TO THE CONTRACTING OFFICER AT LEAST 45 DAYS BEFORE THE PROPOSED DATE OF RELEASE. C. THE CONTRACTOR AGREES TO INCLUDE A SIMILAR REQUIREMENT IN EACH SUBCONTRACT UNDER THIS CONTRACT. SUBCONTRACTORS SHALL SUBMIT REQUESTS FOR AUTHORIZATION TO RELEASE THROUGH THE PRIME CONTRACTOR TO THE CONTRACTING OFFICER. GENERAL CONSTRUCTION NOTES: 1. THE LOCATION AND DEPTHS OF EXISTING UTILITIES SHOWN ARE APPROXIMATE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SCANNING THE AREA OF WORK TO IDENTIFY TO HIS OWN SATISFACTION THE EXTENT OF UTILITIES PRESENT INCLUDING THE UTILITIES INDICATED TO BE PRESENT, THOSE NOT SHOWN, AND THOSE SHOWN TO BE IN A DIFFERENT LOCATION. 2. PHYSICAL SITE FEATURES OUTSIDE THE AREA OF WORK OR THOSE FEATURES NOT RELEVANT TO THE WORK BEING PERFORMED ARE NOT SHOWN FOR CLARITY. 3. ALL DISTURBED GRASSED AREAS SHALL BE VEGETATED IN ACCORDANCE WITH THE PROJECT VEGETATION PLAN, SEE DETAIL E. SHEET = 4. GRADE EVENLY BETWEEN SPOT ELEVATIONS AND FINISH CONTOURS SHOWN. NEW WORK ITEMS: tO NEW CONCRETE APRON, SEE DETAIL A, SHEET C-3. 20 NEW GRAVEL SURFACING, SEE DETAIL B, SHEET C-3. 30 RECONSTRUCT MONITORING WELL COVER TO BE FLUSH WITH NEW SURFACE, SEE DETAIL C, SHEET C-3. 9OINSTALL GRAVEL CONTROL ENTRANCE, SEE DETAIL A, SHEET C-5. 10 INSTALL SILT FENCING, SEE DETAIL B, SHEET C-5. 11 INSTALL CHECK DAM, SEE DETAIL C, SHEET C-5. SEQUENCE OF OPERATION: 1. OBTAIN APPROVED EROSION AND SEDIMENTATION CONTROL PERMIT FROM THE NCDENR'S LAND QUALITY SECTION 2. REVIEW EROSION AND SEDIMENTATION CONTROL REQUIREMENTS AT PRECONSTRUCTION CONFERENCE. 3. INSTALL GRAVEL CONTROL ENTRANCE. 4. ERECT SILT FENCING. 5. INSTALL CHECK DAM. 6. ROUGH GRADE SITE. 7. INSTALL GRAVEL SURFACING. 8. CONSTRUCT CONCRETE APRON AND OTHER SITE IMPROVEMENTS. 9. STABILIZE WITH SEED AND MULCH ALL AREAS NOT TO BE FURTHER DISTURBED BY CONSTRUCTION ACTIVITIES. 10. ADDITIONAL MISCELLANEOUS EROSION AND SEDIMENTATION CONTROL MEASURES MAY BE REQUIRED WHEN DEEMED NECESSARY BY THE PROJECT ENGINEER, THE NCDENR'S LAND QUALITY SECTION OR THE CONTRACTING OFFICER. 11. REMOVE GRAVEL CONTROL ENTRANCE, SILT FENCING AND STONE CHECK DAMS AT COMPLETION OF CONSTRUCTION AND THE ESTABLISHMENT OF FINAL VEGETATION. MAINTENANCE PLAN 1. REMOVE SEDIMENT FROM BEHIND SILT FENCING AND CHECK DAMS WHEN IT ACCUMULATES TO SIX INCHES. 2. ALL AREAS SHALL BE FERTILIZED, SEEDED, RESEEDED AS NECESSARY, AND MULCHED ACCORDING TO SPECIFICATIONS IN THE VEGETATION PLAN IN ORDER TO ESTABLISH AND MAINTAIN A VIGOROUS, DENSE VEGETATIVE COVER. 3. ANY SEDIMENT TRACKED ONTO THE ADJACENT ASPHALT ROAD SHALL BE REMOVED ON A DAILY BASIS. SPECIAL SEEDING NOTE: THE ANGLE FOR GRADED SLOPES AND FILL SHALL BE NO GREATER THAN THE ANGLE THAT CAN BE RETAINED BY VEGETATIVE COVER OR OTHER ADEQUATE GROUND COVER. GROUND STABILIZATION AND SEEDING SHALL BE PROVIDED WITHIN 7 CALENDAR DAYS OF COMPLETION OF ANY PHASE OF GRADING. ADDITIONALLY, WITHIN 15 WORKING DAYS OR 30 CALENDAR DAYS FROM THE COMPLETION OF THE PROJECT (WHICHEVER IS SHORTER), PERMANENT GROUND COVER SHALL BE ESTABLISHED. STORMWATER NOTE: IMPERVIOUS AREA INCREASE ASSOCIATED WITH NEW CONCRETE SURFACE = NONE NOTE: ALL FILL MATERIAL NEEDED TO CONSTRUCT THIS PROJECT SHALL BE OBTAINED FROM THE FRENCH CREEK BORROW PIT OR FROM A PROPERLY PERMITTED COMMERCIAL BORROW PIT AT THE CONTRACTOR'S OWN EXPENSE. NOTE: SECTION 404 WETLANDS ARE NOT LOCATED WITHIN THE PROJECT LIMITS OF DISTURBANCE. 30 0 15 30 60 MAPNIr CrAI P 7" DISCLOSURE OF INFORMATION THE CONTRACTOR SHALL COMPLY AS FOLLOWS: A. THE CONTRACTOR SHALL NOT RELEASE TO ANYONE OUTSIDE THE CONTRACTOR'S ORGANIZATION ANY UNCLASSIFIED INFORMATION, REGARDLESS OF THE MEDIUM (E.G. FILM, TAPE, DOCUMENT), PERTAINING TO ANY PART OF THIS CONTRACT OR ANY PROGRAM RELATED TO THIS CONTRACT, UNLESS 1. THE CONTRACTING OFFICER HAS GIVEN PRIOR WRITTEN APPROVAL; OR 2. THE INFORMATION IS OTHERWISE IN THE PUBLIC DOMAIN BEFORE THE DATE OF RELEASE. B. REQUESTS FOR APPROVAL SHALL IDENTIFY THE SPECIFIC INFORMATION TO BE RELEASED, THE MEDIUM TO BE USED, AND THE PURPOSE FOR THE RELEASE. THE CONTRACTOR SHALL SUBMIT ITS REQUEST TO THE CONTRACTING OFFICER AT LEAST 45 DAYS BEFORE THE PROPOSED DATE OF RELEASE. C. THE CONTRACTOR AGREES TO INCLUDE A SIMILAR REQUIREMENT IN EACH SUBCONTRACT UNDER THIS CONTRACT. SUBCONTRACTORS SHALL SUBMIT REQUESTS FOR AUTHORIZATION TO RELEASE THROUGH THE PRIME CONTRACTOR TO THE CONTRACTING OFFICER. REVISIONS SYM DATE (APPROVED d d a° ` ° ° d W - °b.. U °da da ° a Gn nd ° d°a ° ° e. ° ` d °d 8 d CJ CJ° CJ' CJ CJ, CJ°d CJ ° CJ° CJ CJ CJ CJ, CJ° ° d d ° ° a ad °� a a—j a ° LJ° ° U °. °.`U a d U G d G e 4 41`G. ° ° G CJ CiCJg ° CJa CJ °CJ CJ CJ° Cal ICJ ° d CJa CJa CJ d ° d° a° d ° °° a d ° d a e° d e ° ° B U @ a U C, U° L d G W ° a d d ° d de a d 44 C-3 C-3 CJa d CJ CJ, CJ d° CJ C°'° CJ CJ, CJa d ° ICJ CJ CJ CJ G ° ° ° ° d.° �d d L ad a B $ G L�j 4 G° d ` ° ° < ` ` ° as o ° m ° CJG ` 'LJ CJ' da CJ d ° 'C �.'�, CJ ° i ed CJ. -CJ eCJ ° CJ CJ 8 CJ - CJ G° _ $ ° a ° _ G d ° ° d a ° C d° a d°d a dCJCJ d J G CJ iJ Cc CJ CJ CJ' d8 ° 4 d U U °d U W. q G°. CJa CJ a ° CJ a CJ d aCJ CJ CJ nL aCJa. ci , ° CJ' °G. aCJ °CJ ° CJ d d aa' d- ° a d ° d Ue ° ClJi c G ° dda d eGe° E� ) J JEJ LJ EJ d d. d a - a UL-1 3i4 d ° 0 NTABLE`CURB "dG "CURB G C° CJCJ J CJ C CJ CJCJ CJ .4 d. r 4 41�aG e j4- 4 CJ 4 4 P 4 L J d C-3 C-3 C-3 C`-3 °d CJ d°a \. ° d aCJ.° d°ah.J Cbl ° a CJ d ° CJGd a CJ ° C'J °CJ +C' J\.Jda au a a e°° 9 o 441 d U U flJ - a- W U q� °U e a U U d d d a d a e 6 CURB 1 T 4 d ° d ° - B d \ cM p U m I U U U CJ = CONTRACTION JOINT, SEE DETAIL F, SHEET C-3 EJ = EXPANSION JOINT, SEE DETAIL F, SHEET C-3 A PLAN VIEW —CONCRETE APRON C-2 C-3 SCALE 1"=20' #5 @ 12" O.C. EACH WAY t. 21 1 NEW ABC STONE BASE THICKNESS VARIES B SECTION @ EDGE C2 C-3 SCALE 1"=1' 3/4" CHAMFER EACH SIDE TOP OF SLAB ELEVATION (T.S.)= SEE PLAN (2) #5 CONTINUOUS 6° 3/4" CHAMFER EACH SIDE TOP OF CURB ELEVATION (T.C.)= SEE PLAN #5 @ 12" O.C. N w #5 @ 12" O.C. EACH SAY > TOP OF SLAB ELEVATION (T.S.)= SEE PLAN D ° 2L • 11 NEW ABC STONE BASE -- THICKNESS VARIES C SECTION @ EDGE C-3 C-3 SCALE 1"=1' 2' 7' WEL 2" NEW Aug JIVINL unI l- THICKNESS VARIES p SECTION @ EDGE C-3 C-3 SCALE 1"=1' TOP OF ROLL CURB ELEVATION =SEE PLAN I#5 @ 12 ° D 2 1 NEW ABC STONE BASE THICKNESS VARIES E SECTION @ ROLL CURB C-3 C-3 SCALE 1"=1' 31 /8" I 1 /4" SAW CUT TOP OF SLAB PETROLEUM RESISlA4T a JOINT SEALANT N CENTERLINE SWALE 3/8"—T- 2- �1/2" DIAMETER BACKER ROD SAW CUT TYPICAL CONTRACTION JOINT (CJ) F SLAB —ON —GRADE JOINTS C-3 C-3 NOT TO SCALE TOP OF SLOPE 4' 3/8" PETROLEUM RESISTANT — JOINT SEALANT #3 x 181 @ PIPE #5 @ 1 " CONTINUOUS #5 @ 12" O.C. EACH WAY ° cD R TOP OF SLAB PREFORMED JOINT FILLER 1/2" SMOOTH DOWEL X 2'-6" LONG @ 2' O.C. WRAP OR GREASE ONE END TYPICAL EXPANSION JOINT (EJ) G GRAVEL SURFACING C-2 C-3 NOT TO SCALE DISCLOSURE OF INFORMATION THE CONTRACTOR SHALL COMPLY AS FOLLOWS: A. THE CONTRACTOR SHALL NOT RELEASE TO ANYONE OUTSIDE THE CONTRACTOR'S ORGANIZATION ANY UNCLASSIFIED INFORMATION, REGARDLESS OF THE MEDIUM (E.G. FILM, TAPE, DOCUMENT), PERTAINING TO ANY PART OF THIS CONTRACT OR ANY PROGRAM RELATED TO THIS CONTRACT, UNLESS 1. THE CONTRACTING OFFICER HAS GIVEN PRIOR WRITTEN APPROVAL; OR 2. THE INFORMATION IS OTHERWISE IN THE PUBLIC DOMAIN BEFORE THE DATE OF RELEASE. B. REQUESTS FOR APPROVAL SHALL IDENTIFY THE SPECIFIC INFORMATION TO BE RELEASED, THE MEDIUM TO BE USED, AND THE PURPOSE FOR THE RELEASE. THE CONTRACTOR SHALL SUBMIT ITS REQUEST TO THE CONTRACTING OFFICER AT LEAST 45 DAYS BEFORE THE PROPOSED DATE OF RELEASE. C. THE CONTRACTOR AGREES TO INCLUDE A SIMILAR REQUIREMENT IN EACH SUBCONTRACT UNDER THIS CONTRACT. SUBCONTRACTORS SHALL SUBMIT REQUESTS FOR AUTHORIZATION TO RELEASE THROUGH THE PRIME CONTRACTOR TO THE CONTRACTING OFFICER. OCT 2 9 2013 C=3 AVOLIS ENGINEERING, P.A. DEPARTMENT OFTHE NAVY NAVAL FACILITIES ENGINEERING COMMAND P.O. BOX NEW BERN, MARINE CORPS BASE NNC 28561 C PH.(252) 633-0068, FAX (252) 633-6507 CAMP LEJEUNE, NORTH CAROLINA DES. J. K. AVOLIS, P.E. DR. MSPIWFF CONSTRUCT DLA SITE, v CHK. J. C. AVOLIS, P.E. LOT 201 MARINE CORPS BASE CAMP LEJEUNE SUBMITTED BY: DESIGN DIR. BRIAN R. MARSHBURN, P.E. DETAILS 5i APPROVED: PWO OR OICC DATE SIZE CODE (DENT. NO NAVFAC DRAWING N0. 00091 SATISFACTORY TO: DATE I CONSTR. CONTR. NO. N40085-13-B-0137 AE PROJECT # 13057 SCALE: NOTED SPEC. 05-13-0137 SHEET 4 OF 6 f 1 .. .. .. .. .., .li .. I I 0u0 0000 00000 0000 00000 0 0000000 00000 1 0000o - _0-0-0-0 EDGE OF EXISTING — ROADWAY PAVEMENT 6" LAYER OF COARSE AGGREGATE (2"-3") OVER 12" LAYER OF STONE BASE COURSE MAINTENANCE 1. MAINTAIN ENTRANCE CONDITION. THIS MAY REQUIRE REPLACEMENT OF STONE. 0 C GRAVEL CONTROL ENTRANCE C-2 C-6 NOT TO SCALE SELF -ANCHORING METAL POST ® 6' O.C. MAX 12 GAUGE 6"x6" WIRE MESH FILTER FABRIC TEMPORARY VEGETATIVE SEEDING (PRIOR TO ESTABLISHING PERMANENT VEGETATION AFTER COMPLETION OF GRADING ACTIVITIES AND THE CONSTRUCTION OF SWALES, ALL EXPOSED AREAS SHALL BE SEEDED TO THE FOLLOWING SPECIFICATIONS: SEED BED LIME 1-1/2 TON PER ACRE FERTILIZER 1/2-TON PER ACRE SEED RYE GRAIN 50 LBS PER ACRE TALL FESCUE 100 LBS PER ACRE SUPPLEMENTAL SEED MAY THROUGH AUGUST: CENTIPEDE 5 LBS PER ACRE PROCEDURE STRAW MULCH SHALL BE APPLIED AT A RATE WHICH WILL INSURE APPROXIMATELY 75% COVERAGE OF THE SEEDED AREA, THE STRAW AND SOWN SEED WILL BE LIGHTLY DISCED INTO THE BED TO GIVE IT FURTHER RESISTANCE TO BLOWING AND WASHING. THE CONTRACTOR SHALL GUARANTEE A FULL STAND OF GRASS OVER THE ENTIRE DISTURBED AREA. IF NECESSARY THE CONTRACTOR WILL WET DOWN THE AREAS TO ASSIST IN SEED GERMINATION OR AID IN GROWTH IN TIMES OF EXCESSIVELY DRY WEATHER. A STAND OF GRASS WILL BE CONSIDERED ACCEPTABLE WHEN THE ENTIRE STAND OF GRASS IS AT LEAST FOUR INCHES HIGH AND HAS ACHIEVED AT LEAST 95% COVERAGE OF DISTURBED AREAS. RESEEDING WILL BE REQUIRED AS NECESSARY BY THE CONTRACTOR TO OBTAIN THE SPECIFIED STAND OF GRASS. PERMANENT VEGETATION ALL DISTURBED AREAS NOT COVERED WITH BUILDINGS, PAVEMENTS, OR OTHER IMPERMEABLE SURFACES SHALL BE SODDED WITH CENTIPEDE SOD AS THE FINAL/ PERMANENT VEGETATION. SPECIAL SEEDING NOTE: CUT & FILL SLOPES WILL, WITHIN 7 CALENDAR DAYS DAYS OF COMPLETION OF ANY PHASE OF GRADING, BE PLANTED AND PROVIDED WITH TEMPORARY OR PERMANENT GROUND COVER, DEVICES, OR STRUCTURES SUFFICIENT TO RESTRAIN EROSION. r8" BURY + � FLOW G VEGETATION PLAN NOT TO SCALE MAINTENANCE 1. INSPECT STRUCTURES WEEKLY AND AFTER AT LEAST A 1 /2" OR GREATER RAINFALL EVENT. 2. REMOVE SEDIMENT FROM BEHIND SILT FENCE PRIOR TO IT REACHING A MAXIMUM DEPTH OF SIX (6) INCHES. D SILT FENCE C-2 c-s NOT TO SCALE 12° THICK NCDOT #57 WASHED STONE ON UPSTREAM SIDE O0O n- O CLASS A NON -WOVEN GEOTEXTILE FABRIC 12" THICK NCDOT #57 STONE ON UPSTREAM SIDE 3 FILTER CLOTH 1.5' CLASS B //,-RIPRAP MAINTENANCE 1. CONSTRUCT CHECK DAM OF RIP RAP STONE PLACED IN ACCORDANCE WITH DETAIL. 2. SEDIMENT BEHIND THE CHECK DAM SHALL BE REMOVED PRIOR TO THE LEVEL REACHING WITHIN 6" OF THE CENTERLINE CREST OF THE DAM. 3. SHOULD SCOUR DEVELOP AT THE DOWNSTREAM END, IT SHALL BE REPAIRED IMMEDIATELY. F CHECK DAM C-2 C-6 NOT TO SCALE DISCLOSURE OF INFORMATION THE CONTRACTOR SHALL COMPLY AS FOLLOWS: A. THE CONTRACTOR SHALL NOT RELEASE TO ANYONE OUTSIDE THE CONTRACTOR'S ORGANIZATION ANY UNCLASSIFIED INFORMATION, REGARDLESS OF THE MEDIUM (E.G. FILM, TAPE, DOCUMENT), PERTAINING TO ANY PART OF THIS CONTRACT OR ANY PROGRAM RELATED TO THIS CONTRACT, UNLESS 1. THE CONTRACTING OFFICER HAS GIVEN PRIOR WRITTEN APPROVAL; OR 2. THE INFORMATION IS OTHERWISE IN THE PUBLIC DOMAIN BEFORE THE DATE OF RELEASE. B. REQUESTS FOR APPROVAL SHALL IDENTIFY THE SPECIFIC INFORMATION TO BE RELEASED, THE MEDIUM TO BE USED, AND THE PURPOSE FOR THE RELEASE. THE CONTRACTOR SHALL SUBMIT ITS REQUEST TO THE CONTRACTING OFFICER AT LEAST 45 DAYS BEFORE THE PROPOSED DATE OF RELEASE. C. THE CONTRACTOR AGREES TO INCLUDE A SIMILAR REQUIREMENT IN EACH SUBCONTRACT UNDER THIS CONTRACT. SUBCONTRACTORS SHALL SUBMIT REQUESTS FOR AUTHORIZATION TO RELEASE THROUGH THE PRIME CONTRACTOR TO THE CONTRACTING OFFICER. e— o1j, it �Z7i r . i 4t x . BY Vi - ot I